HomeMy WebLinkAbout039 - Auxiliary Buildings 1 12 13 14 15 16 17 18 19 110 1„ 112 1
ARCHITECT
12
6 ENCLOSED BOTH GABLE ENDS. reztark
COVER BOTH SIDES OF EACH
GABLE WITH STUCCO A ARCHITECTURE PC.INC.
ASSEMBLY 601 607 MAIN
STREET,SUITE 200
8/BEAM-VAC CANOPY _ _ — CINCINNATI,OHIO45202
12'-V 513233.3333
J STEEL BUILDING STRUCTURE, J PROJECT—
PAINT PRIMARY STEEL FRAMES,
HORIZONTAL BEAMS,AND WIND
BRACES.00 NOT PAINT ROOF
PURLINS OR UNDERSIDE OF
DECK daft
T/CONC
VARIES SEE
CIVIL
FOUNDATION,SEE
STRUCTURAL DWGS TIDAL WAVE AUTOSPA
VALLEY CENTER RD
BOZEMAN,MT 59715
sE VACUUM CANOPY-END
H A905 3116"=V-0" H CLIENT
28'-0'AT ENDS I,
13'VRALFBAYWHERE INDICATED ON GVIL DRAWINGS T
NEW POTATO CREEK HOLDINGS,LLC
124 E.THOMPSON STIR EET
TOMASTON,GA SU86
G G CONSULTANT
JI STRUCTURAL
II I 2050 READING ROAD,SUITE 2W
LJ I II I I I I I CINCINNAT,
51399.820 OR 45202
LJ L LJ L) I� u I—I ul II I u I—I 0
I�--_LL7H - ��--ILTI -� �PIL_-JI,I
✓�I _��II U II II�U I _ nI I� �II�U IIi✓�U Ll 1IL UTJIII II I II +4✓P�U1LI --I I I----Ia�II---JIP�II I 1
A�9E05 KHNGINE ERS✓ n I, ✓ n 15ALEXNDRI AP IKES TE11
PORTTHOMAS,KY410I5
U UL L_ 4U Ui
14.W3.2662
CIVIL
— — — — — — SEPARATE OWN ER CONTRACT)
MADISON ENGINEERING
BOMMAN 59718
Ifi0.586.0262
F - ----------------- ----- ------ ---------------- F
I
CURB LINE,SEE CIVIL
sc VACUUM CANOPY-PLAN
A905 3/16"=V-U"
E 5s 11 E SEAL
PRE.FINISHED METAL ROOFING
ASSEMBLY,MATCH CAR WASH
BUILDING ROOF.
I I
B/BEAM-VAC CANOPY
I I I I
I q`q I I I
BRACEDBAY,COORDINATE V
D LOCATION W/STRUCTURAL D PROJECT REVISIONS
DWGS. —
ISSUED: 03/16/23
REVISED:
ONG T/G
DATE
0'-0" 1 05-10-22 ReWSIonIPTION
VARIES SEE
CIVIL
28'V AT ENDS FOUNDATION,SEE
STRUCTURAL DWGS.
13'-0"HPLF BAY WHERE INDICATED ON CIVIL DRAWINGS
sc VACUUM CANOPY-SIDE
A905 3/16"=1"..
00.8"
D 9.p U
670 17-10TT 670 —
24'-P
ENCLOSE BOTH GABLE ENDS, BARRIER GATE
7T COVER BOTH SIDES OF EACH 9'-0' 0-0"
14'-4' T-0' 7 PT 1 GABLE WITH DIRECT APPLIED
PRE-FINISHED METAL ROOFING FINISH SYSTEM OVER PAINT PRIMARY STEEL FRAMES, PREFABRICATED
ASSEMBLY,MATCH CAR WASH 11 SHEATHING AND METAL STUDS HORIZONTAL BEAMS AND WIN PAY STATION
BUILDING ROOF. FRAMES OF STEEL BUILDING.DO BOOTH.VENEER
NOT PAINT ROOF PURLINS OR
_ —B/HEAM-PAVSTATION _ BIBEAM-PAY STATION (� UNDERSIDE OF DECK '�I CAR WASH
1T� 1T 0 BUILDING PROJECT INFORMATION
PREFABRICATED PAY STATION PREFINISHEDMETALEAVE STEEL BUILDING STRUCTURE,
FLASH PAIN TPRIMARY STEELFRAMES, 6A TIDAL WAVE
BOOTH.VENEER TO MATCH CAST STONE CAP HORIZONTAL BEAMS,AND WIND
MAIN CAR WASH BUILDING. PREFABRICATED PAY BRACES.DO NOT PAINT ROOF A905 AUTOSPA
SEE PLAN FOR H BUILM. STATION BOOTH.VENEER PURLINS OR UNDERSIDE OF DECK CAMERA CAMERA
PROVIDE TO MATCH MAIN CAR WASH
EXTENTS ADDRESS: VALLEYCENTERRD
CONTINOUSE BUILDING.SEE ELEVATION
B SEGMENTAL FOAM, FOR APPROX.EXTENTS BOZEMAN,MT 59715
CAST STONE CAP,TYP. SEALALL SIDES PAV KIOSK.COORDINATE SOLID LINE B
SLOPED TO DRAIN PREFABRICATED PAY —
�_ MAINTAIN NOTCH IN STATION KIOSK.VENEER LOCATION OF PAY KIOSK INDICATES STONE PROD.No: 21039
SILL BLOCK FOR TO MATCH MAIN CAR WASH WITH OWNER VENEER DRAWN BY: DPB CHECKEDBY: DPB
b BUILDING.CONCEAL
PREFABRICATED PAY STATION ACCESSjj
—KIOSK.VENEER TO MATCH, CONDUIT -- PAY KIOSK. SHEETSRE:
MAIN CAR WASH BUILDING. 0'-0" COORDINATE
CONCEAL CONDUIT LINE OF PEMB CONCRETE ISLAND, LOCATION OF PAY CANOPY ROOF SHEET TITLE&NUMBER
FOUNDATION,SEE GROUND SIGN SEE CIVIL KIOSK WITH OWNER
FOUNDATION,SEE STRUCTURAL DWGS. 2A AUXILIARY
_ STRUCTURAL DWGS.
_ _ _ A9os BUILDINGS
E---7 C--- E---I ---� -
�u1 PAY STATION-SIDE sA PAY STATION-END 9A PAY STATION-PLAN
A9 0 5
A A
11 12 13 14 15 16 17 18 19 110 I„ 112 1 Copytlght202, REZTARK ARCHITECTURE PC,INC.