HomeMy WebLinkAbout009 - General Notes&
ENGINEERS
PLANNERS
SURVEYORS
DESIGNER
DRAWN
CHECKED
PROJ. NO.
DATE
SURVEYED
DESCRIPTIONDATEREVISION SHEET
OF
8/10/23 10:47 KYLE.DRUYVESTEIN F:\7350 TIDAL WAVE AUTO SPA, NORTH 19TH, BOZEMAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\2 - GENERAL NOTES, LEGEND & ABBREVIATIONS.DWG;252
---
DJ&A, P.C.
08/25/2023
7350
MR
KD
KD
AND ABBREVIATIONS
GENERAL NOTES, LEGEND
BOZEMAN, MT
TIDAL WAVE AUTO SPA
NORMAL CROWN
NORTH
NUMBER
OUTSIDE DIAMETER
PAVEMENT
PERCENT
PERFORATE
POINT OF COMPOUND CURVE
POINT OF CURVE
POINT ON CURVE
POINT OF INTERSECTION
POINT OF REVERSE CURVE
POINT ON TANGENT
POINT OF TANGENT
POINT OF VERTICAL INTERSECTION QUANTITIES
SCHEDULE
SLOPE DESIGNATION
FRONT FACE OF CURB PAN
FLOW LINE
QUANTITIES
RADIUS
RADIUS POINT
RAIL ROAD
RED PLASTIC CAP
REQUIRED
RIGHT
RIGHT-OF-WAY
ROAD
SECOND (ANGULAR)
SIDEWALK
SOUTH
SPECIFICATION
SQUARE
SQUARE FOOT
SQUARE YARD
STANDARD
STREET
STATION
SUPERELEVATION RATE
SYMMETRICAL
TANGENT
TEMPORARY BENCH MARK
TOP BACK OF CURB
TYPICAL
VERTICAL CURVE LENGTH
VERTICAL POINT OF INTERSECTION
WEST
NC
N
NO.
OD
PVMT.
PCT. OR %
PERF.
PCC
PC
POC
PI
PRC
POT
PT
PVI
QUANT.
SCH.
HORIZ:VERT
FF
FL
QUANT.
R
RAD PT.
R-R
RPC
REQD.
RT
R/W
RD.
"
S/W
S
SPEC.
SQ
FT², SF
SY
STD
ST
STA
E
SYM.
TAN.
TBM
TBC
TYP.
VC
VPI
W
ABBREVIATIONS
ALTERNATE
AND
AND SO FORTH (ET CETERA)
APPROXIMATE
ASPHALT
AT
BEGIN VERTICAL CURVE ELEVATION
BEGIN VERTICAL CURVE STATION
BENCH MARK
BLUE PLASTIC CAP
CENTERLINE
CLEAR
CONTROL POINT
CORRUGATED
CORRUGATED METAL PIPE
CUBIC YARD
CUBIC FEET
CULVERT
CURVE DELTA
DEGREE
DIAMETER
DRAWING(S)
DRIVE
EACH
EAST
ELEVATION
ENGINEER(S)
END VERTICAL CURVE ELEVATION
END VERTICAL CURVE STATION
EXCAVATION
EXPANSION JOINT
FINISHED GRADE
FOOT (MEASUREMENT)
FOUND
GALVANIZED GAGE (GAUGE)
HEXAGON
INSIDE DIAMETER
INVERT
INVERT ELEVATION
LEFT
LENGTH OF CURVE
LINEAL FOOT
LOOP
LUMP SUM
MILES
MAXIMUM
MINUTE(S) (ANGULAR)
MINIMUM
MISCELLANEOUS
MONUMENT
ALT.
&
ETC.
APPROX.
ASPH.
@
BVCE
BVCS
BM
BPC
CL, C/L
CLR.
CP
CORR.
CMP
CY
FT³, CF
CULV.
Δ
°, DEG.
DIA., D, Ø
DRWG(S).
DR
EACH
E
ELEV., EL.
ENGR(S).
EVCE
EVCS
EXC.
EXP. JT.
FG
FT. OR '
FND
GALV. GA.
HEX.
ID
INV.
IE
LT
L
LF
LP
LS
M
MAX.
'
MIN.
MISC.
MON.
1.SPECIFICATIONS: CONSTRUCT THE PROJECT IN COMPLIANCE WITH THE CITY OF BOZEMAN STANDARD DETAILS AND DRAWINGS (AND MODIFICATIONS
TO MPWSS). IF CITY OF BOZEMAN STANDARDS ARE NOT PRESENT FOR A CONSTRUCTION ITEM, CONTRACTOR TO CONSTRUCT TO BE IN COMPLIANCE
WITH MONTANA PUBLIC WORKS STANDARDS AND SPECIFICATIONS. ALL WORK AND IMPROVEMENTS WITHIN VALLEY CENTER ROW TO BE PERFORMED
IN ACCORDANCE WITH MONTANA DEPARTMENT OF TRANSPORTATION (MDT) STANDARDS AND SPECIFICATIONS.
2.EROSION CONTROL PLAN & CITY OF BOZEMAN SWPPP: SUBMIT A SOIL EROSION CONTROL PLAN TO THE CITY OF BOZEMAN, PROVIDE METHODS TO
PREVENT RUNOFF FROM THE CONSTRUCTION SITE. THE CONTRACTOR MUST OBTAIN A REQUIRED CITY OF BOZEMAN SWPPP PERMIT. THE
CONTRACTOR MUST SUBMIT ALL SWPPP REPORTS TO THE ENGINEER. THE CONTRACTOR IS REQUIRED TO SUBMIT TO CITY OF BOZEMAN
ENGINEERING ANY ADDITIONAL REPORTS AT TIME OF NOTICE OF TERMINATION (SWPPP PERMIT CLOSE-OUT) IF FINAL STABILIZATION OF SITE HASN'T
BEEN ACHIEVED AT TIME OF ENGINEER'S FINAL WALK-THROUGH.
3.DISPOSAL: ALL MATERIALS DESIGNATED FOR REMOVAL BECOME THE PROPERTY OF THE CONTRACTOR UPON REMOVAL AND ARE TO BE DISPOSED
OF IN AN ENVIRONMENTALLY SAFE MANNER IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS. PROPER DISPOSAL OF
MATERIALS DESIGNATED FOR REMOVAL ARE INCIDENTAL TO OTHER ITEMS IN THE CONTRACT UNLESS OTHERWISE NOTED.
4.EXISTING UTILITIES: UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE. NOT ALL UTILITIES MAY BE SHOWN. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES THAT MAY BE IMPACTED BY THIS PROJECT. REFER TO PROJECT SPECIFICATION
SECTION 01041 FOR UTILITY COMPANY CONTACT INFORMATION AND COORDINATION REQUIREMENTS.
5.COORDINATION WITH LANDOWNERS: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH LANDOWNERS AND BUSINESS OWNERS
ADJACENT TO THE PROJECT TO SCHEDULE WORK OR PROCURE ANY NECESSARY TEMPORARY CONSTRUCTION EASEMENTS THAT MAY AFFECT
ACCESS TO THEIR PROPERTIES.
6.SETTING SIGNS: SET STREET SIGNS IN ACCORDANCE WITH THE DRAWINGS, AND THE CITY OF BOZEMAN STANDARD DETAILS.
7.ACCURACY: EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH THE FIELD VERIFICATION & EXISTING PLAN
REVIEW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, & TO COORDINATE ALL ASPECTS OF
THE PROJECT BEFORE CONSTRUCTION, ORDERING, AND INSTALLATION OF ANY COMPONENT. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.
8.ABBREVIATIONS: DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE
QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES & TECHNIQUES FOR THE EXTENT & TYPE OF WORK DESCRIBED HEREIN.
9.SCALING: DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT
THE ENGINEER ON RECORD IMMEDIATELY FOR WRITTEN CLARIFICATION.
10.COMPLIANCE: CONSTRUCTION SHALL COMPLY WITH ENVIRONMENTAL PROTECTION AGENCY REGULATIONS, OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION, AND CITY OF BOZEMAN REGULATIONS.
11.DISTURBANCE: THE CONTRACTOR SHALL ONLY DISTURB WITHIN THE LIMITS OF DISTURBANCE SPECIFIED AND SHOWN ON THE CONSTRUCTION
DRAWINGS. NO GROUND DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS UNLESS APPROVED BY THE CONTRACTING OFFICER PRIOR TO
CONSTRUCTION. ALL DISTURBANCE AREAS MUST BE RESTORED TO PRE-CONSTRUCTION OR BETTER CONDITIONS AT THE COMPLETION OF WORK.
12.A GEOTECHNICAL EXPLORATION AND REPORT WERE COMPLETED FOR THIS PROJECT, CONTRACTOR TO REVIEW THE REPORT IN CONJUNCTION WITH
THE CIVIL ENGINEERING PLAN SET.
13.PEAK HOUR TRAFFIC WAS DETERMINED TO BE A WEEKDAY AT 5 PM WITH A PEAK HOUR TRAFFIC RATE OF 77.5.
GENERAL NOTES
LEGEND
EXISTING
EW
ES
UTV
UGP UNDERGROUND POWER LINE
UNDERGROUND FIBER OPTIC LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND CATV-TV SPECIFIC LINE
UNDERGROUND GRAVITY SEWER LINE/MAIN
UNDERGROUND WATER LINE/MAIN
MAJOR CONTOUR LINE
CURB LINE (FACE OR TOP BACK)
3200
FENCE - CHAIN LINK
MINOR CONTOUR LINE
>>>FLOWLINECULVERT PIPE
EDGE OF ASPHALT
UNDERGROUND NATURAL GAS LINE/MAIN
PROPOSED
CURB LINE (FACE OR TOP BACK)
CONCRETE SIDEWALK
EDGE OF ASPHALT
EDGE OF CONCRETE
2" WATER SERVICE LINE
4" SEWER SERVICE LINE
UNDERGROUND ELECTRICAL LINE
UNDERGROUND TELEPHONE LINE
BUILDING FOOTPRINT
MAJOR CONTOURS
MINOR CONTOURS
E
TV
S 4"
W 2"
3200
RIGHT OF WAY
PROPERTY BOUNDARY
RW
TREE
ELECTRICAL APPURTENANCE
TELEPHONE APPURTENANCE
SITE LIGHTING
NG
UGT
FO
E
T
SETBACK