Loading...
HomeMy WebLinkAbout046.1 - L302 PHASE 1 IRRIGATION PLANSTXref C: \ As pe k t_ Sh ar ed \ ASP EK T A RCH I TE CT UR E\ AS PE KT - PR OJ EC TS \S AH - 7t h A f fo rd ab l e Ho us i ng \D RA WI NG S\ AC AD \R EV I T EX PO RT S\ 20 24 .0 5. 31 S i te p l an to C i vi l & La nd s ca pe \S AH _S i te Pl a n_ 05 -31 - 202 4- SA H_ PH AS E 2- r vt -1 - EN LAR GE D S IT E P LAN - PH AS E 1 & 2 .d wg STWPROPOSED BUILDINGPHASE 1N. 7TH AVE DRY-LAWNSEED MIX2"2"PATIOSIDEWALKSIDEWALKPROPERTY LINE PROPERTY LINEWIRELESS RAIN/FREEZE SENSORMOUNTED TO EXTERIOR OF BLDG.LOCATION TBD.HIGH-EFFICIENCY POINT-SOURCEDRIP IRRIGATION TO ALLPLANTING BEDS, TYP.DRIP ZONECONTROL VALVES, TYP.PROPOSED MAIN LINE, TYP.LATERAL LINES, TYP.SLEEVING, TYP.DRIP RINGS TO ALL TREES& ZONED SEPARATELY, TYP.POINT OF CONNECTION,LOCATED IN MECHANICALROOM. TAP & SET 1" WATER METER.COORDINATE WITHMECHANICAL AND ELECTRICAL.SEAT WALLS, TYP.TEMPORARY SPRAY IRRIGATIONTO FESCUE SEED MIXPOCCLKMFSBFIRRIGATION CONTROLLERPROPOSED QUICK COUPLERFOR WINTERIZATION BLOWOUTS.FFFFFFFFFFFFFFFFLUSH VALVES AT ENDS/LOWPOINTS OF DRIP LINES, TYP.NPHASE 1IRRIGATIONPLANL302DATE3084 Thorpe RoadBelgrade, Montana 59714406.924.8038aly@outdoordesignstudios.comISSUE4/15/24 City SubmittalSAH 7TH & ASPEN-PHASE 1 & 2 654 & 706 N. 7Th Ave. Bozeman, MT 597156/28/24 City Submittal0SCALE: feet1020301" = 10'SCALE: 1"=10'-0"PHASE 1- IRRIGATION PLANDrawn By: JDChecked By: AR7/29/24 Revised11