Loading...
HomeMy WebLinkAbout24 - Amendments Amendment Number Unknown - TD&H Engineering - Fire Station #2 CMU Changes First Amendment to Professional Services Agreement for Structural Special Inspections and Materials Testing for the Construction of Fire Station 2 FY 2024 – FY 2025 Page 1 of 2 FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Structural Special Inspections and Materials Testing for the Construction of Fire Station 2 dated April 25, 2023, (the “Agreement”) is made and entered into this _____ day of ____________, 2024, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and TD&H Engineering, 234 E Babcock St #4, Bozeman, MT 59715, hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Modification of Scope: Section 3 of the Professional Services Agreement is modified to include additional scope as specified in Exhibit A attached to this amendment. 2. Modification of Payment: Section 4 of the Professional Services Agreement is modified to include additional fee as specified in Exhibit A attached to this amendment. 3. Agreement still valid. All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** DocuSign Envelope ID: DA4FF10B-B041-41D3-B686-FFDA9C136161 February27th First Amendment to Professional Services Agreement for Structural Special Inspections and Materials Testing for the Construction of Fire Station 2 FY 2024 – FY 2025 Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA TD&H ENGINEERING By________________________________ By_____________________________ City Manager Print Name: Title: APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney DocuSign Envelope ID: DA4FF10B-B041-41D3-B686-FFDA9C136161 Principal Scott W. Mahurin EXHIBIT A DocuSign Envelope ID: DA4FF10B-B041-41D3-B686-FFDA9C136161 MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 December 15, 2023 Attn: Max Zeigler City of Bozeman 121 North Rouse Bozeman, MT 59718 RE: CITY OF BOZEMAN – FIRE STATION #2 CMU CHANGES TD&H ENGINEERING JOB NO. B23-034 Dear Max, Per our previous discussions our initial fee for the City of Bozeman Fire Station #2 project was based on scheduling information available this spring. The basis of our initial fee estimate was that the CMU inspections would take 240-hours for our inspectors. As discussed, the CMU construction ended up taking significantly longer than anticipated which required an increase in our efforts and total inspection time on the project. Working with the City of Bozeman, the Design Team, and the Contractor we were able to help reduce our efforts as the project progressed while still meeting the requirements of the IBC. Now that the CMU inspections are complete, we can see the extents of those efforts took an additional 43-hours of inspection on the CMU portion of this project. The additional costs incurred by this effort are $4,340. Please feel free to reach out to us if there are any questions or concerns. We appreciate the opportunity to assist on this project. Sincerely, Scott Mahurin PE/SE Structural Engineer TD&H ENGINEERING DocuSign Envelope ID: DA4FF10B-B041-41D3-B686-FFDA9C136161