Loading...
HomeMy WebLinkAbout011 - Appendix J - CILWR Determination Request1 Tyler Steinway From:Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent:Thursday, January 18, 2024 5:04 PM To:Cody.Croskey Cc:Tyler Steinway; Will Krahn; Michael Berfield; Ari Goldstein; mtebele@starmandevelopment.com Subject:RE: [EXTERNAL]Preliminary CILWR for Aspen8 Mixed-Use Attachments:CIL WR Efficiency Rebate Agreement Template_DeveloperInputs.docx; ATT00001.txt; ATT00002.htm Hi Cody, Here is a preliminary determinaon. You know the dr ill but we’ll sll need to account for the irrigao n if sourced from the City’s system. If the plan is to source from a well we’ll just need to see a pre-determinaon from the DNRC. Also, this would be a great project for our high-efficency rebate program. The program provides a rebates of approximately 20% of the CILWR fee (~$43K) for the residenal units if high-efficiency fixtures (toilets, washers, and shower heads) are installed which meet the City Water Conservaon Division standards. The rebate would be released at occupancy and requires an agreement defining the terms and amount rebate to be finalized and executed with the site plan. A8ached is the agreement template for reference. If the owner is interested or has any quesons please let me know. Thanks, City of Bozeman MT Griffin Nielsen, PE| Engineering/Utilities Department D:406.582.2279 C:406.595.1598 gnielsen@bozeman.net 2 From: Cody J. Croskey <Cody.Croskey@tdhengineering.com> Sent: Thursday, January 18, 2024 2:53 PM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Cc: Tyler Steinway <tsteinway@intrinsikarchitecture.com>; Will Krahn <WillKrahn@cushingterrell.com>; Michael Berfield <mberfield@bridgesdev.com>; Ari Goldstein <ari@substrateac.com>; mtebele@starmandevelopment.com Subject: [EXTERNAL]Preliminary CILWR for Aspen8 Mixed-Use CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Griffin, We are working on a site plan for the Aspen8 Mixed-Use Building proposed at the NE corner of N. 8th Avenue and W. Aspen Street (behind U-Haul on N. 7th). Could you please provide a preliminary CILWR determinaon for the new mixed- use building based on the below informaon? Aspen8 Mixed-Use Building: New Dwelling Units = 289 New Unassigned Retail = 2,422 s.f. Let us know if you need any more informaon. Thanks, Cody Croskey, P.E. l Civil Engineer/Principal TD&H Engineering 234 E. Babcock Street, Suite 3 l Bozeman, MT 59715 p: 406.586.0277 l c: 406.580.0685 l d: 406.602.4091 www.tdhengineering.com