HomeMy WebLinkAbout605 E Bryant - STORM DRAINAGE REPORTRanieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 1 Table of Contents 1 Project Overview and Background ......................................................................................... 2 2 Hydrology ............................................................................................................................... 2 2.1 Pre-Development .............................................................................................................. 2 2.2 Post Development ............................................................................................................ 3 3 Post Development Hydraulics................................................................................................. 3 3.1 Inlet and Gutter Capacity ................................................................................................. 3 3.2 Drainage Swale ................................................................................................................ 4 3.3 Ponds ................................................................................................................................ 4 4 Maintenance Plan .................................................................................................................... 6 Table 1 - Pre-Development Hydrology........................................................................................... 3 Table 2 - Post Development Hydrology ......................................................................................... 3 Table 3 - Inlet and Gutter Summary (25-year event) ...................................................................... 4 Table 4 – Retention Pond Sizing .................................................................................................... 4 Table 5 – Pond Stage-Storage ......................................................................................................... 5 Attachments: Exhibit 1.1 – Vicinity Map - Topo Exhibit 1.2 – Aerial Map Exhibit 2.1 – Pre-Development Hydrology Exhibit 2.2 – Post Development Hydrology Appendix A – Supporting Calculations Appendix B – Storm Drainage Plans Ranieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 2 1 Project Overview and Background The subject property is located at 605 E Bryant Street in Bozeman, Montana. Vicinity maps showing the project location are provided with Exhibits 1.1 and 1.2. The proposed site improvements will involve construction of two adjoining shop units with garages, each with 1 ADU living space above. A new parking lot is included as part of the improvements. An existing single-family residence is located on the property and will remain in its current condition. A new retention pond will be provided east of the existing house to meet water quality and peak runoff rate requirements. The following sections describe the proposed stormwater design and its compliance with the current City of Bozeman (COB) storm drainage standards. Current regulations dictate that peak runoff rates for the post-development condition are mitigated to pre-development for the 10-year event. Stormwater collection and conveyance infrastructure is sized for the 25-year event. 2 Hydrology The rational method was utilized to estimate peak runoff rates for conveyance sizing as outlined by the City of Bozeman Design Standards and Specifications. A weighted runoff coefficient “C” was determined based on a combination of open space (C=0.2) and impervious surfaces (C=0.95). The time to concentration was estimated using the overland flow method from the City of Bozeman Design Standards and TR-55 for shallow concentrated flow. A more detailed breakout of the basin data is provided in Appendix A. Basins, flow paths, and the general site layout for the pre- and post-development conditions can be found on Exhibits 2.1 and 2.2, respectively. 2.1 Pre-Development A single basin (Basin Pre-A) was assumed for the site with consistent basin boundaries between the pre- and post-development site conditions for the purpose of pond sizing. The site currently consists of a single-family dwelling, gravel parking area, and open space. A significant portion of the runoff is generated from the neighboring property to the west. Runoff from the neighboring property is currently routed to the project site via an existing concrete valley gutter. Run-on from the neighboring property is routed through the project site. There were no existing stormwater facilities observed on the adjacent property. All on-site areas within Basin Pre-A were conservatively assumed to be entirely open space prior to the proposed development. Existing paved/impervious areas within the offsite area of Basin Pre-A (i.e., neighboring property to the west) are included in the pre-development hydrology calculations. Bozeman Creek runs along the eastern property line. Stormwater runoff generally flows east and outfalls to Bozeman Creek. A summary of the pre-development hydrologic conditions is provided in Table 1; more detailed information providing a time to concentration breakout and intensity is provided in Appendix A. An overview of the pre-development drainage is provided on Exhibit 2.1. It should be noted that the stormwater facility sizing conservatively accounts for the adjacent property along with the project site. Ranieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 3 Table 1 - Pre-Development Hydrology Basin Total Area (ac) Impervious* (sf) Open Space (sf) Weighted C Tc (min) 10-yr Peak Runoff (cfs) 25-yr Peak Runoff (cfs) Pre-A 0.75 9,035 23,835 0.41 12 0.56 0.67 *Impervious area only considers offsite areas. The subject property was conservatively assumed to be entirely open space prior to the proposed development. 2.2 Post Development Input parameters and results for the post development drainage basin are summarized in Table 2. An overview plan showing the drainage area and infrastructure is provided on Exhibit 2.2. Basin Post-A encompasses the existing and proposed site improvements, including the proposed shop/ADU units, proposed parking lot, and existing house. Offsite drainage from the west is included in the drainage area, which consists of a portion of an existing parking lot & building. Basin Post-A will be routed to a proposed retention pond located east of the existing house. Table 2 - Post Development Hydrology Basin Total Area (ac) Impervious (sf) Open Space (sf) Weighted C Tc (min) 10-yr Peak Runoff (cfs) 25-yr Peak Runoff (cfs) Post-A 0.75 18,315 14,555 0.62 6 1.33 1.59 3 Post Development Hydraulics The post development collection and conveyance infrastructure considers the 25-year design event as outlined in the City of Bozeman Design Standards. Capacity calculations for the proposed storm drainage infrastructure are provided in Appendix A. 3.1 Inlet and Gutter Capacity The maximum allowable water surface for the 25-year event is 0.15-ft below the top back of curb resulting in an allowable depth of 0.3-feet at the flow line. Based on the proposed parking lot cross slope of 1.5%; the maximum allowable spread width is then approximately 16.25-ft. The gutter flow capacity is based on the HEC-22 gutter flow methodology for a composite section. Street/gutter capacity is 12.17-cfs for a cross slope of 1.5% and a longitudinal grade of 3.1%. The calculated peak flow rate is about 2-cfs and is less than the street/gutter capacity. A 4-ft wide sidewalk chase will be used to convey runoff from Basin Post-A to a proposed drainage swale, which will then outfall to the proposed retention pond. The sidewalk chase was modeled as a 4-ft wide weir; the calculated flow depth was 0.24-ft. Sample calculations are provided in Appendix A. A summary of inlet and gutter flow is provided in Table 3. The proposed sidewalk chase is located at a sag in the curb line. Ranieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 4 Table 3 - Inlet and Gutter Summary (25-year event) Inlet Cross Slope (%) Calc. Peak Flow (cfs) TBC (ft) TBC-0.15 (ft) Calculated WSE (ft) Spread (ft) Sidewalk Chase 1.5 1.59 4731.93 4731.78 4731.72 7.70 3.2 Drainage Swale As mentioned previously, a drainage swale will be used to convey runoff from the sidewalk chase to the retention pond. The proposed swale is approximately 40-ft long, 4-ft wide (top width), and 0.5-ft deep. Autodesk Hydraflow Express was used to estimate the drainage swale capacity; outputs are provided in Appendix A. The 25-year peak runoff rate from basin Post-A was estimated to be 1.59 cfs. The drainage swale has an estimated capacity of 1.73 cfs and is therefore adequately sized. 3.3 Ponds The pre- and post-development basin summaries were previously provided in Section 2. Stormwater runoff from the proposed development will drain to a proposed retention pond on the east side of the existing house. The retention pond was sized for the 10-year, 2-hour storm as specified in the COB Design Standards. The water quality volume, which includes runoff generated from the first 0.5-in of rainfall on impervious areas, is required to be stored and infiltrated on site. The retention pond sizing calculations are provided in Appendix A. A summary of the minimum pond sizing and design parameters is shown in Table 4. Table 4 – Retention Pond Sizing Pond Minimum Required Retention Volume (cf) Water Quality Volume (cf) Proposed Pond Bottom Area (sf) Proposed Storage Volume (cf) 1 1,369 369 488 1,419 A summary of the pond stage-storage relationship is outlined in Table 5. The storage volume was determined based on a volume analysis completed in Autodesk Civil 3D. Table 5 shows the pond provides adequate storage to control post-development runoff rates for the 10-year, 2-hour design event. In the event that the pond overtops, runoff will flow east toward Bozeman Creek. Ranieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 5 Table 5 – Pond Stage-Storage Stage (ft) Elevation (ft) Contour Area (sf) Storage (cf) 0.00 4730.00 488 0 0.10 4730.10 545 52 0.20 4730.20 602 57 0.30 4730.30 661 63 0.40 4730.40 720 69 0.50 4730.50 781 75 0.60 4730.60 843 81 0.70 4730.70 905 87 0.80 4730.80 969 94 0.90 4730.90 1,033 678 1.00 4731.00 1,099 785 1.10 4731.10 1,165 898 1.20 4731.20 1,233 1,018 1.30 4731.30 1,302 1,145 1.40 4731.40 1,371 1,278 1.50 4731.50 1,442 1,419 Groundwater data from the Gallatin City County Environmental Health Services online GIS map was utilized to estimate depth to groundwater at the site. Monitoring wells nearest to the site were located approximately 1,000-ft from the proposed retention pond and were generally located near Bozeman Creek. The highest recorded groundwater depth in the monitoring wells was 67” below existing ground. An existing COB public detention pond is located just south of the subject property, within the Bryant Street Right of Way. The detention pond is shown on record drawings from SID 599 (as well as the City Infrastructure Viewer) and was observed during the topographic survey of the site. The existing pond bottom is approximately 2-ft below adjacent ground elevations and does not show ponding based on aerial imagery or site observations. The proposed on-site retention pond bottom is approximately 2-ft below existing ground indicating that ground water should not be an issue. Ranieri Site Plan June 2023 Project: 22-074 Storm Drainage Report Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 6 4 Maintenance Plan All proposed storm drainage features will be privately owned and maintained by the property owner (Daniel & Simia Ranieri). Storm infrastructure generally consists of a sidewalk chase, drainage swale, & retention pond. The property owner will be responsible for the inspection and maintenance of all stormwater facilities located within the project limits. The following maintenance plan outlines the proposed inspection and cleaning schedule for the storm drainage facilities at the subject property.  Retention Basin o Inspection: Every 6-months and after large rainfall events o Cleaning/Maintenance Schedule: Annually or as needed based on inspection.  Remove sediment & litter/debris from all components of the retention basin.  Inspect the basin for signs of erosion and repair eroded areas accordingly.  Observe drain time following rainfall events to determine if the facility is clogged. If the observed drain time is longer than 72 hours, corrective action must be taken to return the retention basin to the design drain time.  Regularly mow/manage all vegetation associated with the retention basin and remove all clippings or other organic matter.  Remove sediment/debris from in-flow and overflow paths.  Inspect all components of the retention basin in accordance with an approved inspection form. Refer to the Montana Post-Construction Storm Water BMP Design Manual for additional information and example forms.  Vegetated Drainage Swale o Inspection: Every 6-months and after large rainfall events o Cleaning/Maintenance Schedule: Annually or as needed based on inspection.  Remove litter/debris from all components of the swale.  Regularly mow/manage all vegetation within the swale and remove all clippings or other organic matter.  Repair undercut and eroded areas as needed at swale inflow and outflow locations.  Examine channel bottom for evidence of erosion, braiding, excessive ponding or dead grass.  Check inflow points for clogging and remove any sediment.  Inspect side slopes for evidence of erosion.  Sidewalk Chase o Inspection: Every 6-months and after large rainfall events o Cleaning/Maintenance Schedule: Annually or as needed based on inspection.  Clear sidewalk chase openings when partially covered with sediment, vegetation, and/or debris. Maintenance is often needed during fall after leaves have fallen.  Ensure snow is not built up over sidewalk chase openings, clear snow and ice as necessary during winter months. Appendix A Supporting Calculations  Drainage Basin Summary Sheet  Water Quality Volume Calculation  Retention Pond Sizing Calculation  Gutter Flow Capacity Calculation  Hydraflow Express Swale Capacity Results  Pond State Storage  Hydraulic Calculations Project: Ranieri Site PlanProject Number: 22-074Location: Bozeman, MTAreaArea Open (sf)paved (sf) Overland flow (ft)grade (%)CCf  (25‐yr)Tc (min) Length Grade k Time (min)PRE‐DEVELOPMENT10‐yr i25‐yr I 10‐yr Q25‐yr QPre‐A 1.82 2.18 0.56 0.67 32,8700.7523,835 9,0350.41 12.00.20 44 0.93 0.2 1.1 11.18 127 2.31% 0.491 0.86Area Area POST DEVELOPMENT10‐yr i25‐yr i10‐yr Q25‐yr QOpen (sf) paved (sf) Overland flow (ft) grade (%) C Cf  (25‐yr) Tc (min) Length Grade k timePost‐A 2.86 3.40 1.33 1.59 32,8700.7514,555 18,3150.62 60.10 18 3.3 0.9 1.1 0.58 195 0.97% 0.619 1.61Drainage Basin OverviewIntensity (in/hr) Peak Q (cfs)Area (sf) Area (acres)Area (acres)Area (sf)**Column Headers that are underlined and red are manual inputsC value Tc (min) Tc (hr)Overland Tc (COB Design Standards) Manual ‐ Shallow Concentrated (TR‐55)BasinOverland Tc (COB Design Standards)Tc (hr)Tc (min)C valueManual ‐ Shallow Concentrated (TR‐55)Intensity (in/hr) Peak Q (cfs) Project: Ranieri Site Plan Project Number: 22-074 Location: Bozeman, MT Pre-Paved (sf) Post Paved (sf) Additional Pavement (sf) Water Quality Volume (cf) 0 8844 8844 369 Water Quality Volume Note: Post-Development paved/impervious area only includes those areas within the subject property (offsite areas not included) Project: Ranieri Site Plan Project Number: 22-074 Location: Bozeman, MT Calculation of Required Volume for Storm Detention/Retention Pond Pond ID Proposed Detention Pond Accepts flow from basins Post-A (Reference: Bozeman Stormwater Master Plan - 1982) Design Rainfall Freq. 10 year (see page III - 5 of master plan) IDF coefficient a 0.64 IDF coefficient b IDF coefficient n 0.65 Pre-development Calculations Post-development Calculations CC Areas (ft2):open space 23,835 0.20 Areas (ft2):open space 14,555 0.20 Impervious 9,035 0.95 Impervious 18,315 0.95 Total: 32,870 Total: 32,870 total area: 0.75 acres total area: 0.75 acres composite C: 0.41 composite C: 0.62 Overland tc 11.18 minutes Overland tc 0.58 minutes Channel tc 0.86 minutes Channel tc 1.61 minutes Total tc:12.0 minutes Total tc:6 minutes intensity at tc (fig 23):1.82 in/hr intensity at tc (fig 23):2.86 in/hr pre-devel peak runoff: 0.56 cfs post-devel peak runoff: 1.33 cfs Storm Duration Intensity Future Runoff Runoff Release Required (minutes) (in/hr) Rate (cfs)Volume (cf)Volume (cf) Storage (cf) 6 2.86 1.33 480 201 279 8 2.37 1.11 531 267 263 10 2.05 0.96 574 334 240 12 1.82 0.85 612 401 210 14 1.65 0.77 646 468 178 16 1.51 0.70 676 535 142 18 1.40 0.65 705 602 103 20 1.31 0.61 731 669 63 22 1.23 0.57 756 735 21 24 1.16 0.54 780 802 -23 required detention storage (ft3) =279 Retention Pond Calculations: Q = CIA C = 0.62 (post-development) I = 0.41 in/hr (10-yr, 2-hr storm) A = 0.75 acres Q = 0.19 cfs required retention storage (ft3) =1,369 ft3 detention pond COB 22-074 Street/Gutter Capacity ‐ Composite Section See 4‐11 of HEC‐22 Third Edition Qw Flow Rate in depressed section (gutter pan), cfs Q Total Flow Rate, cfs Qs Flow rate in raised section (street section), cfs Eo Ratio of flow in the gutter to the total flow (Qw/Q) Sx Street cross slope, ft/ft SL Longitudinal Slope, ft/ft Sw Gutter pan cross slope, ft/ft W Gutter Width from edge of pavement to flow line, ft T Overall Spread Width ‐ measured from flow line, ft Ts Spread Width on Street, ft Ku 0.376 metric (0.56 English) n Manning's Coefficient Maximum Allowable Steet Flow Rate Ku 0.56 0.376 metric (0.56 English) n 0.013 Manning's Coefficient Ts 15 Spread Width on Street, ft Sx 0.015 Street Cross Slope, ft/ft SL 0.031 Longitudinal Slope (ft/ft) Street Flow Qs 9.42 Based on Triangular Section Maximum Allowable Total flow rate Sw 0.0625 Gutter pan cross slope, ft/ft Sx 0.015 Street Cross Slope, ft/ft W 1.25 Gutter Width from edge of pavement to flow line, ft T 16.25 Overall Spread Width ‐ measured from flow line, ft Sw/Sx 4.166667 T/W 13 Eo 0.2259 Ts 15 Q 12.173 Total Flow Rate (cfs) Basin A 𝐸௢ ൌ 1 1 ൅ 𝑆௪𝑆௫ 1 ൅ 𝑆௪𝑆௫𝑇𝑊െ 1 ଶ.଺଻ െ 1 𝑄௦ ൌሺ𝐾௨ 𝑛ሻ𝑆௫ଵ.଺଻𝑆௅଴.ହ𝑇௦ଶ.଺଻ 𝑄ൌ 𝑄௦ 1 െ𝐸௢ Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jun 28 2023 <Name> Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 4731.00 Slope (%) = 0.98 N-Value = 0.033 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.50 Q (cfs) = 1.733 Area (sqft) = 1.00 Velocity (ft/s) = 1.73 Wetted Perim (ft) = 4.12 Crit Depth, Yc (ft) = 0.42 Top Width (ft) = 4.00 EGL (ft) = 0.55 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Elev (ft) Depth (ft)Section 4730.75 -0.25 4731.00 0.00 4731.25 0.25 4731.50 0.50 4731.75 0.75 4732.00 1.00 Reach (ft) Depth Q Area Veloc Wp Yc TopWidth Energy (ft) (cfs) (sqft) (ft/s) (ft) (ft) (ft) (ft) 0.05 0.004 0.010 0.37 0.41 0.04 0.40 0.05 0.10 0.024 0.040 0.59 0.82 0.08 0.80 0.11 0.15 0.070 0.090 0.78 1.24 0.12 1.20 0.16 0.20 0.150 0.160 0.94 1.65 0.16 1.60 0.21 0.25 0.273 0.250 1.09 2.06 0.20 2.00 0.27 0.30 0.444 0.360 1.23 2.47 0.24 2.40 0.32 0.35 0.669 0.490 1.37 2.89 0.29 2.80 0.38 0.40 0.956 0.640 1.49 3.30 0.33 3.20 0.43 0.45 1.308 0.810 1.62 3.71 0.37 3.60 0.49 0.50 1.733 1.000 1.73 4.12 0.42 4.00 0.55 Project: Ranieri Site Plan Project Number: 22-074 Location: Bozeman, MT Pond Stage‐Storage Summary POND A SUMMARY Pond Bottom 4730.00 Stage Elev Contour Area (sf) Storage (cf) 0.00 4730.00 488 0 0.10 4730.10 545 52 0.20 4730.20 602 57 0.30 4730.30 661 63 0.40 4730.40 720 69 0.50 4730.50 781 75 0.60 4730.60 843 81 0.70 4730.70 905 87 0.80 4730.80 969 94 0.90 4730.90 1033 678 1.00 4731.00 1099 785 1.10 4731.10 1165 898 1.20 4731.20 1233 1018 1.30 4731.30 1302 1145 1.40 4731.40 1371 1278 1.50 4731.50 1442 1419 Gallatin County GIS 311 W. Main Room 305Bozeman, MT 59715 Phone: (406) 582-3049 Email: GIS@gallatin.mt.gov June 20, 2023 Gallatin County GIS ± 0 0.035 0.07 0.105 0.14 Miles Water Addresses Minor Roads Numbered Highways StreamsRiversLakes Structure Addresses Recent AddressesParcels Cities Quarter Sections Subdivisions Minor Subdivisions " " Sections Townships Alley/Driveway Unpaved Paved Rail Line Montana U.S. Interstates Public Lands Local Government State of Montana U.S. Bureau of Land Management U.S. Forest Service U.S. Park Service GW Monitor Well: 2016-25-01 Highest Recorded GW Depth = 68" BGS GW Monitor Well: 2016-25-02 Highest Recorded GW Depth = 67" BGS GWIC Well 220564 Static Water Level = 5-ft Subject Property                   Appendix B Storm Drainage Plans