HomeMy WebLinkAbout24051 Staff Report Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 1 of 25
Application No. 24051 Type Site Plan
Project Name 8 Aspen SP
Summary Site plan application to build an apartment building northeast of the corner of West
Aspen Street and North 8th Avenue on seven parcels located behind the U-Haul property.
The application proposes to build two commercial spaces, and 289 one-bedroom apartments
in a 7-story building zoned B-2M. Two stories are proposed with structured parking. This is
an affordable housing project with a portion of the apartments to be offered for rent at 60%
AMI. Affordable Housing incentives are requested under BMC 38.380.030 for increased
building height. A departure for housing creation under BMC 38.320.070 was requested to
reduce open space requirements by 20%, requiring 23,120 square feet with 26,712 square
feet proposed to be provided. On-site improvements include site improvements, alley
improvements, utility mains, and stormwater facilities. Off-site improvements include the
construction of North 8th to Juniper Street, and the construction of West Aspen Street from
7th Avenue to 8th Avenue. The applicant is requesting a departure to open space
requirements discussed in Section 38.320.070 for a reduction of the required open space to
allow for housing creation.
Zoning B-2M Growth Policy Community Commercial
Mixed Use
Parcel Size 1.447 Acres
Overlay District(s) None
Street Address 802 – 910 N. 8th Avenue
Legal Description The South 35’ of Lot 12 and All of Lots 13-18 in Block 2, Durston’s Second Subdivision, Located
in the SE 1/4 of Section 1, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana.
Owner Midtown 8th, LLC, Attn: Mathieu Tebele, 767 Fifth Avenue 37th Floor, New York, NY 10153
Applicant Same as applicant
Representative Intrinsik Architecture, 106 E. Babcock St Suite 1A, Bozeman, MT 59715
Staff Planner Danielle Garber Engineer Suzanne Ryan
Noticing Public Comment Period Site Posted Adjacent Owners
Mailed
Newspaper Legal Ad
7/9/2024-7/30/2024
7/9/2024 7/9/2024 N/A
Advisory Boards Board Date Recommendation
Development Review
Committee
6/14/2024 The application is adequate, conforms to
standards, and is sufficient for approval with
conditions and code provisions
Recommendation The application is adequate, conforms to standards, and is sufficient for approval with conditions and
code provisions as noted below.
Decision Authority Director of Community Development Due 8/13/2024
Full application may be found at the City’s online document repository for Application 24051 and may be viewed
digitally at The City of Bozeman Department of Community Development, 20 E. Olive Street
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 2 of 25
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to construct 289 1-bedroom apartment units, 2
commercial spaces, and associated access, parking, open space, and infrastructure improvements. The purposes of the Site
Plan review were to consider all relevant evidence relating to public health, safety, welfare, and the other purposes of Ch. 38,
BMC; to evaluate the proposal against the criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine
whether the application should be approved, conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were
provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this ______ day of 2024, Erin George, Interim Director of Community Development, approved with
conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying
an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision
as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 3 of 25
CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions
of approval and code corrections may be identified during staff review and will be included with the final report provided to the
Director of Community Development.
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions
of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
CODE PROVISIONS
1. BMC 38.320.050. A subdivision exemption application approval and recorded amended plat is required to
aggregate the 7 lots and establish any necessary additional easements or rights-of-way prior to final plan approval.
2. BMC 38.420.030. Provide cash-in-lieu of parkland (CILP) approval from the Parks Department, and payment prior
to final site plan approval.
3. BMC 38.380.040.E. The applicant and owner, if different, must consent to the City recording a summary of
the affordable housing prior to final site plan approval.
4. BMC 38.380.060. The applicant and owner, if different, must record and provide to the City of Bozeman a Notice of
Restrictions for the Affordable Housing Plan and a Declaration of Restrictive Covenants that implements the
affordable housing plan prior to final site plan approval.
5. BMC 38.410.130. Water Adequacy: The development's estimated annual municipal water demand is 26.41 acre-
feet. The annual demand must be offset prior to site plan approval. To offset the demand by paying cash-in-lieu of
water rights a fee of $158,485 must be made prior to final site plan approval.
The City encourages and supports water conservation through a rebate program for high efficiency
fixtures. The rebate value is approximately 20% of the fee for the residential units, released at occupancy,
if high-efficiency fixtures (toilets, washers, and shower heads) are installed due to reduced water use. A
rebate agreement template outlining the terms of the rebate offer has been provided to the applicant team.
If the owner is interested in pursuing the rebate, please complete the track changes with the owner
information and send the word document to Griffin Nielsen at gnielsen@bozeman.net. If there are any
questions about the agreement, please reach out over email. The agreement must be finalized prior to final
site plan approval.
6. BMC 38.270.030.C. The applicant proposes concurrent construction of the building and the infrastructure
improvements. The applicant must fulfill the requirements of section 38.270.030 D, BMC prior to the issuance of a
building permit for the proposed development or per 38.270.C complete construction of all off-site infrastructure first.
7. BMC 38.230.100. Section A.6.2.a review criteria include the “design of the pedestrian and vehicular circulation
systems to assure that pedestrians and vehicles can move safely and easily both within the site and between
properties and activities within the neighborhood area;” Areas Include: Aspen Street, BMX Bike Park, Local
Businesses and Restaurants, Farmers Market, Near Downtown, etc. The applicant must install a rectangular rapid-
flashing beacon pedestrian crossing at the intersection of North 7th and Aspen Street prior to occupancy. The
crossing must be approved by the Montana Department of Transportation (MDT) through their Systems Impact
Action Process. If the MDT does not approve the pedestrian crossing, the applicant must provide documentation from
the MDT as to why the crossing cannot be installed at North 7th and Aspen.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 4 of 25
8. BMC 38.220.080.A.2.i.(4) – The applicant must provide and file with the County Clerk and Recorder’s office
executed Waivers of Right to Protest Creation of Special Improvement Districts (SIDs) on a City standard form for
lighting, paving and subgrade material, fiber optic conduit, curb/gutter, sidewalk, storm drainage facilities, and traffic
signals for the following:
a. Street improvements to N. 7th Avenue
b. Street improvements to N. 8th Avenue
c. Street improvements to Durston Road
d. Street improvements to Oak Street
e. Intersection improvements to Oak and 7th Avenue
f. Intersection improvements to W Juniper Street and 7th Avenue
g. Intersection improvements to W Aspen Street and 7th Avenue
h. Intersection improvements to Durston and 8th Avenue
The document filed shall specify that in the event an SID is not utilized for the completion of these improvements,
the developer agrees to participate in an alternate financing method for the completion of said improvements on a
fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic
contribution from the development, or a combination thereof. The applicant must provide a copy of the filed SID
waiver prior to final plan approval.
ADVISORY COMMENTS
1. The applicant is advised that the property located to the west of N. 8th Avenue and south of the subject property is
privately owned and not available for construction staging, parking, or any other activities that trespass upon the
adjacent private property unless a private agreement is worked out directly with the adjacent property owner. The
applicant is required to adhere to any approved construction management plans during the course of the building
and infrastructure construction processes and must mitigate any negative impacts on the adjacent property owners
including dust, drainage, and maintenance of any existing fencing if damaged. Please also be advised that no
parking or trespass on these properties by tenants is permitted.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 5 of 25
Figure 1: Current Zoning Map
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 6 of 25
Figure 2: Future Land Use Map
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 7 of 25
Figure 3a: Proposed Site Plan Open Space Floor 1
Figure 3b: Proposed Site Plan Open Space Floors 2 & 3
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 8 of 25
Figure 3c: Proposed Site Plan Open Space Floors 4, 5, 6, & 7
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 9 of 25
Figure 4: Civil Site & Utility Plan
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 10 of 25
Figure 5a: Landscaping Plan
Figure 5b: Planting Plan
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 11 of 25
Figure 6: Building Elevations
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 12 of 25
ANALYSIS AND FINDINGS
Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance with Article 1 - Consistency with the City’s adopted Growth
Policy 38.100.040.D
Meets Code?
Growth Policy Land Use Community Commercial Mixed Use Yes
Zoning B-2M, Community Business District Mixed Yes
Comments: The project conforms to the requirements of the B-2M zoning district. B-2M is an
implementing district of the 2020 Community Plan designation of Community Commercial Mixed Use.
“The ‘Community Commercial Mixed Use’ category promotes commercial areas necessary for economic
health and vibrancy. This includes professional and personal services, retail, education, health services,
offices, public administration, and tourism establishments. Density is expected to be higher than it is
currently in most commercial areas in Bozeman and should include multi-story buildings. Residences on
upper floors, in appropriate circumstances, are encouraged. The urban character expected in this
designation includes urban streetscapes, plazas, outdoor seating, public art, and hardscaped open space
and park amenities. High-density residential areas are expected in close proximity” (Bozeman MT 2020
Community Plan pg. 54).
Goal N-1.1 – Promote housing diversity, including missing middle housing.
Goal N-3.3 – Encourage distribution of affordable housing units throughout the City with priority
given to locations near commercial, recreational, and transit assets.
Goal N-3.9 – Ensure an adequate supply of appropriately designated land to accommodate Low
Income Housing Tax Credit development in qualifying census tracts.
Goal DCD-1.5 – Identify underutilized sites, vacant, and undeveloped sites for possible
development or redevelopment, including evaluating possible development incentives.
Goal DCD-1.9 – Promote mixed-use developments with access to parks, open space, and
transit options.
Goal DCD-2.2 – Support higher density development along main corridors and at high visibility
street corners to accommodate population growth and support businesses.
Goal DCD-2.7 – Encourage the location of higher density housing and public transit routes in
proximity to one another.
Goal EPO-3.2 – Ensure complete streets and identify long-term resources for the maintenance
of year round bike and multi-use paths to improve utilization and reduce annual per capita
vehicle miles traveled.
Goal M-1.1 – Prioritize mixed-use land use patterns. Encourage and enable the development of
housing, jobs, and services in close proximity to one another.
Goal EE-1.4 – Support employee retention and attraction efforts by encouraging continued
development of affordable housing in close proximity to large employers.
This proposed project meets the goals of the growth policy by allowing infill development on a vacant lot
which would provide residential units at density in close proximity to the existing mid-town commercial
corridor, providing commercial storefront space, as well as residential open space in the form of a
covered outdoor plaza. The proposed project will provide high density mixed uses within close proximity
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 13 of 25
to transit stops, and will also provide an extension of Aspen Street and North 8th Ave, facilitating
alternative routes for pedestrians and cyclists and a more complete street grid. Additionally, the existing
zoning of B-2M was adopted in conformance with the Growth Policy, a proposed use and structure which
complies with the zoning would also comply with the Growth Policy.
2. Conformance with Article 1 - All other applicable laws, ordinances, and
regulations (38.100.080)
Condominium ownership N/A
Comments: No condominium ownership is proposed.
3. Conformance with Article 2, including the cessation of any current violations
(38.200.160)
Meets Code?
Current Violations None Yes
Comments: There are no current violations on the property.
4. Conformance with Article 2 - Submittal material (38.220) requirements and
plan review for applicable permit types (38.230)
Meets Code?
Site Plan Yes
Submittal requirements 38.220.100 Yes
Phasing of development
38.230.020.B
No. of phases: 1 Yes
Comments: The site plan criteria are met with this project. The proposal conforms to zoning provisions,
community design provisions, and project design provisions. See analysis below for how the required
standards of each article have been met. Concurrent Construction has been requested by the applicant
to allow simultaneous construction of the proposed building and required supporting infrastructure. The
required infrastructure improvements include adjacent improvements that are subject to BMC
38.270.030.C. The requirements of this section including City and DEQ infrastructure review, approval
from the City Fire Marshall, execution of an Irrevocable Offer of Dedication, and an acceptable concurrent
construction plan, must be met prior to a building permit being issued for the development as required by
Code Provision 6.
Any additional use permit (Conditional Use Permit) 38.230.120 or (Special use
Permit) 38.230.120
NA
Comments: No conditional or special uses are proposed or required for the proposal.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 14 of 25
5. Conformance with Article 3 - Zoning Provisions (38.300) Meets
Code?
Permitted uses 38.310 Apartments, Apartment Buildings Yes
Form and intensity standards 38.320
Zoning: B-2M
Table 38.320.050
Setbacks
(feet)
Structures Parking / Loading Yes
Front Block
Frontage
Block Frontage
Rear 10 5
Side 5 5
Alley 5 NA
Comments: Apartments and apartment buildings are primary uses within the B-2M district. The proposed
project is meeting setback requirements for the B-2M district. The applicant proposes a storefront block
frontage designation along Aspen, continuing the storefront designation that already exists to the east, as
well as a landscaped block frontage along N. 8th Avenue. Two 20-foot wide platted alleys border the
subject parcels on the east and north of the project. Parking spaces line the alleys (and are allowed
within the rear setback (Section 38.540.010.A.6.)
Block frontage standards also apply and dictate front setback building placement, building entrances,
parking location, and landscaping. See section 7a for further analysis.
Lot
coverage
53.9% Allowed: 100% Yes
Building
height
80.5 feet/7 stories Allowed: 50 feet- residential
only
five stories or 60 feet-
mixed use
Two additional stories
of height (maximum 15
feet per story) beyond
that allowed in the
UMU, REMU, B-2, B-
2M, and B-3 zoning
districts with shallow
incentives for
affordable housing
(BMC
38.380.030.C.3.c.)
Yes
Comments: Lot coverage and building height form and intensity standards are met with the proposed design.
B-2M allows for complete lot coverage. The building is 7 stories in total and provides for 40% of the units
within the development at 60% AMI to provide affordable housing and is thus able to take advantage of the
shallow incentives for affordable housing creation, which allows for an additional 2 stories in the applicable
B-2M zone. The structure contains a 10-foot stepback at the north and south aspects to comply with Table
38.320.050.note8.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 15 of 25
Zone Edge Transitions 38.320.060 Yes
Comments: No zone edge transition is required because this property is zoned B-2M and surrounded by
B-2M zoning. Zone edge transitions only apply to high density districts when located adjacent to lower
density residential districts. No lower density residential districts are present surrounding the site.
Applicable zone specific or overlay standards 38.330-40 NA
Comments: The project is not within an overlay district, or zoning district with additional specific
standards.
General land use standards and requirements 38.350 Yes
Comments: Section 38.350.050.D designates that parapets and elevator penthouses are exempt from
height restrictions, provided that no linear dimension of any such structure exceed 50 percent of the
corresponding street frontage line. Encroachments are proposed above the proposed 7-stories to
accommodate elevator penthouses. These areas do not exceed 50 percent of the either street frontage
and are largely hidden behind the provided parapet.
Applicable supplemental use criteria 38.360 NA
Supplemental uses/type None NA
Comments: No supplemental use criteria are triggered with the proposed uses in the application.
Wireless facilities 38.370 NA
Comments: No wireless facilities are proposed.
Affordable Housing 38.380.010 Yes
Affordable housing plan Yes, with
code
provision
Comments: For complete analysis regarding the Affordable Housing Administrator’s determination of
compliance with all affordable housing code provisions, see the Economic Development staff report
located in the project file online and at the Department of Community Development. Per code provisions
3 and 4 prior to final site plan approval, the applicant and owner, if different, must record and provide to
the City of Bozeman a Notice of Restrictions for the Affordable Housing Plan and a Declaration of
Restrictive Covenants that implements the affordable housing plan immediately following condition
approval of the Aspen 8 Site Plan. Also, the applicant and owner, if different, must consent to the City
recording a summary of the affordable housing plan immediately following conditional approval of
the Aspen 8 Site Plan.
The project proposes 116 housing units that are priced for rent at no greater than 60% of the Area
Median Income. All units would be one-bedroom units. The applicant has not delineated which units will
be affordable but states on page 2 of their ‘Affordable Housing Plan’, “The affordable units will be
throughout the building but will be primarily located on the lower levels. The intention is to mix the market
rate and affordable units together, so there is no distinguishable difference between the units.”
Per 38.380.030, “If the developer proposes to construct affordable homes that meet the standards in
Table 38.380.020-2 in the same geographically contiguous development as market rate homes, the
developer may apply the following incentives to all primary buildings in the development in which 50
percent or more of the gross floor area contains residential uses:” The developer is proposing to utilize
Section 38.38.030.C.3.c. which allows for “Two additional stories of height (maximum 15 feet per story)
beyond that allowed in the UMU, REMU, B-2, B-2M, and B-3 zoning districts.”
The Affordable Housing Administrator, has approved the Affordable Housing Plan for the project and
stated in their report, “The review authority has approved the Affordable Housing Plan for the Aspen
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 16 of 25
8 project and finds that the plan includes all information required for the City to confirm compliance with
the standards and criteria in BMC 30.380, including the standards in 38.380.030.A Incentives
Available. The requested incentives include two additional stories of height.”
6a. Conformance with Article 4 - Community Design Provisions: Transportation
Facilities and Access (38.400)
Meets Code?
Streets 38.400.010 Yes
Street and road dedication 38.400.020 Yes
Access easements Yes
Level of Service
38.400.060
Yes Transportation grid adequate to
serve site
Yes, with
condition
Comments: Currently, primary access roads exist in the form of legal right of way and built gravel, none
are built to City of Bozeman’s Design Standards and Specifications Policy (DSSP). As a part of this
proposal, the applicant would be required to construct streets to City of Bozeman’s Design Standards and
Specifications Policy (DSSP). Specifically, Aspen Street, from its intersection at North 7th will need to be
constructed through its intersection with North 8th Street, and North 8th Street will need to be constructed
through its intersection with West Juniper Street. Both concurrent constructions onsite (CCON) and offsite
(CCOFF) plans and applications were submitted with the application which indicates that the applicant
may be able to construct the proposed mixed-use structure while constructing the required infrastructure
improvements.
The applicant provided a Traffic Impact Study (TIS) conducted by Sanderson Stewart and has been
evaluated by engineering for adherence to adopted standards. The reviewing engineer looked at impacts
at the intersections of West Juniper and North 7th Ave and West Aspen and North 7th Ave based on
forecasted traffic volumes and agreed with the applicant conclusions that the proposed development will
operate at an acceptable level of service. Level of service standards for arterial and collector streets
serving the site was also evaluated by engineering. A Waiver of Right to Protest Creation of Special
Improvement Districts (SID’s) for future transportation improvements is required ensuring participation in
funding of future infrastructure improvements that may be required to offset impacts created by
development of the property.
BMC 38.400.060.4 states “[…] Intersections must have a minimum acceptable LOS of "C" for the
intersection as a whole.” The only location where the overall intersection LOS does not meet the
requirements of this section of the BMC is the intersection of North 7th Avenue and Peach Street.
However, the Montana Department of Transportation (MDOT) is currently in design for improvements to
the North 7th Avenue and Peach Street/Durston Road intersection to address the LOS deficiency. The
project is scheduled for construction in 2025. Based on MDOT’s imminent plans to address it, the North
7th Avenue and Peach Street/Durston Road intersection was excluded from the TIS per BMC
38.400.060.B.4.b. subsection 2, “Improvements to the intersection to raise the overall level of service to a
"C" or better are currently scheduled for commencement of construction within three years as shown on
the most recently adopted Transportation Capital Improvement Plan;”. The TIS demonstrated that every
other intersection as a whole would remain at better than LOS “C,” and therefore the requirement of the
BMC is met.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 17 of 25
Sidewalks 38.400.080 Yes, with
condition
Comments: Sidewalks both within and adjacent to the site along all street frontages are to be provided.
Street trees line the boulevard space between the street and sidewalk and landscaping is provided
between the building and sidewalk. Given the additional pedestrian and vehicular traffic that may result at
full build out, the City Engineers requested a summary of recommended mitigations to include any
access changes, pedestrian crossings, future considerations of signalization or signal timing changes.
Given the subsequent information, the City Engineers requested installation of a rapid-flashing pedestrian
beacon pedestrian crossing at the intersection of North 7th and Aspen Street, or a provide documentation
from the MDT as to why the crossing cannot be installed at North 7th and Aspen.
Drive access 38.400.090 Access to site: 2 Yes
Fire lanes, curbs, signage and striping Yes, with
condition
Comments: The parking area for the mixed-use structure would be accessed by a 20-foot alley that runs
along the northern and eastern property lines and connects West Aspen to North 8th Avenue. The eastern
section of the alley provides access to the first-floor parking area, and the northern access from the alley
provides access to the second-floor parking garage. The alley would be required to be built to City of
Bozeman’s Design Standards and Specifications Policy (DSSP). On the submitted ‘Civil Site & Utility
Plan’ the applicant has designated curbs throughout the alley to be painted red and designated as Fire
Lanes.
Street vision triangle 38.400.100 Yes
Transportation pathways 38.400.110 Yes
Pedestrian access easements for shared use pathways and similar transportation
facilities
NA
Public transportation 38.400.120 Yes
Comments: No new transportation pathways or trails are proposed with this application. Street design has
been evaluated by engineering and public sidewalks will be provided. Two existing Streamline bus stops
are located within 400-700 feet of the subject property including a covered stop near the Tamarack and
7th intersection.
6b. Conformance with Article 4 – Community Design Provisions: Community
Design and Elements (38.410)
Meets Code?
Neighborhood centers 38.410.020 NA
Comments: This project does not trigger neighborhood center requirements.
Lot and block standards 38.410.030-040 NA
Midblock crossing: rights of way for pedestrians alternative block delineation NA
Comments: This project does not trigger lot and block standards.
If the development is adjacent to an existing or approved public park or public
open space area, have provisions been made in the plan to avoid interfering
with public access to and use of that area
NA
Provisions for utilities including efficient public services and utilities
38.410.050-060
Yes
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 18 of 25
CIL of water Yes, with
code
requirement
Comments: The subject property is an infill site so existing infrastructure is available from adjacent
properties and through existing rights-of-way.
Rights-of-way surround the property in the form of West Aspen Street to the south, North 8th Street to the
west, and a platted alley which adjoins the north and east property lines.
A Water Sewer Storm Design Report was prepared by TD&H Engineering. This lot is undeveloped, so site
improvements include new water and sewer services, and storm drainage mitigation facilities. The estimated
annual municipal water demand from the project is 36.19 acre-feet (AF) (Appendix J – CILWR
Determination). At the City's current CILWR fee rate of $6,000/AF the CILWR fee for the project is $217,144.
The fee must be paid prior to final site plan approval. The City encourages and supports water conservation
through a rebate program for high efficiency fixtures. City Engineering Staff submitted comments stating,
“[…] this would be a great project for our high-efficiency rebate program. The program provides a rebates
of approximately 20% of the CILWR fee (~$43K) for the residential units if high-efficiency fixtures (toilets,
washers, and shower heads) are installed which meet the City Water Conservation Division standards. The
rebate would be released at occupancy and requires an agreement defining the terms and amount rebate to
be finalized and executed with the site plan.”
Engineering Division found the report to meet Design Standards.
Municipal infrastructure requirements 38.410.070 Yes
Comments: Requirements for municipal infrastructure have been reviewed by the Engineering
Department for functionality and compliance with adopted standards. A separate process for on and off-
site infrastructure review is required through the Engineering Division prior to construction of
infrastructure improvements. This process includes permit submittal and review, a pre-construction
submittal review and meeting, inspections, and acceptance.
Grading & drainage 38.410.080 Yes
Location, design and capacity of stormwater facilities Yes
Stormwater maintenance plan Yes
Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H NA
Comments: The applicant has proposed an underground infiltration chamber to mitigate on-site stormwater
runoff. No surface ponds are proposed. The applicant states, “A geotechnical drilling investigation was
conducted at the site on July 23, 2021. Groundwater was not observed in 5 boreholes that were drilled to a
depth of 20-feet. However, 2021was a regionally dry year so additional well log information was reviewed to
verify anticipated groundwater depths. Four monitoring wells were drilled at the adjacent U-Haul facility in
May of 1990. All 4 well logs reported groundwater encountered at depths ranging from 20.5 to 21.5 feet
below the ground surface. Therefore, it is anticipated that groundwater will be sufficiently deep even with
seasonal fluctuations to allow for a full retention/infiltration strategy to be successful at this site.”
Grading and drainage have been reviewed by engineering and found to be adequate.
Watercourse setback 38.410.100 NA
Watercourse setback planting plan 38.410.100.2.f NA
6c. Conformance with Article 4 – Community Design Provisions: Park and
Recreation Requirements (38.420)
Meets Code?
Parkland requirements 38.420.020.A 0.53 acres of parkland required Yes
Cash donation in lieu (CIL) 38.420.030 Yes
Improvements in-lieu NA
Comments: The applicant provided a response to Resolution 4784 which provides guiding criteria for
acceptance of CIL of Parkland. This was reviewed by the Parks Department and the CIL proposal by the
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 19 of 25
applicant was considered favorably as an infill site located in a commercial zoning district with nearby
park access. 38.420.020 caps maximum park dedication requirements to 12 dwellings per acre. The
project proposes to provide CIL of parkland for the project. The subject property is approximately 1.45
acres and proposes 289 units. Therefore 0.53 acres worth of parkland must be dedicated for the proposal
(1.45 acres x 12 dwelling units x .03 acres= 0.53 acres of parkland). The City of Bozeman Parks
Department staff commented that the CILP value would be increasing to $2.65/sf. Given the amount of
parkland required and the valuation of the land, $60,025.15 is required as the total cash donation in lieu
of parkland. (23,086.8 square feet x $2.65/sf= 61,180.02)
The applicant is required to provide approval for this proposal from the Director of Parks and pay the CIL
amount prior to final site plan approval.
Park Frontage 38.420.060 NA
Park development 38.420.080 NA
Recreation pathways 38.420.110 NA
Park/Recreational area design NA
Comments: No parks are proposed with this application. A public park exists approximately 900 feet to
the east at the corner of Aspen St. and N. 5th Ave. Additional smaller parks are also located within a
quarter mile of the subject site.
7a. Conformance with Article 5 – Project Design: Block Frontage Standards
(38.510)
Meets Code?
Block frontage classification Storefront and Mixed-Landscaped Yes
Departure criteria None requested Yes
Comments: Currently, the site is undeveloped. Legal access exists surrounding the property but
transportation facilities have not been built to DSSP The applicant has shown on Appendix C of their
submittal a Block Frontage Diagram designating North 8th as Landscaped Block Frontage. Pursuant to
Section 38.510.020.D. “The default block frontage for new or undesignated streets (such as those within
annexed land) in commercial and mixed-use zones is Mixed (see the mixed block frontage provisions set
forth in section 38.510.030.D).” As North 8th is to be constructed and is set between Mixed Use Zoning to the
east and High Density Residential Mixed-Use Zoning to the west, the plan would be reviewed for compliance
with Mixed Block Frontage Standards along North 8th Avenue. Aspen Street is designated as Storefront
Block Frontage.
The applicant is designating the first two floors as a parking structure. They have proposed commercial floor
space wrapping never less than 20 feet deep of habitable and conditioned space along Aspen Street and
North 8th Avenue (Shown on Level 1- Overall Floor Plan). Meeting both parking structure standards and
Storefront standards, the first floor is 16 feet tall (see Building Sections). The parking structure is accessed
from the alley adjoining the property to the north and east.
Along the southern portion of the building, fronting onto Aspen Street, the applicant has shown the required
10-foot utility easement and set the building along the extent of the easement to comply with Building
Placement requirements. There are individual entrances to the two available commercial spaces on the first
floor. According to the applicants narrative, “The site meets all the block frontage requirements by including a
12’ sidewalk, weather protection at an average depth of 5’ and transparent storefront glazing along 60% of
the of the length of the frontage for the portion designated storefront” (Narrative pg.8). There is a sidewalk
approximately 22 feet wide (10-foot utility easement in addition to the 12-foot minimum sidewalk width).
Lastly on their Exterior Elevations exhibit, the applicant designates there is 638ft2 of available wall area
between 30” and 10’ above the sidewalk and has designed 392ft2 of transparency which meets the standard
of 60% transparency required with 61% transparency provided (Exterior Elevations). The storefront weather
protection and expanded sidewalk is proposed to also wrap around the southwest corner of the N. 8th and
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 20 of 25
Aspen corner and connect to the primary residential entrance along North 8th. All Storefront Block Standards
along Aspen Street are met.
Along the Western portion of the building, fronting onto North 8th Avenue, the applicant has opted to utilize
the Mixed-Landscape Block Frontage standards. On the site plan the applicant designated the required 10-
foot utility easement which also puts the building in compliance with the minimum 10-foot setback Building
Placement requirement. There is an entrance to the commercial space, one to the residential lobby, and two
to the bike storage area on the first floor. All entrances are visible and accessible from the street. According
to the applicants narrative, “The site meets all the block frontage requirements by including… weather
protection at an average depth of 5’ “(Narrative pg.8). This exceeds the required 3 feet of weather protection
required. Parking was discussed previously and complies with the structured parking standards. Areas not
utilized for the required 5-foot minimum sidewalk have been landscaped pursuant to the standard (seen on
the Planting Plan). All Mixed-Landscaped Block Standards along North 8th Avenue have been met.
7b. Conformance with Article 5 – Project Design: Site Planning and Design
Elements (38.520)
Meets Code?
Design and arrangement of the elements of the plan (e.g., buildings, circulation,
open space and landscaping, etc.) so that activities are integrated with the
organizational scheme of the community, neighborhood, and other approved
development and produce an efficient, functionally organized and cohesive
development
Yes
Relationship to adjacent properties 38.520.030 NA
Non-motorized circulation and design systems to enhance convenience and
safety across parking lots and streets, including, but not limited to paving
patterns, pathway design, landscaping and lighting 38.420.040
Yes
Comments: Pedestrian paths through the site and to the open space and service areas meet the
standards in this section for location, connections, and widths. A minimum 7-foot wide sidewalk is
provided along the surface parking lining the alley to connect the front, and rear of the site, and allow for
vehicle overhang. All entrances to the building provide connections to a public sidewalk.
Design of vehicular circulation systems to assure that vehicles can move
safely and easily both within the site and between properties and activities
within the general community 38.420.050
Yes
Internal roadway design 38.520.050.D NA
Comments: Primary access roads are required to be built as a part of this proposal, including alleys which
provide access to the parking structure (shown on Level 1 Floor Plan and Level 2 Floor Plan). Both levels
of the parking structure have accesses of at least 24’. The first-floor parking accessed from the eastern
leg of the alley, and the second-floor parking is accessed from a ramp off of the northern leg of the alley.
The parking is set at 90-degrees and the driving aisle is 24 feet wide for both levels of the parking
structure. Vehicular circulation meets standards.
On-site open space 38.520.060
Total required 28,900 ft2 Yes
Total provided 26,267ft2 Yes
Comments: Open space is to be provided via shared outdoor open space, private unit balconies, and
shared indoor areas to include a lobby, pet wash, tenant collab., gym, bike repair, media room, and
lounges. The submitted material shows 26,712ft2 of open space provided, however, included in the
calculation is 581ft2 of open space provided in the form of an elevator lobby. The 136ft2 portion of the
lobby with amenities provided could contribute, but the entire space does not meet the standard or intent
of open space as Section 38.520.060.B.4.b states, “The space must be designed specifically to serve
interior recreational functions and not merely be leftover unrentable area used to meet the open space
requirement. Such space must include amenities and design elements that will encourage use by
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 21 of 25
residents.” To resolve this deficit of open space, the applicant has requested a departure. Table
38.320.070 allows for a departure in Useable Open Space up to a “20% reduction for any new
development within one-quarter mile pedestrian travel distance of an existing park.” Section
38.320.070.C states, “To approve departures the review authority must determine that criteria 1 and 2;
and at least one of criteria 3—5 are met:
1. The departure will result in at least one more home than would otherwise be possible; and
The applicant states on page 15 of the Narrative, “By allowing this departure, approximately
20 more units will be built.” The size of the units offered ranges from approximately 350ft2
to about 470ft2. There is a discrepancy between open space provided and open space
required of 2,633ft2. Given the size of the units, approximately 7 more units could be
created by allowing the departure.
2. The purpose of the standard can still be accomplished if the departure is granted; and
The applicant states on page 16 of the narrative, “The intent of the standard is to provide a
space that is suitable for leisure and recreational activities. Even with the 20% reduction the
intent of the standard is still met. The 8 Aspen project proposes more residential amenities
than typical multifamily projects. Therefore, while the overall square footage is slightly less,
the amenity value is significantly higher.” The applicant is requesting a 9% reduction for
their departure. With the development as a whole, approximately half an acre of open space
has been provided with amenities which include bike repair stations, community media
rooms, shared outdoor spaces, collaboration rooms, gym and pet wash. The intent of the
standard would still be met if the departure were granted.
3. The departure will not impose negative impacts on surrounding property; or
The applicant states on page 16 of the narrative, “The departure should have no effect on
the surrounding neighborhood. There are significant leisure and recreational opportunities
on site. Additionally, there are a variety of amenities to appeal to a wide range of residents.”
Neighboring properties are generally commercial or industrial. An existing park is
approximately 0.17miles from the proposal which is well within the quarter-mile required by
the departure standards. There would be no foreseen negative impacts from the requested
departure.
4. The departure is applicable to missing middle housing; or
The applicant states on page 16 of the narrative, “The project is proposing to
dedicate 40% of the units as deed restricted to LIHTC affordable units.” Missing middle
housing is defined in Section 38.700.120 as, “A residential building containing two, three, or
four dwellings in any configuration, as well as townhomes and cottage housing.” This is a
mixed-use residential building with 289 apartment units. This standard would not be met.
5. The departure is applicable to an infill site.
The applicant states on page 16 of the narrative, “While the project site is adjacent to
undeveloped portions of the city it is wholly surrounded by development. This project will
also expand vital portions of the city’s infrastructure and will infill missing gaps of
infrastructure.” Infill is defined in Section 38.700.100 as, the development or redevelopment
of vacant, abandoned, or underutilized properties within or wholly surround by the City, and
where water, sewer, streets, and fire protection have already been developed and are
provided. Infill is development proposed or located within land that has been subdivided for
at least 35 years.” The proposal encompasses 7 Lots which are a part of the Durston’s
Second Subdivision, which was platted in 1951 (Plat of Durston’s Second Subdivision). The
departure is applicable to an infill site.
Criteria 1-3 and 5 have been met which would meet the standard.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 22 of 25
7d. Conformance with Article 5 – Parking (38.540) Meets Code?
Parking requirements 38.540.050 Yes Yes
Parking requirements residential 38.540.050.A.1 0
Reductions residential 38.540.050.A.1.b NA
Parking requirements nonresidential
38.540.050.A.2
0
Reductions nonresidential 38.540.050.A.2.c NA
Provided off-street 162
Provided on-street 15
Bicycle parking 38.540.050.A.4 312
Comments: The minimum parking requirements of this section do not apply within the Midtown Urban
Renewal District the boundary of which is described in the Midtown Urban Renewal Plan adopted
pursuant to Ordinance 1925. The applicant is proposing 162 off-street parking spaces, which includes
compact and accessible spaces. Along North 8th Avenue are 15 on-street spaces, and 27 spaces along
Amenities are shown on open space floor plans (Level 1, 2-3, 4-5, 6-7) as well as the Architectural Site
Plan Responses portions of the application. The shared ground level open space is located within a large
contiguous area of outdoor space with modular planters which provide screening, with attached benches
for seating. Interior open space on the ground floor includes a bike storage and repair area, pet wash,
and tenant collaboration area. The second floor hosts another bike repair, gym facility, large lounge
space, and community media room. The second floor has a large, contiguous balcony along the western
side of the building and a smaller square balcony on the east side of the building with associated planter
boxes and seating for shared outdoor open space. On the residential levels 4 through 7 there is a
balcony on the western side of the building totaling 322 square feet and another larger on the eastern
side which totals about 560 square feet. These areas meet the requirements that they be in a visible area
and are designed to service recreational functions that encourage use by residents. Unit balconies
comprise 10,022ft2 which equates to less than 50% of the total required open space and meets the
dimensional and area requirements from this section.
Location and design of service areas and mechanical equipment 38.520.070 Yes
Comments: Utility meters are shown on the Planting Plan and are screened by landscaping 4 feet in
height as well as a gazebo with a metal screen to adequately screen the utilities. Solid waste will be
collected via a heated concrete pad accessed via the alley (Civil Site and Utility Plan). Condensing units,
RTU units, and the backup generator are to be located on the roof and screened from public view utilizing
parapets.
7c. Conformance with Article 5 – Project Design: Building Design (38.530) Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site
and the adjacent neighborhoods and other approved development 38.530.030
Yes
Building massing and articulation 38.530.040 Yes
Building details, materials, and blank wall treatments 38.530.050-070 Yes
Comments: The building meets the building articulation and building design standards of this section. The
building is required to provide articulation at 30-foot intervals to reduce the perceived massing and add
visual interest. Building facade changes color and moving up in elevation along the building. Additionally
balconies and inset sections add additional articulation horizontally across the building, with utilizing a
change in material, color or an inset/outset section of building never more than about 17-20 feet apart.
Building materials are dominated by cementitious wall boards and panels, with areas of corrugated and
finished metal panels 24 gauge in thickness. The application is successfully mitigating the effects of using
primarily cement board panels with the use of varied colors and textures as required by this section.
Articulation features are best demonstrated by the Exterior Elevations portion of the application.
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 23 of 25
the eastern portion of the alley within the side setback (Civil Site and Utility Plan). Parking structures
account for the remaining off-street parking. The applicant has proposed an indoor bicycle storage room
that can house 210 bikes on the first floor and 82 on the second, for a total of 289 bike parking spaces
required and providing 292 (Level 1 Open Space). Additionally 20 bicycle parking spaces are provided
outdoors at the commercial storefront entry, residential entry, and within the open space plaza.
Loading and uploading area requirements 38.540.080 NA
First berth – minimum 70 feet length, 12 feet in width, 14 feet in height NA
Additional berth – minimum 45 feet length NA
Comments: NA
7e. Conformance with Article 5 – Landscaping (38.550) Meets Code?
Mandatory landscaping requirements 38.550.050 Yes
Drought tolerant species 75% required Yes
Parking lot landscaping Yes
Additional screening NA
Street frontage Yes
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas Yes
Irrigation: plan, water source, system type Yes
Residential adjacency NA
Comments: The provided landscaping plan conforms to standards.
Landscaping of public lands 38.550.070 Yes
Comments: Street trees will be provided along all frontages.
7f. Conformance with Article 5 – Signs (38.560) Meets Code?
Allowed SF/building 38.560.060 NA NA
Proposed SF/building NA NA
Comments: No signage is proposed with this application. A separate sign permit is required prior to the
installation of any commercial signs or residential identification signage.
7g. Conformance with Article 5 – Lighting (38.560) Meets Code?
Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 Yes
Building-mounted lighting (supports, cutoff, footcandles, temperature)
38.570.040.B
Yes
Comments: The application proposes wall lighting over internal walkways, recessed lighting at entries,
and wall mounted lighting, and flood lighting for the structured parking lots. The lighting meets the
required cutoff and intensity requirements.
8. Conformance with Article 6 – Natural Resource Protection Meets Code?
Floodplain regulations 38.600 NA
Wetland regulations 38.610 NA
Comments: NA
9. Relevant Comment from Affected Parties (38.220) Meets Code?
Public Comment Yes
Comments: A public notice period was conducted meeting the requirements of this section and detailed on
page 1 of this report. One letter of public comment was received. The letter has been placed in the project
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 24 of 25
file for review by the Community Development Director with this report, and has been provided to the City
Clerk’s office for distribution to City Management and the City Commissioners. The letter was received from
the Maxey Limited Partnership which owns adjacent vacant property and is summarized as follows:
Concerns were provided related to the proposed development of the subject property, as well
nearby development not within the scope of this report. The staff summary and response is limited
to the subject property.
Trespassing. Trespassing problems were discussed including concerns about tradesman and
contractors parking on the adjacent property during development of the site. The letter requested
specific requirements to limit encroachment to the adjacent property. Staff has added an advisory
comment related to construction management and trespassing for review by the applicant. The
owner of the adjacent property concerned about construction encroachment into their property may
choose to repair or erect fences and no trespassing signs within the requirements of the Bozeman
Municipal Code and report any trespassing incidents to the Police or Code Compliance. This letter
has also been forwarded to the Police Chief and the Neighborhood Services Division which
manages parking enforcement and code compliance for their consideration and awareness.
Control and management of pets. Staff acknowledges that there is a lack of off-leash dog
facilities within the area of the subject property. However, the management of pets is not within the
site plan review criteria. No open space areas dedicated to dog runs or other pet recreation facilities
are provided with the application, nor are they required by the development code. The Parks
Department reviewed the application for adherence to their adopted parks plan, and the criteria of
Resolution 4784. The presence of a nearby off-lease dog facilities is not a criteria for accepting
cash-in-lieu of parkland. The property owner and future residents of the proposed building are
required to adhere to Chapter 8 of the Bozeman Municipal Code which governs restraint and
confinement of pets. The owner of the adjacent property concerned about pets loose on their
property may choose to repair or erect fences and no trespassing signs within the requirements of
the Bozeman Municipal Code and report any trespassing incidents to Animal Control.
Building height. The comment includes concerns about the proposed building height. Building
height and zoning requirements for the B-2M zone are contained in Section 5 of this report. The
applicant is meeting the required height limitations for a mixed-use building in B-2M zoning with the
application of shallow incentives for affordable housing available in BMC 38.380.030. These
incentives were adopted with Ordinance 2105 in 2022 through the City’s public legislative process.
In regards to the scale of surrounding development no low density residential districts are present
near or adjacent to the site only mixed-use commercial and high density residential. Zone edge
transitions are also discussed in Section 5.
A planned trail discussed in the narrative. Staff located the applicant’s mention of a planned trail
connection on the property to the west of North 8th Avenue. This trail connection between Durston
and Oak is located within the Parks, Recreation, and Active Transportation Plan adopted by the
Parks Department. There are no plans to connect or construct this trail within this application.
Parking. Parking is discussed in Section 7.d of this report. The minimum parking requirements in
the development code do not apply within the Midtown Urban Renewal District the boundary of
which is described in the Midtown Urban Renewal Plan adopted pursuant to Ordinance 1925
through the City’s public legislative process. The letter suggests a public parking structure or
arrangement with the Fairgrounds to alleviate parking pressure in the Midtown area. Those
suggestions are within the purview of the City Commission, Strategic Services, and Economic
Development Department. This public comment letter has been forwarded to those elected officials
and staff for consideration.
10. Division of Land Pertaining to Subdivisions (38.240-Part 4) Meets Code?
Subdivision exemptions Yes
Required easements Yes
Staff Report
8 Aspen Site Plan
Application No. 24051
August 6, 2024
Page 25 of 25
Comments: The proposed project lies over 7 lots previously platted with Durston’s Second Subdivision.
The applicant is proposing to aggregate all lots so that the proposed structure sets on one lot.
Stormwater is addressed through an underground stormwater retention system beneath the structured
parking. A 10-foot utility easement is proposed along North 8th Avenue and Aspen Street.