Loading...
HomeMy WebLinkAbout605 E Bryant - SEWER WATER DEMANDProject: Ranieri Site Plan Project Number: 22-074 Location: Bozeman, MT Sanitary Demand Residential 2.11 people/dwelling unit 6.33 people 89 gal/capita/day 563.37 gal/day Industrial Buildings & Offices 13 gal/day/employee Existing Residence 2 bedrooms Proposed Unit 1 Workshop/Warehouse Space 1392 sf (includes 1 accessory office) ADU 1 bedroom Proposed Unit 2 Workshop/Warehouse Space 1300 sf (includes 1 accessory office) ADU 1 bedroom Warehouses 500 sf/occupant Proposed Unit 1 3 occupants Proposed Unit 2 3 occupants Existing Residence 187.79 gal/day (Note that existing residence is  currently connected to Bozeman  Public WW System) Proposed Unit 1 Workshop/Warehouse Space 39 gal/day ADU 187.79 gal/day Total 226.79 gal/day Proposed Unit 2 Workshop/Warehouse Space 39 gal/day ADU 187.79 gal/day Total 226.79 gal/day Qavg Overall Total 641.37 gal/day (Including Existing Residence) Infiltration Rate 150 gal/acre/day (Per COB DSSP Section V.B.4) Lot Area 0.53 acres Infiltration 79.5 gal/day Qavg with Infiltration 720.87 gal/day Peak Sanitary Demand Existing Residence 2.11 people/dwelling unit (Per COB DSSP Section V.B.4) Proposed Unit 1 Workshop/Warehouse Space 3 employees ADU 2.11 people/dwelling unit (Per COB DSSP Section V.B.4) Proposed Unit 2 Workshop/Warehouse Space 3 employees ADU 2.11 people/dwelling unit (Per COB DSSP Section V.B.4) Population (In thousands) 0.01233 3175.8 gal/day 2.21 gal/min Qpeak  Typical Design Wastewater Flows (From MDEQ Circular 4 ‐ Chapter 3 & COB DSSP) Existing & Proposed Building Uses & Square Footage Estimated Number of Employees (From IBC Table 1004.5 ‐ Max Floor Area Allowances Per Occupant) Average Sanitary Demand Project: Ranieri Site Plan Project Number: 22-074 Location: Bozeman, MT Domestic Water Demand Residential 2.11 people/dwelling unit 6.33 people 170 gal/capita/day 1076.1 gal/day Industrial Buildings & Offices 13 gal/day/employee Existing Residence 358.7 gal/day (Note that existing residence water  supply is currently from on‐site  well. Connection to City water  proposed.) Proposed Unit 1 Workshop/Warehouse Space 39 gal/day ADU 358.7 gal/day Total 397.7 gal/day Proposed Unit 2 Workshop/Warehouse Space 39 gal/day ADU 358.7 gal/day Total 397.7 gal/day Qavg Overall Total 1154.1 gal/day Max day to average day ratio 2.3:1 (Per COB DSSP Section V.A.4) Qmax 2654.43 gal/day Peak Hour to average day ratio 3:01 (Per COB DSSP Section V.A.4) 3462.3 gal/day 2.40 gal/min Typical Design Water Demand (From MDEQ Circular 4 ‐ Chapter 3 & COB DSSP) Average Water Demand Peak Water Demand Qpeak