Attendees:
Jacob Doesschate, Ben Abbey, Cody Flammond, Brian Krueger, Scott Mueller, Bailey Minnich, Nakeisha
Lyon, David Fine, Scott Freimuth, Caitlin Tamposi, Crosby Branch, Royce Rheinschild
Project Description: Mixed-use Residential Multifamily
Site: TBD 706, 726 N 7th Ave Bozeman, MT 59715
Lots 1-3 & 4A of the North Seventh
Addition to Bozeman Subdivision
General Discussion
• Please verify the proposed phased approach /entitlement process with a Master Site Plan
application for Phase 1 and 2 reviewed concurrently with a Phase 1 Site plan application
is acceptable and comment on any specific limitations. Any further direction on submittal
requirements for the Master Site Plan Application beyond what is currently published in
City forms & guides is appreciated. (Planning)
o The MSP and SP Phase 1 entitlement process is the appropriate approach for this
project.
o The MSP can meet the basic requirements of the code and checklist or provide
further details if needed regarding building elevations, landscaping, photometrics,
open space, etc. If anything is included and changed in further site plans, the MSP
must be modified.
• Please confirm the applicability and use of the affordable housing incentives proposed.
(planning, economic development)
o How does applicant memorialize affordability upfront?
▪ Affordable Housing Plan approved and recorded with/prior to MSP
approval
▪ Affordable housing incentives as proposed are acceptable and the
affordable housing plan and applicable documents must be finalized and
recorded in the MSP process due to its proposal in Phase 1 and
applicability on Phase 2.
• Please verify the vehicle circulation & parking configuration layout and advise on any
corrections or further clarification needed in subsequent applications. (Planning,
Engineering)
o Scott gives green light from fire apparatus standpoint
Page 2 of
5
o An off-site parking agreement is required for any vehicular parking spaces
provided in Phase 2 to serve Phase 1. Please ensure this meets Sec. 38.540.070.
o A pedestrian safety plan is required for all parking facilities with more than 100
parking spaces and must be reviewed and approved by the city engineer. The city
engineer may request a pedestrian safety plan for parking facilities with less than
100 parking spaces.
o Please ensure the maximum parking provisions for B-2M applicable to the
commercial spaces are provided through parking calculations as excess of the
minimum requirements is not allowed.
• Please comment on the feasibility of the proposed optional bicycle parking strategy,
(providing part of the Phase 1 required space in Phase 2) specifically if such phase 2
parking will not be complete with Phase 1. (Planning)
o Bicycle parking must be proposed to serve Phase 1 in its entirety for said Phase as
each phase must be able to function independently of each other based on the
proposed development of said phases. Temporary or permanent bicycle parking
can be provided on Phase 2 to serve Phase 1 and a temporary bicycle parking
easement and off-site parking agreement (separate from or included in the one for
vehicular parking for Phase 1 in Phase 2) would be required. If this bicycle
parking is included in the building once Phase 2 is developed, Staff would need to
ensure the appropriate pedestrian connections to facilitate access to the bike
parking area is provided and locational standards are met as denoted in the BMC.
• Please comment on the feasibility of the proposed private residential open space strategy,
(providing part of the Phase 1 required space in Phase 2) specifically if such phase 2 open
space will not be complete with Phase 1. Alternately, please comment if providing only
the portion of required Phase 1 open space is acceptable given the affordable nature of
the project and proximity to public open spaces listed above. (Planning, Economic
Development)
o There is no shallow or deep incentive for waiving 40% of open space or any
percent of open space. Sec. 38.320.070. Departures for Housing Creation includes
a 20% reduction for any new development within one-quarter mile pedestrian
travel distance of an existing park. If this is met and pursued, please submit a
departure narrative and demonstrate conformance with the denoted criteria within
this code section. An alternative is providing the balance of open space within
Phase 2 for Phase 1 which 1) there would need to be temporary open space
provided in Phase 2 for Phase 1 until Phase 2 is developed. A temporary open
space easement is required, and 2) for the permanent space in Phase 2, staff would
need to provide the design, details, and functionality of this option for review with
our Community Development Director and Legal Department. There is not
Page 3 of
5
ultimate waiver, departure, deviation, or variance for this provision. Based on the
growth policy, B-2M form and intensity standards, and the Midtown TIF District,
amenities such as open space are more valuable to the livability and usability of
residents of this development than parking which is not required for this location.
• Please comment on the current configuration of proposed open space areas (ground level
park, plaza). (Planning, Economic Development)
o The proposed open space cannot include parking lot landscaping. Required
setback areas do not count as shared open space unless the design of the space
meets the standards in Sec. 38.520.060.B.2.. Shared open space must be separated
from ground level windows, streets, service areas and parking lots via
landscaping, fencing, and/or other acceptable treatments that enhance safety and
privacy for both the shared open space and dwelling units. These areas are shared
open spaces not private residential outdoor space or parks. The lobby can count
towards the common indoor recreation area.
• Please comment Departures & Deviations Requested (Phase 1 Only)
o 1. A departure is not needed for this standard. The storefront standards can be met
along this frontage with the mixed block frontage modifications. The floor to
floor height for ground floor is only applicable to non-residential development.
The sidewalk is required to be a minimum of 12 feet between curb edge and
storefront (area includes clear/buffer zone with street trees). Required setback
areas do not count as shared open space unless the design of the space meets the
standards in Sec. 38.520.060.B.2.. A departure will be required for the sidewalk
width along the northern portion of 7th for Phase 1. Please see Sec.
38.510.030.B.3.e.. This must be demonstrate in the MSP and Phase 1 entitlement
process.
o 2. A departure from BMC 38.510.030.J will be supported if the criteria is met
within this section for a departure is met. Staff finds the proposed landscaping and
fencing provides privacy and mitigates vehicular headlight glares into the ground
floor units. Please ensure the final design and narrative is provided for review
during the formal submittal for the Phase 1 entitlement process.
o 3. A departure would not be supported by Staff for the light and air access
increased setback as B-2M allows for a 5’ side setback which is not guaranteed to
be maintained in Phase 2. A 10’ no build easement along the 5’ setback would
ensure this space is maintained to meet this provision for Phase 1. This must be
provided and recorded against the property during the MSP entitlement process.
o 4. Based on the design presented, a departure from Sec. 38.530.040.C. for the
façade articulation for residential buildings would be supported. Please ensure the
Page 4 of
5
final design and narrative is provided for review during the formal submittal for
the Phase 1 entitlement process.t on the requested departures.
• Please confirm yard setbacks and considerations for rear vs. side yards for the corner
parcel
o Side setback is to the south, and back setback is to the east (Phase 2)
• Please comment on any off-site infrastructure requirements for this project: specifically
water and sewer serving this development. (Engineering, Public Works)
o 8in clay sewer pipe in alley to the east
▪ Likely okay for capacity and it is in decent condition
• As long as sewer demand estimates match up and don’t go over
capacity anywhere
o Water line
▪ 4in out in 7th that will need analysis, may require upgrade
o Water service off of Aspen?
▪ Potential for water main extension off of aspen and sending it south off
east side of building
▪ Could serve both buildings
▪ Water main extension off of Aspen would need to be looped
• MDT
o Any work in right of way will require encroachment permit from MDT
o The earlier the better when it comes to reaching out to MDT
o Since trips are increasing, they may want to see the TIS so they can do a systems
impact analysis
• Peak trip/hour for TIS waiver
o Taylor Lonsdale is the decision maker
Page 5 of
5
Please note: Comments are preliminary and based on the information provided. City staff cannot
identify all possible issues during a pre-application meeting. We try to identify critical path issues at
this time. You are required to design the project to meet the requirements of the Bozeman Municipal