Loading...
HomeMy WebLinkAbout004 C200 EROSION CONTROL PLANS SP N89°30'03"E 145.78' S67°07' 2 5 " W 1 7 4 . 7 1 ' 158.51'S0°59'08"W 104.41'N89°57'07"W 149.49'S0°00'00"W 228.59'S89°57'07"E12.00'S0°00'00"E 174.80'16.20'S0°59'08"W 45.90'SF 20 4010200 SCALE IN FEET 4 C603 Know what's below. before you dig.Call R Know what's below. before you dig.Call R EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. NOTES BY SYMBOL: INSTALL TYPE D INLET PROTECTION FILTER PER DETAIL 3 ON SHEET C603 PRIOR TO THE DISTURBANCE OF ANY PORTION OF THE SITE. 3 INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 1 ON SHEET C603 OR AS RECOMMENDED BY MANUFACTURER 1 INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 2 ON SHEET C6032 LEGEND PROPOSED CONCRETE SURFACE CONSTRUCTION LIMITS STRAW WATTLE AREA TO BE PAVED 1 2 CONSTRUCTION LIMITS PROPOSED STRAW WATTLE REFER TO DETAIL 4/C603 3 WEST OAK STREET 3 3 PROPOSED STRAW WATTLE REFER TO DETAIL 4/C603 CHIPOTLE BUILDING LOT 11 TEMPORARY JOB SITE DUMPSTER TEMPORARY JOB SITE TRAILER TEMPORARY SANITARY FACILITY VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2024COPYRIGHT © MORRISON-MAIERLE, SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\5659\022 - NWX LOT 11 SITE PLAN\ACAD\SHEETS\C200 EROSION CONTROL PLAN.DWGREVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle PLOTTED BY:CELINE SAUCIER ON Jul/10/2024 NWX CHIPOTLE 1438 DAYSPRING AVENUE, BOZEMAN MT 59718 BOZEMAN MONTANA EROSION CONTROL PLAN 5659.022 4 C200 CGD CMS MEE 5/31/2024 No. 49499 CELINE M PR O FESSIONAL E N G INEERM O N TANA LICENSE D SAUCIER THIS SITE HAS BEEN DESIGNED TO BE ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT.