HomeMy WebLinkAbout06-20-24 Public Comment - L. Wallace - Fowler changeFrom:Laurie Wallace
To:Bozeman Public Comment
Subject:[EXTERNAL]Fowler change
Date:Tuesday, June 18, 2024 8:46:02 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
There are good reasons to support designating parks or open space in this area that would
benefit people for many, many years to come and is an easy and cheaper way for the city tomanage the land. The NW side of town doesn't get to benefit as much from streams and trails
such as the Gallaghator, Sourdough, Peets Hill, and Story Mill... This is a great opportunity tocreate a landmark that preserves trees, wildlife and streamway as well as benefiting 1,000s of
residents at little or no additional cost.
Ways we can accomplish this:
1. Follow the template that already exists between Durston and the gravel trail that leads toBabcock:
1. Two Lanes (no median; except where it could save trees) 2. One paved shared use path on West side for cyclists & pedestrians
3. Sidewalk on the East Side using existing width boulevards
2. One shared use path only necessitates one crossing for bike/ped at Babcock & Fowlerwhich:
a) adds value to the existing crosswalk for neighbors 1) flashing light activated by pedestrians/cyclists (like path to the M)
b) increases safety c) saves money
3. Minimized road width helps preserve adequate buffer for trees & waterway:
a) canopy root ends need to be 30 ft. min. from edge of construction b) PLIU zoning designation preserves trees for park or natural area
c) abide by SLPP 200 ft. buffer for ditches
4. To make sure this project proceeds thoughtfully, it needs ecology experts on the designteam going forward:
a) Connect the Parks Department b) Connect Sustainability Citizen Advisory Board members
c) Connect all those engaged with the Bozeman Climate Plan
Thank you,Laurie Wallace
2724 Daisy Drive,Bozeman