Loading...
HomeMy WebLinkAbout042.1 - L102 NOTES & TABLESGENERAL NOTES1.ALL LANDSCAPED AREAS, SHALL HAVE PERMANENT UNDERGROUND IRRIGATIONINSTALLED TO ENSURE A HEALTHY LANDSCAPE. SEE IRRIGATION PLAN ANDNOTES.2.ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RE-GRADED, ROCKHOUNDED AND PLANTED AND MAINTAINED.3.ALL EDGING SHALL BE METAL (PRO EDGE-STEEL/ALUMINUM).4.ALL SHRUB BEDS SHALL BE LINED WITH PROFESSIONAL GRADE TYPAR WEEDFABRIC, AND COVERED WITH 3-4" OF 1 12" WASHED ROCK MATERIAL UNLESSOTHERWISE NOTED.5.ALL ROCK AND WOOD MULCH FINAL GRADE IS TO BE BELOW THE TOP OF CURBTO PREVENT MATERIAL FROM MIGRATING ONTO CURB AND WALKWAYS.6.ALL TREES SHALL BE STAKED WITH WOOD STAKES (MIN OF 2 PER TREE) ANYTREE OR SHRUB PLANTED THAT IS NOT IN A SHRUB BED SHALL HAVE A 3' DIAM. 4" DEPTH ORGANIC MULCH RING AT THE BASE.7.CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INSTALLATION,EXCAVATION, OR PLANTING.8.NO TREE SHALL BE PLANTED WITHIN 10' OF ANY FIRE HYDRANT, SEWER ORWATER LINE.9.ALL STREET TREES SHALL BE APPROVED BY CITY FORESTER AND PLANTEDSLIGHTLY HIGHER THAN GRADE AND WITH THE TREE COLLAR EXPOSED. THE HOLEEXCAVATED SHALL BE TWICE THE SIZE OF THE POT OR ROOT BALL OF THE TREE.10.ALL PLANTS SHALL BE GUARANTEED FOR ONE YEAR AFTER PROJECT COMPLETION.11.ALL IRRIGATED LAWN AREAS SHALL BE LOCALLY GROWN SOD. LAWNDRY MIX TOBE HYDROSEEDED.12.ALL LANDSCAPE AREAS ARE TO HAVE 6" MINIMUM TOPSOIL DEPTH TO PROMOTEPLANT GROWTH. (BESIDES AREAS WITHIN 5' OF BUILDINGS & ON ENGINEEREDSLOPES IN WHICH CASE ONLY AMENDED PLANTING HOLES MUST MEET THETOPSOIL REQUIREMENTS).13.PRIOR TO LANDSCAPE CONSTRUCTION, SOILS SHALL BE AMENDED ANDINSPECTED BY THE CITY OF BOZEMAN WATER CONSERVATION DIVISION.TOPSOIL TO BE AMENDED BY THE FOLLOWING METHOD: PERFORM A SOIL TEST THROUGH A QUALIFIED SOIL LAB AND AMEND THE EXISTING SOIL AS RECOMMENDED14.SEEDED GRASS AREAS ARE TO BE FINANCIALLY GUARANTEED FOR 2 YEARS BYOWNER OR CONTRACTOR AND ARE TO BE TEMPORARILY IRRIGATED FORESTABLISHMENT. SEE IRRIGATION NOTES.15.NO PLANT SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FROM THE OWNER ANDLANDSCAPE ARCHITECT.16.CONTRACTOR TO VERIFY ALL PLANT QUANTITIES. IF THERE IS A DISCREPANCYBETWEEN PLANT TABLE AND PLAN, THE PLAN SHALL DICTATE QUANTITY.17.ALL GROUND MOUNTED MECHANICAL NOT SHOWN ON PLAN SHALL BE HARDSCREENED WITH FENCE OR SIDING MATERIAL.TOTAL LANDSCAPE/HYDROZONE AREA: 10,505 SF(EXCLUDES PAVERS, WALKWAYS, GRAVEL, ETC.)CONTAINER GROWN PLANT COVERAGE: 4,360 SF (42% OF LANDSCAPE AREA)IRRIGATED LAWN: 861 SF (8% OF LANDSCAPE AREA)DRYLAWN SEED MIX: 1,082 SF (10% OF LANDSCAPE AREA)TOTAL LANDSCAPE VEGETATIVE COVER AREA: 6,303 SF (60%)THE FOLLOWING REQUIREMENTS APPLY WHEN PERFORMING A SOIL TEST:1)A soil analysis must be conducted by an independent, state-operated, oruniversity-operated soil laboratory with the capability and experience to conduct the required testing.2)The soil sample(s) must represent a uniform area. Differences in texture (sand, silt, orclay), color, slope, degree of erosion, drainage, past management practices, and types ofplant material designed for each area should be considered when collecting the sample.The recommended sampling frequency is no less than one sample per 5,000 square feetof landscaped area.3)The soil analysis must test the following:a) Soil Textureb)Percentage of Organic Matterc)Soil Reaction (acidity/alkalinity pH value)d)Soluble-Salt Contente)Nutrients: including nitrogen, phosphorus, potassium, zinc, iron, copper,manganese, and lime.4)The soil test must be dated no more than 60 days prior to conducting the pre-installation meeting and must be provided to the review authority at the pre-installation meeting.BOZEMAN U.D.C REQUIREMENTSLOCATIONCRITERIAPLANUNITTOTALREQUIREDTOTALPROVIDEDPARKINGLOTLANDSCAPING1 LARGE CANOPY TREE;OR ONE LARGENON-CANOPY TREE & 1SMALL TREE; OR 3SMALL TREES FOR EACH9 PARKING SPACES &20 SF PLANTING BED PERSTALL2 TREES & 440SF PLANTINGBEDSTREET FRONTAGE7TH AVENUE2 TREES22STALLS120LF1 TREE PER50 LF3 TREES & 591SF PLANTINGBED1 TREE DUE TOEXISTING GASLINE IN BLVD.1TREE PLACEDIN PLANTEROWNERMIDTOWN ASPEN LLC233 E. MAIN ST., SUITE 404BOZEMAN, MT 59715LOTS 4A & 6A, NORTH 7TH ADD, S01, T02 S, R05 E, BLOCK 1, LOT 4A 7 6APLAT E-21-D, BOZEMAN, MT, GALLATIN COUNTY.WATER CONSERVATION REQUIREMENTSPERFORMANCE DESIGN PATHWAYLOCATIONCRITERIAPLANUNITTOTALREQUIREDTOTALPROVIDEDHYDROZONEWATERUSEPLANTS MUST BEGROUPED TOGETHER BYSIMILAR WATER USEHYDROZONES.TOTALWATER USENOT TOEXCEED8 GAL/SFLANDSCAPEVEGETATIVECOVERAGE60% OF LANDSCAPEDAREA MUST CONTAIN ACOMBINATION OFSHRUBS, PERENNIALS,TURF, GROUND COVER10% MIN. CONTAINERGROWN PLANT COVERAGETOTALLANDSCAPEAREA 10,505SFSEE GENERAL NOTESFOR LANDSCAPE AREASSHEET L10260% (6,303) SF OFVEGETATED LANDSCAPEPROVIDED42% (4,360) SF CONTAINERGROWN PLANT COVERAGE6,303SFREQUIREDTREES1 TREE PER 1600 SF OFLANDSCAPE AREAAPPLICABLEAREA:3,847 SF2 TREES2 EXISTING TREESLARGE DECIDUOUS ANDEVERGREEN2 PROPOSEDORNAMENTAL TREES6.5 GAL/SFSEE WATERBUDGET CALCULATORTABLE SHEET L102TOTALLANDSCAPE AREA10,505 SF1,050SFNOTES& TABLESL1022/16/24 For ReviewDATE3084 Thorpe RoadBelgrade, Montana 59714406.924.8038aly@outdoordesignstudios.comISSUE4/11/24 For Review4/15/24 City SubmittalSAH 7TH & ASPEN-PHASE 1 & 2 654 & 706 N. 7Th Ave. Bozeman, MT 597156/28/24 City SubmittalWATER BUDGET TABLES FOR PERFORMANCE DESIGN PATHWAYDrawn By: ARChecked By: JD7/29/24 Revised