HomeMy WebLinkAboutSpec_Exterior DoorsTHRULINE PARTNERS DESIGN TO BUILD
BSB OAC MEETING
ATTENDEES:David Tolliver and Kat Belendiuk 2023 August 7
Jesse Brown,Josh Aarestad –Hyalite Custom Building
Suzanne McGee,Marit Lueth –Thruline Partners
Attendees met at the Thruline Partners Office at 4 PM.Meeting intent was to review HCB agenda items
and update from site.TLP Agenda:kitchen layout options.
ACTION ITEMS:
●TLP:
○Submit structural details to city
○Contact surveyor for plat and utility maps,alert to curb stop
○Investigate with city the potential of utilizing both water lines
○Confirm lower level egress window sill heights 44”max.
○Provide window R.O.framing Thursday 8/10
○Provide site plan to K&D for negotiating purchase of sliver of adjacent lot
○Follow up with Geotech Engineer re:foundation waterproofing approach and sump pump
○Send K&D WOH bedroom light alternatives
●HCB:
○Review trusses and roof framing once exposed,attn:above dining and kitchen
○Begin working w/Xypex waterproofing rep.Derek
○Salvage concrete slabs and stone fountain pieces
○Look into sump pump performance and drainage solutions
SCHEDULE
●TLP,HCB w/Structural engineer 10 AM,8/10 @ BSB.
●Next OAC meeting 4 PM,8/14 @ BSB or TLP
●HCB to complete demo this week (8.7 -8.11)
●Plan to begin window RO Thursday 8/10
MEETING NOTES:
BASEMENT BEAM
●Demo revealed compromised joists and awkward,jogged beam condition at media room/rec.
room ceiling beams.
●K&D approved moving forward with recessing new beam solution in floor pack.
●Team will review on site with structural engineer 8/10.
THRULINE PARTNERS ||212 S WALLACE AVE STE 301 BOZEMAN MT 59715 ||(406)282-4411
thrulinepartners.com
1
LITTLE SPANISH SCHOOL
YALE AU-626F Lever Handle, black
Half - lite hollow metal door, painted white
DATE:03-08-2024
SUBJECT:DAYCARE EGRESS PAIRS-THRULINE PARTNERS
LOCATION:BOZEMAN MT
ADDENDUMS:NONE SEEN
We Are Pleased To Provide The Following Quote:
SECTION QTY ITEM PRICE
NO SPEC 2 EA HOLLOW METAL FRAME-WELDED
●CURRIES NM SERIES FRAME
●16 GAUGE /PRIMED A60 COATED
4 EA HOLLOW METAL DOOR SLABS
●CURRIES 707-EGHGS SERIES 2 PANEL HALF LITE
●18 GAUGE /PRIMED /A60 COATED
NO SPEC 1 LOT FINISH HARDWARE
●12 EA MCKINNEY TA2314 4.5 X 4.5 NRP BSP HINGES
●4 EA YALE 2100 BSP RIM EXIT DEVICE
●2 EA YALE AU-626F BSP RIM EXIT EXTERIOR TRIM
●2 EA YALE KRM200 X 80”KEY REMOVABLE MULLION
●4 EA YALE 5831 BSP CLOSERS WITH SPRING STOP
●2 EA PEMKO 253X6AFG X 72”THRESHOLD
●4 EA PEMKO 3452BSPNB X 36”SWEEP
●2 EA PEMKO 2891BSPS X 72”HEAD GASKET
●4 EA PEMKO 290BSPS X 80”LEG GASKET
●2 EA PEMKO 5110BL X 120”MULLION GASKET
●2 EA HES 9400 BSP ELECTRIC STRIKE
●2 EA HES 2005M3 BRIDGE RECTIFIER
●4 EA MCKINNEY QC-C1500P WIRE CABLE
●2 EA MCKINNEY QC-C306P WIRE CABLE
●2 EA SECURITRON BSP 12/24-1 1 AMP POWER SUPPLY
●2 EA SECURITRON PB5 PUSH TO EXIT SWITCH
●2 EA HID4045CGNU0 KEYPAD-WEATHERIZED
●2 EA YALE 2153 BSP MULLION CYLINDERS
●2 EA YALE 1109 BSP EXIT DEVICE CYLINDERS
TOTAL:$16,802.00
IF FLUSH BOTTOM DOORS ARE ACCEPTABLE DEDUCT:<$1,604.00 >
NOTES
●1 DELIVERY FOR WELDED FRAMES &1 DELIVERY FOR DOORS &HARDWARE INCLUDED
●SUPPLY ONLY,NO INSTALL
●THIS QUOTE IS GOOD FOR 30 DAYS
●FOB:FULL FREIGHT ALLOWED TO THE NEAREST SHIPPING POINT
●MDP IS NOT RESPONSIBLE FOR LIFT GATE CHARGES ON DELIVERIES—FORKLIFTS ARE
REQUIRED FOR OFFLOADING.
∙∙∙
●PRICING SUBJECT TO REVIEW EVERY 30 DAYS UNTIL MATERIAL IS ORDERED BY MONTANA
DOORWAYS PLUS DUE TO MARKET CONDITIONS
BY OTHERS
●FINISH DOOR HARDWARE FOR ALUMINUM DOORS-UNLESS NOTED ABOVE
●GLASS-UNLESS NOTED ABOVE
●KNOX BOX
SINCERELY,
Todd Van Dyke
Estimator
todd@mtdoorwaysplus.com
Kim Nestegard •2