Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
036 A401 Building Sections - TruNorth Office
FIRST LEVEL0' -0"ROOF34' -0"T.O. FTG.-4' -0"B.O. FTG.-5' -0"SECOND LEVEL15' -0"T.O.W. FIRST LEVEL13' -0"T.O.W. SECOND LEVEL26' -6"T.O. PARAPET SECOND LEVEL29' -6"ABCFJIDEGHELEV. PIT SLAB-4' -0"1A4002A400KTENANT SPACE211TENANT SPACE111STAIR210FIRST LEVEL0' -0"ROOF34' -0"T.O. FTG.-4' -0"B.O. FTG.-5' -0"SECOND LEVEL15' -0"T.O.W. FIRST LEVEL13' -0"T.O.W. SECOND LEVEL26' -6"T.O. PARAPET SECOND LEVEL29' -6"ABCFJIDEGH1A4002A400TENANT SPACE207CORRIDOR201CORRIDOR101VESTIBULE100A4512FIRST LEVEL0' -0"ROOF34' -0"T.O. FTG.-4' -0"B.O. FTG.-5' -0"SECOND LEVEL15' -0"T.O.W. FIRST LEVEL13' -0"T.O.W. SECOND LEVEL26' -6"T.O. PARAPET SECOND LEVEL29' -6"ABCFJIDEGHELEV. PIT SLAB-4' -0"1A4002A400TENANT SPACE207TENANT SPACE109CORRIDOR101CORRIDOR201FIRST LEVEL0' -0"ROOF34' -0"T.O. FTG.-4' -0"B.O. FTG.-5' -0"SECOND LEVEL15' -0"T.O.W. FIRST LEVEL13' -0"T.O.W. SECOND LEVEL26' -6"T.O. PARAPET SECOND LEVEL29' -6"ABCFJIDEGHELEV. PIT SLAB-4' -0"1A4002A400TENANT SPACE109CORRIDOR101SHOWER RM.106TENANT SPACE207CORRIDOR201MECH. / ELEC.2054' - 0"STATUS:JOB NO.:CHECKED:DRAWN:Copyright © 2023 Springer Group Architects, P.C.9/6/2023 6:46:39 AM1340 E. Main St. Bozeman Montana9-6-2023RSSGAM21-018DESIGN DEV.A401TruNorth CenterTruNorth Construction OfficesBUILDING SECTIONSREVISION SCHEDULENO: DESCRIPTION: DATE: BY:1/8" = 1'-0"A401RE: 1/ A2001BUILDING SECTION - TENANT SPACE / STAIR1/8" = 1'-0"A401RE: 1/ A2002BUILDING SECTION - CORRIDOR / VESTIBULE1/8" = 1'-0"A401RE: 1/ A2003BUILDING SECTION - CORRIDOR / ELEV. / TENANT SPACE1/8" = 1'-0"A401RE: 1/ A2004BUILDING SECTION - SHOWER RM. / CORRIDOR / TENANT SPACE