Loading...
HomeMy WebLinkAbout035 A400 Building Sections - TruNorth OfficeFIRST LEVEL 0' -0" ROOF 34' -0" T.O. FTG. -4' -0"B.O. FTG. -4' -10" SECOND LEVEL 15' -0"T.O.W. FIRST LEVEL 13' -0" T.O.W. SECOND LEVEL 26' -6" T.O. PARAPET SECOND LEVEL 29' -6" ELEV. PIT SLAB -4' -0" 1 A401 2 A401 3 A401 4 A401 TENANT SPACE 111 WOMEN'S R.R. 103 CORRIDOR 101 MEN'S R.R. 105 SHOWER RM. 106 MECH. / ELEC. 107 STAIR 108 727 SF CORRIDOR 201 118 SF MEN'S R.R. 205 181 SF MECH. / ELEC. 206 195 SF STAIR 207 909 SF TENANT SPACE 211 A450 1 A450 2 1 A402 A450 3 T.O. PARAPET (ENTRY) 18' -6" FIRST LEVEL 0' -0" ROOF 34' -0" T.O. FTG. -4' -0"B.O. FTG. -4' -10" SECOND LEVEL 15' -0"T.O.W. FIRST LEVEL 13' -0" T.O.W. SECOND LEVEL 26' -6" T.O. PARAPET SECOND LEVEL 29' -6" 12345679148101513 ELEV. PIT SLAB -4' -0" 1 A401 2 A401 3 A401 4 A401 1112 TENANT SPACE 109CORRIDOR 101 TENANT SPACE 111 CORRIDOR 201 STAIR 210 STAIR 110 A451 1 1 A402 T.O. PARAPET (ENTRY) 18' -6" A451 3 STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2023 Springer Group Architects, P.C.9/11/2023 2:48:13 PM1340 E. Main St. Bozeman Montana9-11-2023 RSS GAM 21-018 PRICING SET A400TruNorth CenterTruNorth Construction OfficesBUILDING SECTIONSREVISION SCHEDULENO: DESCRIPTION: DATE: BY: 1/8" = 1'-0"A400 RE: 1/ A200 1 BUILDING SECTION - TENANT SPACE / COMMON CORRIDOR / STAIR 1/8" = 1'-0"A400 RE: 1/ A200 2 BUILDING SECTION - STAIR / TENANT SPACE / CORRIDOR / TENANT SPACE 0'4'8'16'32'