HomeMy WebLinkAbout046.1 - L302 PHASE 1 IRRIGATION PLANSTXref
C:
\
As
pe
k
t_
Sh
ar
ed
\
ASP
EK
T
A
RCH
I
TE
CT
UR
E\
AS
PE
KT
-
PR
OJ
EC
TS
\S
AH
-
7t
h
A
f
fo
rd
ab
l
e
Ho
us
i
ng
\D
RA
WI
NG
S\
AC
AD
\R
EV
I
T
EX
PO
RT
S\
20
24
.0
5.
31
S
i
te
p
l
an
to
C
i
vi
l
&
La
nd
s
ca
pe
\S
AH
_S
i
te
Pl
a
n_
05
-31
-
202
4-
SA
H_
PH
AS
E
2-
r
vt
-1
-
EN
LAR
GE
D
S
IT
E
P
LAN
-
PH
AS
E
1
&
2
.d
wg
STWPROPOSED BUILDINGPHASE 1N. 7TH AVE
DRY-LAWNSEED MIX2"2"PATIOSIDEWALKSIDEWALKPROPERTY LINE
PROPERTY LINEWIRELESS RAIN/FREEZE SENSORMOUNTED TO EXTERIOR OF BLDG.LOCATION TBD.HIGH-EFFICIENCY POINT-SOURCEDRIP IRRIGATION TO ALLPLANTING BEDS, TYP.DRIP ZONECONTROL VALVES, TYP.PROPOSED MAIN LINE, TYP.LATERAL LINES, TYP.SLEEVING, TYP.DRIP RINGS TO ALL TREES& ZONED SEPARATELY, TYP.POINT OF CONNECTION,LOCATED IN MECHANICALROOM. TAP & SET 1" WATER METER.COORDINATE WITHMECHANICAL AND ELECTRICAL.SEAT WALLS, TYP.TEMPORARY SPRAY IRRIGATIONTO FESCUE SEED MIXPOCCLKMFSBFIRRIGATION CONTROLLERPROPOSED QUICK COUPLERFOR WINTERIZATION BLOWOUTS.FFFFFFFFFFFFFFFFLUSH VALVES AT ENDS/LOWPOINTS OF DRIP LINES, TYP.NPHASE 1IRRIGATIONPLANL302DATE3084 Thorpe RoadBelgrade, Montana 59714406.924.8038aly@outdoordesignstudios.comISSUE4/15/24 City SubmittalSAH 7TH & ASPEN-PHASE 1 & 2
654 & 706 N. 7Th Ave.
Bozeman, MT 597156/28/24 City Submittal0SCALE: feet1020301" = 10'SCALE: 1"=10'-0"PHASE 1- IRRIGATION PLANDrawn By: JDChecked By: AR7/29/24 Revised11