Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
046.2 - L303 PHASE 2 IRRIGATION PLAN
TTPROPOSED BUILDINGPHASE 2BOCCE BALL COURTIRRIGATEDTURFGRASSN. 7TH AVE 2"SIDEWALKPROPERTY LINE PROPERTY LINEPLANTING BEDS, TYP.DRIP ZONECONTROL VALVES, TYP.PROPOSED MAIN LINE, TYP.SLEEVING, TYP.DRIP RINGS TO ALL TREES& ZONED SEPARATELY, TYP.LATERAL LINES, TYP.HIGH-EFFICIENCY POINT-SOURCEDRIP IRRIGATION TO ALLPLANTING BEDS, TYP.SEAT WALLS, TYP.FFFFFFFFFFFFFFFLUSH VALVES AT ENDS/LOWPOINTS OF DRIP LINES, TYP.NPHASE 2IRRIGATIONPLANL303DATE3084 Thorpe RoadBelgrade, Montana 59714406.924.8038aly@outdoordesignstudios.comISSUE4/15/24 City SubmittalSAH 7TH & ASPEN-PHASE 1 & 2 654 & 706 N. 7Th Ave. Bozeman, MT 597156/28/24 City Submittal0SCALE: feet1020301" = 10'SCALE: 1"=10'-0"PHASE 2 - IRRIGATION PLANDrawn By: JDChecked By: AR7/29/24 Revised11