The 7th &Aspen Master Plan proposes new mixed-use development of commercial & residential uses on three
parcels located at the Southwest corner of 7th Avenue and Aspen Street in the Midtown District, and includes 96
units of affordable housing. Phase 1 &2 occupy the southern two lots of the development and each contains a
4-story apartment building which provides a total of 96 units, 100%of which are affordable housing units.
46 units will be offered at or below 70%AMI thresholds,with the remaining 50 offered at 80%AMI thresholds.All
units will meet the city's affordable eligibility guidelines.All units offered will be contractually obligated, by way
of a written plan,to assure ongoing affordability to the affordable housing agency for a period of not less than 30
years.
PLJrtw+t
� t
W8ETWW -A
T3L
IMP
F� _ .//Z1 L M r/O■f ��1��
PROJECT i r'i'�.. i 3
LDCJQION � .
o...�..� .o.i CO
I" ,
all,' i
IT
1r1 �.— *` — oft
. *4
is
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 1
AFFORDABLE HOUSING SUMMARY
Both Phase 1 and 2 will provide a total of 96 units for rent, 100% of which will be affordable dwellings meeting the
criteria of BMC 38.380.020. Phase 1 will provide 29 units with rental rates at 60%of AMI thresholds and 17 units at
50%of AMI thresholds. Phase 2 provides 50 affordable dwelling units for rent at 80%of AMI thresholds.
Phase 3 is anticipated to contain approximately 75 market-rate units:therefore, this development seeks to take
advantage of the deep incentives set forth in BMC 38.380.030.C.3 as affordable units will make up approximately
56%of total dwellings in the entire development.
TYPE OF HOUSING (OWNERSHIP)-PERCENTAGE OF AMI UNIT OTY. %OF HOMES DURATION
Multi-Household Dwellings (Rental)-50%of AMI (PHASE 1) 17 10% 30 YEARS
Multi-Household Dwellings (Rental)-60%of AMI (PHASE 1) 29 17% 30 YEARS
Multi-Household Dwellings (Rental)-80%of AMI (PHASE 2) 50 29% 30 YEARS
AFFORDABLE DWELLINGS TOTAL 56%
Multi-Household Market Rate Dwellings (PHASE 3) 75 (EST.) 44% N/A
TOTAL 171 (EST.) 100%
Specifically,this application seeks to utilize the following incentives:
- Additional Stories of height(38.380.020-1.3.c) (Phase 1 &2, TBD- Phase 3)
- Exemption from the following (38.380.020-1.3.f.(2-4):
-(2) Special residential block frontage standards along internal pathways(38.510.030.J)
-(3) Maximum fagade width standards (38.530.040.E)
-(4) Roofline Modulation ((38.530.040.F)
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 2
AFFORDABLE UNIT MATRIX
UNITS AT 50% AMI % OF HOMES UNIT QTY. UNIT SIZE (SF) RENT (MONTHLY) PHASE
Studio 0% 0 518 - -
One Bedroom 5.85% 10 528 $ 986 Phase 1
Two Bedroom 2.3% 4 768 $ 1,183 Phase 1
Three Bedroom 1.75% 3 1,104 $ 1,368 Phase 1
Total 9.9% 17 Phase 1
UNITS AT 60% AMI
Studio 2.3% 4 518 $ 1,105 Phase 1
1 Bedroom 8.2% 14 528 $ 1,184 Phase 1
2 Bedroom 4.1% 7 768 $ 1,420 Phase 1
3 Bedroom 2.3% 4 1,104 $ 1,641 Phase 1
Total 16.9% 29
UNITS AT 80% AMI
Studio 0% 0 518 - -
One Bedroom 21% 36 528 $ 1,684 Phase 2
Two Bedroom 6.43% 11 768 $1,893 Phase 2
Three Bedroom 1.75% 3 1,104 $2,103 Phase 2
Total 29.18% 50
TOTAL 55.98% 96
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 3
FLOOR PLANS (PHASE 1)
All affordable units are located in phase 1 &2 buildings. The Phase 1 building contains 46 total dwelling units
comprised of:4 studio units; 24 one-bedroom units; 11 two-bedroom units; and 7 three-bedroom units.All 46 units
are affordable
------ ------------ ------ ------ T ------------ ---------
o
----------STORAGE--I -.TTT. ........
................
L I_1
NIT 108 UNIT 112 UNIT 104 UNIT 108
REC ROOM MECH.I
S ORAGEESTROOM
Fr MAIL
El F
J.C.
CORD LAUNDRY
-110 LT
ENTRY
LOUNGE ENTRYIR2/
STAIR 1 UNIT 111
UNIT 103 UNIT 105 UNIT 107 UNIT1W
FL.. EM FIRE RISMER --- ---
RCO
L -------
------- -----
LL
rIT
L
IUUNIT 204 U" U"ITS
7 71
----- ----------- f ---------
CORRIDOR 2 LAUNDRY 2
STAIR 2
F_=
STAIRJ UNIT�03 UNIT205 UNIT209
Unfli
Phase I Floor Plans.-Above-Level I Plan;Below-Levels 2-4 Plan
AS P E KT Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 4
FLOOR PLANS (PHASE 2)
All affordable units are located in phase 1 &2 buildings. The Phase 2 building contains 50 total dwelling
units comprised of: 36 one-bedroom units; 11 two-bedroom units; and 3 three-bedroom units.All 50 units are
affordable.
ir
---
IILI
®0® L 0
o - -
® d
0 0"
'o y,_yy___y__111
Irr, 'TTTTTTTTTTTTTTTT
- - - - - - - - - - - - -
r—� l
o
ED
o -FI
]OUD
Phase 2 Floor Plans:Above-Level 1 Plan;Below-Levels 2-4 Plan
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 5
UNIT PLANS
STUDIO
TYPICAL UNIT PLAN STORAGE
TI
510 SF ° III BATH
LJJKITCHEN/
DINING
CLOSET
LIVING --- BEDROOM -
ONE BEDROOM
TYPICAL UNIT PLAN
aEDRooM
530 SF NG
L-H
4 KITCHEN
DINING
TWO BEDROOM
TYPICAL UNIT PLAN
6EJROOM LIVINGI
775 SF
eEDCOOm
CLOSET.... CI OSFT
0 KITCHEN/
y
BATH DINING
n WH -----
_-----
_
`i O O�
THREE BEDROOM -
TYPICAL UNIT PLAN
BEDROOM BEDROOM
LIVING 2 �
1,010 SF
eaDRooN,
a
LD
wET cLOSET
CLOSET
�ST07- 1 - BATH
LS1 L I\ I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 6
PHASING
The Master Site Plan development consists of three phases each containing a single building on each respective
parcel.
Phase 1 of development consists of a single four-story apartment building containing 46 affordable rental
dwellings on the center parcel (lot 4A); as well as site improvements including the shared surface parking, refuse
enclosure, Phase 1 plaza area, and East open space area.
46 DWELLING UNITS
REFUSE ENCLOSURE
23 SURFACE PARKING SPACES
5 OPEN SPACE&SITE IMPROVEMENTS
Phase >scope limit diagram
Phase 2 consists of a single four-story apartment building containing 50 affordable rental dwellings on the South
parcel (lot 6A).; as well as site improvements including the Phase 2 plaza area and South open space area.
50 DWELLING UNITS
OPEN SPACE&SITE IMPROVEMENTS
5Q
\
Phase 2 scope limit diagram
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 7
PHASING
Phase 3 is a future phase and it's build-out is TBD at this time, however it is anticipated that phase 3 will consist
of a single seven-story mixed-use building containing above and below ground structured parking, commercial
space, residential dwelling units, and site improvements located on the Northern parcel (lots 1-3).The applicant is
currently exploring the feasibility of an interim condition to provide surface parking on the North parcel (lots 1-3).
Phase 3 interim scope diagram \ c�
PHASE 3 TBD
TBD 7-STORY MIXED-USE
APPROX.75 DWELLING UNITS
APPROX.15,000 SF OF COMMERCIAL SPACE
140A50 PARKING GARAGE SPACES
/ OPEN SPACE&SITE IMPROVEMENTS
� II IIIIII' D
\\ I o
Phase 3 scope diagram
A P L K I . Boundary 7TH&ASPEN Phase 1 &2 Site Plan Application 8