HomeMy WebLinkAbout24 - Task Orders Master - Tetra Tech - 24-25 Operations, Maintenance, and Monitoring Landfill
Tetra Tech
895 Technology Boulevard, Suite 101; Bozeman, MT 59718
Tel 406.582.8780 Fax 406.582.8790 tetratech.com
TASK ORDER
2024 - 2025 OPERATIONS, MAINTENANCE, AND MONITORING BOZEMAN LANDFILL August 7, 2024
CLIENT: CONSULTANT: The City of Bozeman Tetra Tech, Inc.
P.O. Box 1230 895 Technology Blvd, Ste 101 Bozeman, Montana 59711-1230 Bozeman, MT 59718
Attention: Mr. Cody Flammond Attention: Mr. Shane Matolyak INTRODUCTION
The purpose of this task order is to conduct tasks related to operations and maintenance of the Landfill Gas (LFG) handling system, Soil Vapor Extraction (SVE) system, and Air Injection (AI) system, and environmental monitoring of groundwater, methane, and leachate/condensate at the Bozeman Landfill (a.k.a. Story Mill Landfill). These activities will be conducted between July 1, 2024 and June 30, 2025 and are directed at meeting Montana Department of Environmental Quality (DEQ) Solid Waste rules and the requirements of DEQ’s June 6, 2014 letter requiring the City of Bozeman (COB) to conduct a Corrective Measures Assessment and implement
remedial measures. This task order also covers expansion of the SVE system to include seven new SVE wells in the southeast portion of the landfill. SCOPE OF SERVICES This task order includes the following work activities:
• Task 100 – LFG/SVE/AI Systems Operations and Maintenance
• Task 200 – Summer Groundwater Monitoring
• Task 300 – Winter Groundwater Monitoring
• Task 400 – Summer and Winter Groundwater Reporting
• Task 500 – SVE System Expansion
• Task 600 – Project Management and Administrative Support The scope of work for these tasks is outlined below.
Docusign Envelope ID: F2FB3482-0B29-4ADD-BA39-E5451000F147
Task Order – 2024 to 2025 Groundwater and Methane Monitoring and Assessment Bozeman Landfill, Bozeman, Montana July 30, 2024
Page 2 of 4
TETRA TECH
Task 100: LFG/SVE/AI Systems Operations and Maintenance
This task is to provide operations, maintenance, and monitoring of the LFG/SVE/AI systems. This work includes regular monitoring of the system’s Supervisory Control and Data Acquisition
(SCADA) system to ensure proper functioning and to identify and predict potential issues requiring preventative maintenance. Periodic site visits will also occur to replace consumable items (i.e., air filters, bearing grease), adjust ventilation and heaters in response to changing weather conditions,
observe well heads to identify and replace degraded components, and other similar operations and minor maintenance activities. Qualified subcontractors will complete major routine and unplanned maintenance as needed. Other monitoring included in this task consists of quarterly measurements of gas concentrations and flow rates at individual LFG and SVE wells, AI well flow rates, and perimeter methane monitoring with subsequent reporting to COB and DEQ. Semi-annual monitoring and reporting of the leachate/condensate discharge to the municipal wastewater treatment facility will also be
completed. Task 200: Summer (June and August) Compliance Groundwater Monitoring This task is to complete groundwater monitoring in accordance with the DEQ-approved
Groundwater Sampling and Analysis Plan (SAP), Bozeman Landfill, Gallatin County, Montana prepared by Tetra Tech on July 14, 2023. This plan specifies monitoring of up to 24 locations (i.e., monitoring wells, a seep, and two water supply wells) for volatile organic compounds (VOCs), chloride, sulfate, nitrogen, and metals. The actual number of monitored locations varies by year as specified in the SAP. Additional samples are collected to assess quality control and quality assurance.
This work generally consists of procuring disposable sampling equipment, rental of water quality meters, sample collection, and analytical laboratory analysis. Due to sample volume and equilibration constraints introduced by the DEQ-approved use of passive sampling devices, this work is split between two different events: one occurring in June and the other in August. Task 300: Winter Compliance Groundwater Monitoring This task is to complete groundwater monitoring in accordance with the 2023 SAP during the month of November or December. This work includes monitoring of 11 locations (i.e., monitoring
wells and a seep) for VOCs, chloride, sulfate, and nitrogen. Additional samples are collected to assess quality control and quality assurance.
As for Task 200, this work generally consists of procuring disposable sampling equipment, rental of water quality meters, sample collection, and analytical laboratory analysis.
Docusign Envelope ID: F2FB3482-0B29-4ADD-BA39-E5451000F147
Task Order – 2024 to 2025 Groundwater and Methane Monitoring and Assessment Bozeman Landfill, Bozeman, Montana July 30, 2024
Page 3 of 4
TETRA TECH
Task 400: Summer and Winter Groundwater Monitoring Reports
This task includes completion of two annual reports, one for each of the monitoring events completed under Tasks 200 and 300. Each report will include descriptions of the work completed and any deviation from the methods described in the 2023 SAP. The reports will also include
analytical laboratory reports and tabular and graphical depictions of pertinent data, comparison of water quality data to regulatory standards, statistical analysis of constituent detections and trends in conformance with the U.S. Environmental Protection Agency’s 2009 Statistical Analysis of
Groundwater Monitoring Data at Resource Conservation and Recovery Act (RCRA) Facilities – Unified Guidance, data validation and interpretation, and recommendations for future work if warranted. Each report will be submitted COB in draft form for review and editing prior to submittal to DEQ’s Solid Waste Division.
Task 500: SVE System Expansion This task will include construction oversight and reporting for the installation of four new SVE wells along the eastern boundary and three new SVE wells along the southern boundary. The new eastern boundary wells were previously designed and bid during March of 2022 but the bid was excessive, so the bidding documents were updated to include three additional SVE wells along
the southern boundary in order to attract additional bidders. A successful bidder was selected in spring 2024 and construction is scheduled to begin on August 12, 2024 and extend into mid- or late-September 2024. Task 600: Project Management, Statistical Analysis, and Reporting
Project management will include monthly administration / invoicing and progress reporting; semiannual budget forecasting and project summaries, scheduling of personnel, supplies procurement, and other related activities; communication with COB and DEQ; data management; and task order preparation for 2025-2026 monitoring activities. PERIOD OF PERFORMANCE Tetra Tech’s anticipated schedule to complete deliverables associated with the above-described tasks will be the following:
Deliverable Completion Date Quarterly Methane Perimeter Monitoring and Report July 1, 2024 through June 30, 2025
Summer Groundwater Monitoring August 30, 2024 and June 30, 2025
Winter Groundwater Monitoring December 31, 2024
Summer 2024 Groundwater Monitoring Report November 30, 2024
Winter 2024 Groundwater Monitoring Report March 31, 2025
SVE Well Installation and Completion Report June 30, 2024
Monthly Invoices and Progress Reports July 1, 2024 through June 30, 2025
Semiannual Budget Forecasting and Project Summaries Dec. 15, 2024 and June 30, 2025
Docusign Envelope ID: F2FB3482-0B29-4ADD-BA39-E5451000F147
Task Order – 2024 to 2025 Groundwater and Methane Monitoring and Assessment Bozeman Landfill, Bozeman, Montana July 30, 2024
Page 4 of 4
TETRA TECH
COSTS Estimated costs to complete the foregoing scope of services are shown below:
Task Description Estimated Cost
Task 100: LFG/SVE/AI Systems Operations and Maintenance $96,400.00
Task 200: Summer (June and August) Compliance Groundwater Monitoring $13,000.00
Task 300: Winter Compliance Groundwater Monitoring $10,000.00
Task 400: Summer and Winter Groundwater Monitoring Reports $34,600.00
Task 500: SVE System Expansion $34,000.00
Task 600: Project Management, Statistical Analysis, and Reporting $30,000.00
Total $218,000.00
Our costs will be on a time and materials basis. A detailed cost estimate can be provided upon request. SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of all terms and
conditions contained in Tetra Tech’s Professional Services Agreement with the City of Bozeman, dated July 31, 2024. CLIENT: CONSULTANT: City of Bozeman Tetra Tech
By: By:
Printed Name: Printed Name: Michael Hatten Title: Title:
Date: Date:
NOTICE OF CONFIDENTIALITY This Task Order (including attachments) contains information confidential to Tetra Tech, Inc., its subsidiaries, and subcontractors. It is intended only for City of Bozeman to consider Tetra Tech providing professional services at the Bozeman Landfill. Any other use is prohibited, without the prior written consent
of Tetra Tech.
Geosystems Operations Manager
08/07/2024
Docusign Envelope ID: F2FB3482-0B29-4ADD-BA39-E5451000F147
Acting City Manager
8/20/2024
Chuck Winn
Certificate Of Completion
Envelope Id: F2FB34820B294ADDBA39E5451000F147 Status: Completed
Subject: Complete with Docusign: G.4 BLF_2024-2025_Bzn_Landfill_O_M_Task_Order_-_Revised_Aug_2024.pdf
Source Envelope:
Document Pages: 4 Signatures: 1 Envelope Originator:
Certificate Pages: 5 Initials: 0 Mike Maas
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-07:00) Mountain Time (US &
Canada)
Stamps: 1 PO Box 1230
Bozeman, MT 59771
Mmaas@bozeman.net
IP Address: 69.145.83.100
Record Tracking
Status: Original
8/20/2024 7:00:48 PM
Holder: Mike Maas
Mmaas@bozeman.net
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Bozeman Location: DocuSign
Signer Events Signature Timestamp
Chuck Winn
cwinn@bozeman.net
Acting City Manager
City of Bozeman
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 69.145.83.100
Sent: 8/20/2024 7:02:05 PM
Viewed: 8/20/2024 7:27:14 PM
Signed: 8/20/2024 7:27:35 PM
Electronic Record and Signature Disclosure:
Accepted: 8/20/2024 7:27:14 PM
ID: 5b534e24-4fd4-4e01-a3f2-dac4a9d908cb
Mike Maas
mmaas@bozeman.net
City Clerk
City of Bozeman
Security Level: Email, Account Authentication
(None)Using IP Address: 69.145.83.100
Sent: 8/20/2024 7:27:36 PM
Viewed: 8/20/2024 7:34:44 PM
Signed: 8/20/2024 7:34:49 PM
Electronic Record and Signature Disclosure:
Accepted: 1/6/2020 4:08:14 PM
ID: 79370d6f-72a4-4837-866f-9ec31f00062f
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Michael Hatten
michael.hatten@tetratech.com
Geosystems Operations Manager
Security Level: Email, Account Authentication
(None)
Sent: 8/20/2024 7:34:50 PM
Electronic Record and Signature Disclosure:
Carbon Copy Events Status Timestamp
Accepted: 8/15/2024 10:01:08 AM
ID: a08344b2-e720-4be8-91f9-6dc709738208
Cody Flammond
cflammond@bozeman.net
Engineer II
Security Level: Email, Account Authentication
(None)
Sent: 8/20/2024 7:34:51 PM
Electronic Record and Signature Disclosure:
Accepted: 3/1/2023 4:02:16 PM
ID: 086c64a1-95e5-4a5f-9b5d-477e529bb83c
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 8/20/2024 7:02:05 PM
Certified Delivered Security Checked 8/20/2024 7:34:44 PM
Signing Complete Security Checked 8/20/2024 7:34:49 PM
Completed Security Checked 8/20/2024 7:34:51 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
CONSUMER DISCLOSURE
From time to time, City of Bozeman (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through the DocuSign, Inc.
(DocuSign) electronic signing system. Please read the information below carefully and
thoroughly, and if you can access this information electronically to your satisfaction and agree to
these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the
bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 7/9/2018 4:06:02 PM
Parties agreed to: Chuck Winn, Mike Maas, Michael Hatten, Cody Flammond
How to contact City of Bozeman:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: jolson@bozeman.net
To advise City of Bozeman of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at jolson@bozeman.net and in the
body of such request you must state: your previous e-mail address, your new e-mail address. We
do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from City of Bozeman
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to jolson@bozeman.net and in the body
of such request you must state your e-mail address, full name, US Postal address, and telephone
number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Bozeman
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to jolson@bozeman.net and in the body of such request you must
state your e-mail, full name, US Postal Address, and telephone number. We do not need
any other information from you to withdraw consent.. The consequences of your
withdrawing consent for online documents will be that transactions may take a longer
time to process..
Required hardware and software
Operating
Systems: Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X
Browsers:
Final release versions of Internet Explorer® 6.0 or above (Windows only);
Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above
(Mac only)
PDF Reader: Acrobat® or similar software may be required to view and print PDF files
Screen
Resolution: 800 x 600 minimum
Enabled Security
Settings: Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the ‘I agree’ button below.
By checking the ‘I agree’ box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC CONSUMER DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify City of Bozeman as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by City of Bozeman during the course of my relationship with you.