Loading...
HomeMy WebLinkAbout002 - A010 MASTER PHASING DIAGRAMX XX X X X NG NGNG OHP OHPOHP W WW SS SS WFS WFSWFS BP BPBP SD SD C CC C C FO FOFO LINE TYPE LEGEND PROPERTY LINE SETBACK EASEMENT OPEN SPACE BOUNDARY DEMOLISHED PHASING BOUNDARY FENCE COMMUNICATIONS OVERHEAD ELECTRIC LINE BURIED ELECTRIC LINE NATURAL GAS LINE WATER LINE FIRE SERVICE LINE SANITARY SEWER LINE STORMWATER FIBER OPTIC 1. THIS SITE PLAN APPLICATION CONTAINS TWO PHASES (PHASE 1 & 2) WITHIN THE "7TH & ASPEN MIXED-USE" DEVELOPMENT MASTER SITE PLAN; WHICH IS SUBMITTED UNDER A SEPARATE APPLICATION 2. ALL NOTES CODE REQUIRMENTS REFERENCE THE BOZEMAN MUNICIPAL CODE (BMC) 3. REFER TO CIVIL DRAWINGS FOR SITE GRADING, UTILITY, STORMWATER, AND SITE ENGINEERING DETAILS 4. REFER TO LANDSCAPE DRAWINGS FOR LANDSCAPE AND PLANTING DETAILS AND LOCATIONS 5. "TYPICAL" OR "TYP." MEANS IDENTICAL FOR ALL SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE PHASING PLAN NOTES SURFACE PARKING (22 SPACES)N. 7TH AVEW. ASPEN ST EXISTING ADJACENT BUILDING EXISTING ADJACENTBUILDING EXISTING PARKING / DRIVE EXISTING PARKING / DRIVE EXISTING PARKING / DRIVE100' -0" R.O.W.DESIGNATED BLOCK FRONTAGE: MIXED50' -0" R.O.W. DESIGNATED BLOCK FRONTAGE: STOREFRONT EXISTING PARKING / DRIVE A101 1 Sim FUTURE BUILDING (TBD) -PHASE 3 APPROX. 15,000 SF OF COMMERCIAL SPACE APPROX. 340 -360 PARKING GARAGE SPACES (TBD 7-STORY MIXED-USE, APPROX. 75 DWELLING UNITS) SEE SEPARATE APPLICATION PROPOSED BUILDING -PHASE 2 LEVEL 1 FOOTPRINT: 9,102 SF TOTAL SQUARE FOOTAGE: 37,716 SF (4 STORY, 50 DWELLING UNITS) 22,369 SF (0.515 ACRES) LOT 6A -PHASE 2 PROPOSED BUILDING -PHASE 1 LEVEL 1 FOOTPRINT: 9,102 SF TOTAL SQUARE FOOTAGE: 37,716 SF (4 STORY, 46 DWELLING UNITS) 22,438 SF (0.515 ACRES) LOT 4A -PHASE 1 35,211 SF (0.808 ACRES) LOTS 1-3 1 214 E Mendenhall Street Suite 201 Bozeman, MT 59715 aspektarch.com 406.317.5333 PRELIMINARY NOT FOR CONSTRUCTION ARCHITECTURE & DESIGN SHEET PROJECT REVISIONS © 2024 ASPEKT ARCHITECTURE LLC 654 N. 7th Ave Bozeman, MT 59715 Lot 4A of the North Seventh Addition to Bozeman Subdivision Autodesk Docs://Seventh & Aspen Affordable Housing/SAH_PHASE 1.rvtA010 7TH & ASPEN PHASE 1 MASTER PHASING DIAGRAM 07.01.2024 SAH N 1" = 30'-0" A0101 PHASING DIAGRAM No.Description Date 1 MSP REVISION 1 7.1.2024