HomeMy WebLinkAbout7th & Aspen Mixed-Use C2.2 DEMO PLAN Phase 1 & 2_ADDENDUM 1TDTB24-008 C2.2 DEMODESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:REV DATE REVISION
7TH & ASPEN AFFORDABLE HOUSING
BOZEMAN, MT
DEMO PLAN
LOTS 4A & 6A BAS BAS CJCB24-008 SHEETC2.2.DWG6.21.2024NOT FORCONSTRUCTIONSITE PLAN REVIEWEngineering
tdhengineering.comFUTURE PHASE DEMOLITION: ALL ASPHALT PAVEMENT, SIDEWALK, CURB & GUTTER WITHIN BOUNDARY TO REMAINUNTIL FUTURE DEMOLITION DATE TO BE DETERMINED IN COORDINATION WITH THEGENERAL CONTRACTORNICCAPPING OF WATERSERVICE AT MAIN NOTINCLUDED IN THIS SCOPEOF WORKBOUNDARY OF WORK All demolition and renovation projects require an asbestos inspection by an accredited asbestos inspector. Residential • Residential units (duplex or smaller) are not regulated by the State of Montana. OSHA regulations may apply to residential work (Search 29CFR1926.1101 Online). Residential units (duplex or smaller) are not regulated by the State of Montana. OSHA regulations may apply to residential work (Search Online). Non-residential (Commercial & 3 or more units Multi-family) • Notify the Montana Department of Environmental Quality (MTDEQ) for all nonresidential demolition or renovation Notification forms are available at asbestos.mt.gov or call the DEQ Asbestos Control Program at (406) 444-5300 or email deqacponline@mt.gov. Forms must be received by DEQ two weeks prior to the start date of the project. For more information on the asbestos inspection requirement, locating an accredited asbestos inspector or other asbestos regulatory requirements go to asbestos.mt.gov or call (406) 444-5300. Notes: 1. Bids shall be submitted electronically to procurement@bozeman.net by 2:00 PM MST on August 7th, 2024.2. Performance and Surety Bonding is required per City of Bozeman regulations listed below3. Bids shall be submitted as a lump sum4. Initial demolition phase must be complete by October 1, 20245. Future phase demolition schedule TBD to be coordinated with General Contractor of new vertical construction6. Site shall be left clear of debris and rough grading replaced to approximate existing condition.8. Sidewalks and drive access along 7th avenue and within the within the 7th Avenue right-of-way shall remain and be protected to the extent possible during the course of the initial demolition phase.9. Work within the 7th Avenue street is not included in the scope of work. Only abandoning and protecting water service at curb stop is required. 10. Asbestos testing and abatement is not included in the scope of work.11. Compaction testing of other backfill material testing is not required.12. For those interested, the site and buildings will be open and available to inspect in-person along with the Owner and General Contractor from 4:00 PM - 5:00 PM on August 5th, 2024. ADDENDUM 18/1/202411