HomeMy WebLinkAboutResolutions 5588 - Establishing the Fee Schedule for Lane/Shoulder/Path Mitigation Fees for Street Right-of-way ObstructionsVersion February 2023 RESOLUTION 5588 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, ESTABLISHING THE FEE SCHEDULE FOR LANE/SHOULDER/PATH MITIGATION FEES FOR STREET RIGHT OF WAY OBSTRUCTIONS WHEREAS, the City is authorized under Ordinance No. 2058 and Bozeman Municipal Code Sec. 34.02.040 to issue permits for street obstructions or encumbrances and collect mitigation fees for lane/shoulder/path obstructions within street right of way; WHEREAS, pursuant to Bozeman Municipal Code Sec. 34.02.040.B the Director of Transportation and Engineering is authorized to set fees for Lane/Shoulder/Path Mitigation; WHEREAS, Lane/Shoulder/Path Mitigation fees are based on the spatial and temporal impact of the obstruction to the public, an evaluation of typical traffic control costs, and evaluation of appropriateness against peer-city comparison of similar fees set elsewhere; NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the fees for Lane/Shoulder/Path Mitigation shall be set as follows: Section 1 A schedule of Lane/Shoulder/Path Mitigation fees can be found in Exhibit A. Section 2 The Lane/Shoulder/Path Mitigation fees shall be effective July 1, 2024. Section 3 Pursuant to the authority granted in Bozeman Municipal Code Section 34.02.040 B, the Director of Transportation and Engineering may administratively adjust the Lane/Shoulder/Path Mitigation fees depending upon effectiveness of the existing rates. DocuSign Envelope ID: ED62E606-C92E-4BE9-8306-79C91DD3966A
Version February 2023 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the _____ day of ___________________, 2024. ___________________________________ Terry Cunningham Mayor ATTEST: ___________________________________ Mike Maas City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney DocuSign Envelope ID: ED62E606-C92E-4BE9-8306-79C91DD3966A
26th March
Project Name:
Permit Number:
Address of Work:
Street Name:
Area of Closure
Parking Lane 0.20$ x x= -$ 0.40$ -$
Bike Lane 0.30$ x x= -$ 0.60$ -$
Partial travelway closure 0.50$ x x= -$ 1.00$ -$
Full travelway closure 1.00$ x x= -$ 2.00$ -$
Sidewalk/Shared Use Path 0.30$ x x= -$ 0.60$ -$ -$ -$
Area of Closure
Parking Lane 0.20$ x x= -$ 0.40$ -$
Sidewalk/Shared Use Path 0.30$ x x= -$ 0.60$ -$
Partial travelway closure 0.50$ x x= -$ 1.00$ -$
Full travelway closure 1.00$ x x= -$ 2.00$ -$
Alley 0.20$ x x= -$ 0.40$ -$ -$ -$
* Permitted Days is the number of days included in the approved permit minus the 3 day grace period
** Effective Closure length for collector and arterial streets is the distance along the route between detour points
***Effective Closure length for local streets is the distance between the barriers
Sidewalk fee is not charged if the closed sidewalk area is served by a covered or open walkway
For Arterial and Collector Streets
Additional Fee
For Local Streets and Alleys
Fee Rate (per
linear ft)
Permitted
Days*
Effective Closure
Length (ft)***Permit Fee Fee Rate (per
linear ft)
Days beyond
permit Additional Fee
Fee Rate (per
linear ft)
Permitted
Days*
Effective Closure
Length (ft)**Permit Fee Fee Rate (per
linear ft)
Days beyond
permit
EXHIBIT A
RESOLUTION 5588
DocuSign Envelope ID: ED62E606-C92E-4BE9-8306-79C91DD3966A