Loading...
HomeMy WebLinkAbout036 - A301.2 BUILDING ELEVATIONS -PHASE 2M1 CORRUGATED METAL SIDING M2 M3 CEMENTITIOUS PANEL SIDING MANUFACTURER: JAMES HARDIE (OR SIM) TYPE: PANEL VERTICAL SIDING, SMOOTH FINISH: PAINTED, COLOR SW BLACK MAGIC M4 ASPHALT SHINGLE ROOFING MANUFACTURER: MALARKEY ROOFING PRODUCTS TYPE: HIGHLANDER AR FINISH: MIDNIGHT BLACK M5 M6 EXTERIOR FINISH LEGEND METAL FASCIA & TRIM 22 GAUGE BRAKE METAL -SEAMLESS (MATCH TO M1) MANUFACTURER: PROTECH STEEL TYPE: 7/8" CORRUGATED; 24 GAUGE FINISH: PRE-FINSIHED, COLOR VINTAGE PAINTED STEEL TYPE: STRUCTURAL STEEL -PAINTED FINISH: PAINTED, SW BLACK MAGIC NATURAL WOOD SIDING & SOFFIT TYPE: 1" x 4" SHIPLAP SPECIES: CEDAR, STANDARD AND BETTER FINISH: STAIN -CLEAR NATURAL (TBD) T.O. SLAB 100' -0" T.O. SUBFLOOR (L2) 110' -6" T.O. SUBFLOOR (L3) 120' -0" IK T.O. SUBFLOOR (L4) 129' -6" T.O. ROOF 139' -0" H G F D ACBJ T.O. RIDGE (ROOF) 153' -0"53' - 0"10' - 6" 9' - 6" 9' - 6" 9' - 6" 14' - 0" M3 M2M2 M2 M2 M2 M3 M2 M1 M6 3:12RF 26 RF 08 TM 15 M4 M5M5 FR 11 E T.O. SLAB 100' -0" T.O. SUBFLOOR (L2) 110' -6" T.O. SUBFLOOR (L3) 120' -0" I K T.O. SUBFLOOR (L4) 129' -6" T.O. ROOF 139' -0" HGFDACB J T.O. RIDGE (ROOF) 153' -0"53' - 0"14' - 0"9' - 6"9' - 6"9' - 6"10' - 6"M3 M2 M2 M3 M2M1 M2 M4 TM 15 RF 26 M6 4:12E 214 E Mendenhall Street Suite 201 Bozeman, MT 59715 aspektarch.com 406.317.5333 ARCHITECTURE & DESIGN SHEE T PROJEC T REVISION S DRAWINGS FOR PLANNING REVIEW ONLY © 2024 ASPEKT ARCHITECTURE LLCAutodesk Docs://Seventh & Aspen Affordable Housing/SAH_PHASE 2.rvtA301.2 7TH & ASPEN PHASE 1 BUILDING ELEVATIONS - PHASE 2 654, 706 & 726 N. 7th Ave Bozeman, MT 59715 Lots 1-3, 4A & 6A of the North Seventh Addition to Bozeman Subdivision 07.01.2024 SAH KEYNOTES FR 11 FDC HORN STROBE LOCATION; 9'-0" ABOVE GROUND; MOUNT PER NFPA AND IFC REQUIREMENTS RF 08 ROOF ACCESS HATCH. RF 26 GUTTER TM 15 METAL TRIM 1/8" = 1'-0" A301.21NORTH ELEVATION -PHASE 2 1/8" = 1'-0" A301.22SOUTH ELEVATION -PHASE 2 No.Description Date 1 SP REVISION 1 7.1.2024