Loading...
HomeMy WebLinkAbout7th & Aspen Mixed-Use C2.2 DEMO PLAN Phase 1 & 2TDTB24-008 C2.2 DEMODESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:REV DATE REVISION 7TH & ASPEN AFFORDABLE HOUSING BOZEMAN, MT DEMO PLAN LOTS 4A & 6A BAS BAS CJCB24-008 SHEETC2.2.DWG6.21.2024NOT FORCONSTRUCTIONSITE PLAN REVIEWEngineering tdhengineering.comFUTURE PHASE DEMOLITION: ALL ASPHALT PAVEMENT, SIDEWALK, CURB & GUTTER WITHIN BOUNDARY TO REMAINUNTIL FUTURE DEMOLITION DATE TO BE DETERMINED IN COORDINATION WITH THEGENERAL CONTRACTORNICCAPPING OF WATERSERVICE AT MAIN NOTINCLUDED IN THIS SCOPEOF WORKBOUNDARY OF WORK All demolition and renovation projects require an asbestos inspection by an accredited asbestos inspector. Residential • Residential units (duplex or smaller) are not regulated by the State of Montana. OSHA regulations may apply to residential work (Search 29CFR1926.1101 Online). Residential units (duplex or smaller) are not regulated by the State of Montana. OSHA regulations may apply to residential work (Search Online). Non-residential (Commercial & 3 or more units Multi-family) • Notify the Montana Department of Environmental Quality (MTDEQ) for all nonresidential demolition or renovation Notification forms are available at asbestos.mt.gov or call the DEQ Asbestos Control Program at (406) 444-5300 or email deqacponline@mt.gov. Forms must be received by DEQ two weeks prior to the start date of the project. For more information on the asbestos inspection requirement, locating an accredited asbestos inspector or other asbestos regulatory requirements go to asbestos.mt.gov or call (406) 444-5300.