Loading...
HomeMy WebLinkAbout001 - A0SP COVER SHEET -SITE PLANOwner Midtown Aspen LLC 233 E. Main St. Suite 404 Bozeman, MT 59715 Architect ASPEKT Architecture, LLC. 214 E. Mendenhall St. Suite 201 Bozeman Montana, 59715 406.317.5333 aspektarch.com Civil Engineer TD & H Engineering 234 E Babcock St, Suite 3 Bozeman, Montana 59715 tdhengineering.com PROJECT DIRECTORY: Landscape Architect Outdoor Design Solutions 3084 Thorpe Rd. Belgrade, MT 59714 406.924.8038 outdoordesignstudios.com LEGAL DESCRIPTION: Lots 4A & 6A NORTH 7TH ADD S01, T02 S, R05 E, BLOCK 1, Lot 4A & Lot 6A PLAT E-21-D Bozeman, Montana ZONING DESIGNATION:B-2M COMMUNITY PLAN DESIGNATION:Community Commercial Mixed Use BLOCK FRONTAGE DESIGNATION:Mixed BLOCK FRONTAGE ELECTION:Storefront SITE AREA: -TOTAL BUILDING FOOTPRINT AREA (PHASE 1): -TOTAL BUILDING FOOTPRINT AREA (PHASE 2): -TOTAL DRIVEWAY & CIRCULATION AREA: -TOTAL SEMI-PUBLIC LAND AREA: -TOTAL PUBLIC STREET R.O.W. AREA: PARKLAND REQUIREMENTS: NET RESIDENTIAL DENSITY: 93.2 DU PER ACRE (96 DU/1.03 ACRES) MAX. REQ'D @ 12 DU/ACRE: 12.36 DU (12 DU/ACRE x 1.03 ACRES) EQUIVALENT PARK LAND REQ'D: 0.38 ACRES (12.36 DU x 0.03 ACRES) CASH IN LIEU OF PARKLAND EQUIVALENT:$43,864.92 (0.38 ACRES x 43,560 SF x $2.65) RESIDENTIAL PRIVATE OPEN SPACE REQUIRED (PHASE 1): (4) STUDIO DWELLING UNITS x 100 SF = (24) 1-BEDROOM DWELLING UNITS x 100 SF = (11) 2-BEDROOM DWELLING UNITS x 150 SF = (7) 3-BEDROOM DWELLING UNITS x 150 SF = TOTAL OPEN SPACE REQUIRED (PHASE 1) = WITH 20% REDUCTION (PER BMC 38.320.070) RESIDENTIAL PRIVATE OPEN SPACE REQUIRED (PHASE 2): (4) STUDIO DWELLING UNITS x 100 SF = (32) 1-BEDROOM DWELLING UNITS x 100 SF = (11) 2-BEDROOM DWELLING UNITS x 150 SF = (3) 3-BEDROOM DWELLING UNITS x 150 SF = TOTAL OPEN SPACE REQUIRED (PHASE 2) = WITH 20% REDUCTION (PER BMC 38.320.070) PER BMC 38.320.070: 20% reduction for any new development within one- quarter mile pedestrian travel distance of an existing park. TOAL OPEN SPACE PROVIDED (PHASE 1) = -ENTRY LOUNGE (PHASE 1) -REC ROOM (PHASE 1) -PLAZA (PHASE 1) -GRILL / PICNIC AREA (PHASE 1) TOAL OPEN SPACE PROVIDED (PHASE 2) = -ENTRY LOUNGE (PHASE 2) -REC ROOM (PHASE 2) -PLAZA (PHASE 2) -BOCCE COURT / YARD GAMES (PHASE 2) PARKING SPACES REQUIRED: NO PARKING REQUIRED (PER MUR dPLAN, ORIDINANCE 1925) PARKING SPACES PROVIDED: 29 SPACES SURFACE PARKING: 23 SPACES ON-STREET PARKING: 6 SPACES BICYCLE PARKING REQUIRED: RESIDENTIAL: (1.00 SPACE x 96 DWELLING UNITS) = 96 SPACES TOTAL BICYCLE PARKING PROVIDED: 108 SPACES INDOOR BICYCLE PARKING PROVIDED: 100 SPACES OUTDOOR BICYCLE PARKING PROVIDED: 8 SPACES 44,906 SF (1.03 ACRES) 9,102 SF (20% OF SITE) 9,102 SF (20% OF SITE) 8,416 SF (19% OF SITE) 18,286 SF (41% OF SITE) 0 SF (0% OF SITE) 400 SF 2,400 SF 1,650 SF 1,050 SF 5,500 SF 4,400 SF 400 SF 3,200 SF 1,650 SF 450 SF 5,700 SF 4,560 SF 4,456 SF 233 SF 278 SF 896 SF 3,049 SF 5,572 SF 233 SF 278 SF 893 SF 4,168 SF PROJECT INFO:SHEET INDEX 1. THIS SITE PLAN APPLICATION CONTAINS TWO PHASES (PHASE 1 & PHASE 2) WITHIN THE "7TH & ASPEN MIXED-USE" DEVELOPMENT MASTER SITE PLAN; WHICH IS SUBMITTED UNDER A SEPARATE APPLICIATION (PLNAPP-6204). 2. THIS DRAWING SET HAS BEEN PREPARED FOR CITY OF BOZEMAN MUNICIPAL REVIEW SUBJECT TO THE STANDARDS OF THE BOZEMAN MUNICIPAL CODE (BMC). 3. ALL NOTED CODE REQUIREMENTS REFERENCE THE BOZEMAN MUNICIPAL CODE (BMC). 4. THE APPLICANT ACKNOWLEDGES AND CERTIFIES THAT THIS PROJECT WILL COMPLY WITH STATE AND LOCAL ACCESSIBILITY REQUIRMENTS. GENERAL NOTES: REVISION CLOUD AND NUMBER BUILDING LEVEL EXTERIOR ELEVATION DETAIL CALLOUT BUILDING CROSS-SECTION F.F.E. 100'-0" MATERIAL TAG DRAWING TITLE SCALE:SHT.# DRW.# 01 A101 / / SIM 1 // A101SIM1 // A101A101 1 SIM M1 N ANNOTATIONS / ABV. DRAWING TITLE AND SCALE / NORTH ARROW KEYNOTE TAG NORTH ARROW ?X 214 E Mendenhall Street Suite 201 Bozeman, MT 59715 aspektarch.com 406.317.5333 PRELIMINARY NOT FOR CONSTRUCTION ARCHITECTURE & DESIGN SHEET PROJECT REVISIONS © 2024 ASPEKT ARCHITECTURE LLC 654 N. 7th Ave Bozeman, MT 59715 Lot 4A of the North Seventh Addition to Bozeman Subdivision Autodesk Docs://Seventh & Aspen Affordable Housing/SAH_PHASE 1.rvtA0SP 7TH & ASPEN PHASE 1 COVER SHEET -SITE PLAN 07.01.2024 SAH ARCHITECTURAL A0SP COVER SHEET - SITE PLAN 07.01.2024 A002 AREA PLANS 04.16.2024 July 1, 2024 ISSUED FOR: SITE PLAN RESUBMITTAL 1 TBD 654 & 706 N. 7th Ave Bozeman, MT 59715 7TH & ASPEN MIXED USE -PHASE 1 & 2 SITE PLAN CIVIL C1.0 COVER SHEET 04.16.2024 C1.1 NOTES, ABBREVIATIONS & LEGEND 04.16.2024 C2.1 EXISTING 04.16.2024 C2.2 DEMO PLAN PHASE 1&2 04.16.2024 C2.3 DEMO PLAN PHASE 3 04.16.2024 C2.4 CONSTRUCTION MANAGEMENT PLAN 04.16.2024 C3.1 SITE UTILITY PLAN 07.01.2024 C4.1 GRADING & DRAINAGE PLAN 07.01.2024 C5.1 DETAILS 04.16.2024 C5.2 DETAILS 04.16.2024 C5.3 DETAILS 04.16.2024 C5.4 DETAILS 04.16.2024 LANDSCAPE L101 OVERALL LANDSCAPE PLAN 07.01.2024 L102 NOTES & TABLES 07.01.2024 L103 PHASE 2 LANDSCAPE PLAN 07.01.2024 L104 PHASE 2 LANDSCAPE PLAN 07.01.2024 L201 LANDSCAPE DETAILS 07.01.2024 L301 OVERALL IRRIGATION PLAN 07.01.2024 L302 PHASE 1 IRRIGATION PLAN 07.01.2024 L303 PHASE 2 IRRIGATION PLAN 07.01.2024 L304 IRRIGATION DETAILS 07.01.2024 VICINITY MAP ELECTRICAL E003 SITE LIGHTING & PHOTOMETRIC PLAN 07.01.2024 PLNAPP -6207 ARCHITECTURAL A010 MASTER PHASING DIAGRAM 07.01.2024 A012 MASTER SITE PLAN 07.01.2024 A100 EXISTING / DEMO SITE PLAN 04.16.2024 A101 ENLARGED SITE PLAN - PHASE 1 & 2 07.01.2024 A111 SITE DETAILS 04.16.2024 A112 SITE DETAILS 07.01.2024 A201.1 LEVEL 1 FLOOR PLAN - PHASE 1 07.01.2024 A201.2 LEVEL 1 FLOOR PLAN - PHASE 2 07.01.2024 A202.1 LEVEL 2 FLOOR PLAN - PHASE 1 04.16.2024 A202.2 LEVEL 2 FLOOR PLAN - PHASE 2 04.16.2024 A203.1 LEVEL 3 FLOOR PLAN - PHASE 1 04.16.2024 A203.2 LEVEL 3 FLOOR PLAN - PHASE 2 04.16.2024 A204.1 LEVEL 4 FLOOR PLAN - PHASE 1 04.16.2024 A204.2 LEVEL 4 FLOOR PLAN - PHASE 2 04.16.2024 A205.1 ROOF PLAN - PHASE 1 04.16.2024 A205.2 ROOF PLAN - PHASE 2 04.16.2024 A210 UNIT PLANS 04.16.2024 A211 UNIT PLANS 04.16.2024 A212 UNIT PLANS 04.16.2024 A213 UNIT PLANS 04.16.2024 A301.1 BUILDING ELEVATIONS - PHASE 1 07.01.2024 A301.2 BUILDING ELEVATIONS - PHASE 2 07.01.2024 A302.1 BUILDING ELEVATIONS - PHASE 1 07.01.2024 A302.2 BUILDING ELEVATIONS - PHASE 2 07.01.2024 A350 EXTERIOR MATERIALS 04.16.2024 A351 PERSPECTIVE IMAGES 04.16.2024 A352 PERSPECTIVE IMAGES 04.16.2024 No.Description Date 1 SP REVISION 1 7.1.2024 1 1