Loading...
HomeMy WebLinkAbout035 - A301.1 BUILDING ELEVATIONS -PHASE 1T.O. SLAB 100' -0" T.O. SUBFLOOR (L2) 110' -7 7/8" T.O. SUBFLOOR (L3) 120' -3 3/4" I K T.O. SUBFLOOR (L4) 129' -11 5/8" T.O. ROOF 138' -10 7/8" HGFEADC J T.O. RIDGE (ROOF) 153' -0"53' - 0"7' - 10"6' - 3 1/8"8' - 11 1/4"9' - 7 7/8"9' - 7 7/8"10' - 7 7/8"3:12M3 M2 M1 M6 M3M2 M2 RF 08 RF 26 M2 M1 M1 FR 11 M2M5 M4 TM 15 EQ 36 CD C CD D B B B C D C D C D C D A A A D C D C M1 M2 EQ 36 M2 RF 27 RF 27 RF 27 B D C D C C2 C C C C C C C C C D D D C C C C C C D D D D D D C3 SF 5 145' - 2" T.O. PLATE C D C D C D C C M2 M2 M1 CORRUGATED METAL SIDING / ROOFING M2 NATURAL WOOD SIDING & SOFFIT TYPE: 1" x 4" SHIPLAP SPECIES: CEDAR, STANDARD AND BETTER FINISH: STAIN -CLEAR NATURAL (TBD) M3 CEMENTITIOUS PANEL SIDING MANUFACTURER: JAMES HARDIE (OR SIM) TYPE: PANEL VERTICAL SIDING, SMOOTH FINISH: PAINTED, COLOR SW BLACK MAGIC M4 ASPHALT SHINGLE ROOFING MANF: MALARKEY ROOFING PRODUCTS TYPE: HIGHLANDER AR FINISH: MIDNIGHT BLACK M5 M6 EXTERIOR FINISH LEGEND METAL FASCIA & TRIM 22 GAUGE BRAKE METAL -SEAMLESS (MATCH TO M1) MANUFACTURER: PROTECH STEEL TYPE: 7/8" CORRUGATED; 24 GAUGE FINISH: BONDERIZED PAINTED STEEL TYPE: STRUCTURAL STEEL -PAINTED FINISH: PAINTED, SW BLACK MAGIC T.O. SLAB 100' -0" T.O. SUBFLOOR (L2) 110' -7 7/8" T.O. SUBFLOOR (L3) 120' -3 3/4" IK T.O. PLATE (L4) 138' -0 3/4" T.O. SUBFLOOR (L4) 129' -11 5/8" H G F E ADCJ T.O. RIDGE (ROOF) 153' -0"10' - 7 7/8" 9' - 7 7/8" 9' - 7 7/8" 8' - 1 1/8"4:12M6 M3 RF 26 M3 M1 M2 M2 M2 M2 M2 M2 TM 15 M4 ST 24 6' - 11 1/4" 8' - 0"53' - 0"CDCDC DC D D D DCCDCC DCCC DCCCDCCD D DCCDDDCC DCCDD SF 2 SF 1 RF 27 RF 27RF 27 RF 27 B D C C C C C C C C C C C C D 145' - 0" T.O. PLATE C C C D 1 214 E Mendenhall Street Suite 201 Bozeman, MT 59715 aspektarch.com 406.317.5333 PRELIMINARY NOT FOR CONSTRUCTION ARCHITECTURE & DESIGN SHEET PROJECT REVISIONS © 2024 ASPEKT ARCHITECTURE LLC 654 N. 7th Ave Bozeman, MT 59715 Lot 4A of the North Seventh Addition to Bozeman Subdivision Autodesk Docs://Seventh & Aspen Affordable Housing/SAH_PHASE 1.rvtA301.1 7TH & ASPEN PHASE 1 BUILDING ELEVATIONS - PHASE 1 07.01.2024 SAH 1/8" = 1'-0" A301.11SOUTH ELEVATION -PHASE 1 KEYNOTES EQ 36 PTAC GRILL FR 11 FDC HORN STROBE LOCATION; 9'-0" ABOVE GROUND; MOUNT PER NFPA AND IFC REQUIREMENTS RF 08 ROOF ACCESS HATCH. RF 26 GUTTER RF 27 DOWNSPOUT - SEE ELEVATIONS ST 24 ELECTRICAL SERVICE & METER - COORD. LOCATION W/ LOCAL UTILITY PROVIDER TM 15 METAL TRIM 1/8" = 1'-0" A301.12NORTH ELEVATION -PHASE 1 No.Description Date 1 SP REVISION 1 7.1.2024