Loading...
HomeMy WebLinkAbout14_LSP_A305 Elevation-ExteriorMAIN LEVEL 0' - 0" B.O. CLG - MAIN 9' - 0" 15 LOWER LEVEL -8' - 7 3/4" L. L. - B.O. CLG -0' - 11 1/4" 24 T.O. GARAGE SLAB -1' - 9" 3 3" 12" NOTE: ALL FINISHES TO REMAIN; NEW FINSIHES TO MATCH EXISTING 01 01 D4 03 030303 03 03 03 03 02 02 02 01 4 A401 5 A401 03 S1 S1 S1 S1 S1 S1 S2 S2 S2 S2 S2 S2 @ INNER WALL S1 S1 S2 S2 MIN 4' - 0" W @ INNER WALL S3S3S3S3S3 S3S3S3 S4 S4 S4 S4 STRUCTURAL NOTE: SEE 2/S1.0 FOR NEW STRUCTURAL FRAMING & CONNECTIONS MAIN LEVEL 0' - 0" B.O. CLG - MAIN 9' - 0" B LOWER LEVEL -8' - 7 3/4" L. L. - B.O. CLG -0' - 11 1/4" CDE A T.O. GARAGE SLAB -1' - 9" 8" 12" 4" 12" 8" 12" 1 A401 NOTE: ALL FINISHES TO REMAIN; NEW FIBERCEMENT SIDING TO MATCH EXISTING FIBERCEMENT SIDING. NEW ENTRY ASPHALT SHINGLES TO MATCH EXISTING ASPHALT SHINGLES. NEW VINYL TRIM TO MATCH EXISTING. STRUCTURAL NOTE: SEE 2/S1.0 FOR NEW STRUCTURAL FRAMING AND CONNECTIONS02 D4 03 03 0302 01 01 01 ABV. SIDEWALK4' - 0"62 SQ FTFACADETOTAL FACADE = 62 SQ FT TOTAL TRANSPARANT MATERIAL = 32 SQ FT *OVER 25% OF FACADE IS TRANSPARANT PER TABLE 38.510.030.C 2 A401 3 A401 03 004 0303 INVERTED 'U' BIKE RACK (2) SPACES INVERTED 'U' BIKE RACK (2) SPACES S1: VERIFY EXG SHEATHING IS 7/16" or 15/32" OSB w/ 2x BLOCKING @ ALL EDGES w/ 8d @ 6" OC EDGE NAILING AND 8d @ 12" OC FIELD NAILING. IF SHEATHING IS INSUFFICIENT, REMOVE EXG AND BUILD OUT AS SPECIFIED. S2: MSTC-40 STRAP NAILED TO DBL (2) 2x6 KING STUD FROM INTERIOR, CENTER ON RIM BOARD FOR EQ TAILS. SEE 6/A501 FOR DETAIL. S3: HOLD DOWN (HD5B OR EQUAL), NAILED TO DBL (2) 2x6 KING STUD. S4: VERIFY ALL EXG 1/2" or 5/8" DIA. ANCHOR BOLTS HAVE 1/4"x3"x3" PLATE WASHERS PER IBC SEISMIC DESIGN CATEGORY D. ADD PLATE WASHERS WHERE NECESSARY. MAY USE 1/2" DIA. TITEN-HD CONCRETE ANCHOR SCREWS w/ MIN. 4" EMBED. w/ PL WASHERS WHERE NECESSARY.PLOT DATE:Design 212 S. WALLACE AVE STE. 301 BOZEMAN, MT tel. 406 -414 -7744 THRULINEPARTNERS.COM APPROVED BY: REVISION LOG REV # DATE DRAWN BY: SHEET NO. SHEET TITLE CLIENT NAMEPROJECT ADDRESSPERMIT NUMBER:FILE PATH:to Build Project No. DATE ISSUED:PAGE SIZE: ANSI D (22 X 34)03/01/24 1 09.08.2023 SP PERMIT RESUBMIT 12.06.2023 BUILDING PERMIT SET2 23167 03.01.2024 MOD APP SET3 2/28/2024 3:05:20 PMBIM 360://LSP/23.003_LSP_r21.rvtELEVATION - EXTERIOR LLG A305 Viviana Helvik130 Flanders Mill Rd. Bozeman, MT 59718LG / BMLITTLE SPANISHPRESCHOOL23.003 1/4" = 1'-0"1 ELEVATION - EAST PROPOSED 1/4" = 1'-0"2 ELEVATION - NORTH PROPOSED MATERIAL KEYNOTES 01 ASPHALT ROOFING (GRAY) WITH VINYL TRIM AND SOFFIT (WHITE). NEW TO MATCH EXISTING. 02 COMPOSITE WOOD SIDING (WEATHERED GREEN) WITH VINYL TRIM (WHITE). NEW TO MATCH EXISTING. 03 VINYL WINDOW (WHITE). 04 VINYL OVERHEAD GARAGE DOOR (WHITE). D4 NOTES - STRUCTURAL BRACING / SHEAR WALL