This report addresses how water and sanitary sewer facilities were designed for the Tidal Wave
Auto Spa. These service laterals were designed to meet the Montana Public Works Standard
Specifications (MPWSS) and the City of Bozeman Engineering Division Standards.
This report will cover an introduction with general information about the project and info regarding
the existing conditions. This report will then move on to discuss the proposed water and sewer
improvements for this site and how each element was designed. For narrative and calculations
related to stormwater, see the separate Drainage Report.
Utilities Report
Tidal Wave Auto Spa
August 4, 2023
Table of Contents
Utilities Report ............................................................................................................................... 1
Introduction ................................................................................................................................... 1
1.0 General Information .................................................................................................... 1
1.1 Existing Wastewater Facilities .................................................................................... 2
1.2 Existing Water Facilities .............................................................................................. 2
Proposed Improvements ............................................................................................................... 2
2.0 Gravity Sewer System Improvements ......................................................................... 2
2.1 Water System Improvements ...................................................................................... 2
References .................................................................................................................................... 4
Appendices
Appendix A Utility Plans……………………………………………………………………...5
Appendix B Sewer and Water Demand Calculations.….………………………………...6
Utility Report
Tidal Wave Auto Spa
1
Introduction
1.0 General Information
The project site is located in Bozeman, Montana on the northwest corner of North 19th Ave and
Valley Center Road and is in Gallatin County Subdivision Phase 1, Section 35, Township 1 South,
Range 5 East, Lot 2, Gallatin County, Montana.
The existing project site is an undeveloped lot with a sewer main running through the Northern
end of the property and a water main running through the Southern end of the property.
Figure #1: Project Site
The sewer and water system will be owned and operated by the business operator, Tidal Wave
Auto Spa.
The Engineer of Record for the sanitary sewer and water service laterals portion of this project is
Mike Russell, 59647PE, licensed in the State of Montana.
Utility Report
Tidal Wave Auto Spa
2
1.1 Existing Wastewater Facilities
The City of Bozeman’s existing sanitary sewer main is running from west to east within an existing
30’ public utility easement. This main line is identified as 24” diameter Poly Vinyl Chloride (PVC)
pipe according to the Bozeman Infrastructure viewer. Along the sewer main alignment through
this property is a sewer manhole near the northeast. There is an assumption that a 10” stub exists
at this manhole, this assumption is based on pre-design meetings with the city. The current design
will tie into this existing stub for wastewater service. Additionally, this sewer main line will be
protected in place during construction activities but will be tied into for service connection.
1.2 Existing Water Facilities
The City of Bozeman’s existing water main is running west to east within an existing 30’ public
utility easement on the site property. This main line is identified as 12” diameter Ductile Iron (DI)
pipe according to the Bozeman Infrastructure viewer. There is no known accompanying water
appurtenances located on this property. This water main line will be protected in place during
construction activities but will be tied into for service connections.
There are no existing fire hydrants located on this property, with the nearest fire hydrant located
approximately 250 feet from the property line at the neighboring Residence Inn. This project will
install a new fire hydrant located near the wash tunnel exit.
Proposed Improvements
2.0 Gravity Sewer System Improvements
The gravity sewer system improvements include: a sewer service lateral to service the proposed
carwash building, which will tee two incoming lines from the carwash building. One service line
will be coming from the carwash’ s restrooms and the other line will come from the recirculation
tank. The proposed sewer service laterals shall maintain a minimum of 1% slope towards the
sewer main.
All proposed sewer services laterals for this site are proposed to be 6” in diameter. These laterals
will all feature cleanouts at bends that are present, as well as, upon entering the proposed
building, grease interceptor and comfort station. International Carwash Association (ICA), has
provided the building demand to be 17.7 GPM on average and 74.5 GPM at peak hour.
2.1 Water System Improvements
The water system improvements include a potable water service to the proposed building, as well
as a fire hydrant lateral/assembly to a proposed fire hydrant in a landscape island near the
carwash exit.
Utility Report
Tidal Wave Auto Spa
3
The proposed potable water service for the proposed building will tie into the existing water
main within public utility easement. This water service lateral is proposed to be 2” diameter.
Due to the nature of the proposed building, there is no proposed fire service later.
For the purposes of fire protection—this project will include a fire hydrant lateral/assembly within
a landscape island of the parking lot. This hydrant will have a line that runs south to tie into the
existing water main running through the property. This fire hydrant lateral will be 6” diameter.
ICA has provided the water demand for this project to be 20.8 GPM on average and 87.2 GPM
at peak hour.
For the purposes of landscape management - the site will incorporate landscape irrigation to
ensure the upkeep of its visual appeal. DJ&A Landscape architects have calculated an average
irrigation water demand of 20.8 GPM. This irrigation system is vital for sustaining the
landscaping's aesthetics and vitality, in line with the site's water management goals.
Utility Report
Tidal Wave Auto Spa
4
References
City of Bozeman Municode. (Published in 2011).
Montana Department of Environmental Quality. (May 3rd, 2016 Edition). Circular DEQ-2 -
Design Standards for Public Sewerage Systems.
Montana Public Works Standard Specifications. (2021, 7th Edition).
Utility Report
Tidal Wave Auto Spa
5
Appendix A – Utility Plan
FO * * * * * * UGT
UGT UGT
UGT
FO FO FO FO FO FO FO
FO FO
FO
FO
UGP UGP UGP
UGP
UGP
ES
ES
ES
ES
ES
UGT
UGT UGT UGT UGT
UGT
UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT
UGT
UGT
EW
EW
EW EW EW EW EW
EW >>>>>>>>>>>>R/W
R/W
R/W
TT
E
E
E
E
EE
WV
TV
E E E E E
T
T
T
T
S
E E E
E E E
TVTVTVTVTVTVTVTVTVTVTVTVTV
TV
S 6''S 6''S 6''S 6''W 2''W 2''EEEEEEEEEEE EEEEEWVEEEE
HY DWVSWSWSWSWSWSWSWSW>>>>>>>>>>>>>>>&
ENGINEERS
PLANNERS
SURVEYORS
DESIGNER
DRAWN
CHECKED
PROJ. NO.
DATE
SURVEYED
DESCRIPTIONDATEREVISION SHEET
OF
8/17/23 10:52 KYLE.DRUYVESTEIN F:\7350 TIDAL WAVE AUTO SPA, NORTH 19TH, BOZEMAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\5 - UTILITY PLAN.DWG;255
---
DJ&A, P.C.
08/25/2023
7350
MR
KD
KD
UTILITY PLANBOZEMAN, MT
TIDAL WAVE AUTO SPA
SCALE IN FEET
0 25 50
DRY UTILITIES (TELEPHONE,
FIBER, POWER, PROTECT IN
PLACE, TYP.
DRY UTILITY APPURTENANCES,
PROTECT IN PLACE, TYP.
STREET LIGHTING,
PROTECT IN PLACE, TYP.
TELEPHONE PEDESTAL,
PROTECT IN PLACE, TYP.
WATER RECLAIM LINES AND TANKS, SEE
DETAIL 1 SHEET 15
(2)6" SCH 80 CONDUIT LINES TO BE INSTALLED
UNDER CONCRETE TO ROUTE THE
ELECTRICAL LINES TO VACUUM SYSTEMS ON
NORTHWEST SIDE OF DRIVE AISLE, SEE
ELECTRICAL SHEETS
SEE ELECTRICAL SHEETS FOR CONDUIT
ROUTES FOR PAY STATION APPURTENANCES
6" Ø SANITARY SEWER
SERVICE LINE, TYP. SEE
DETAIL 1, SHEET 10
2" Ø WATER SERVICE LINE, TYP.
SEE DETAIL 2, SHEET 9
SEWER CLEANOUT REQ'D AT BENDS,
TYP. SEE DETAIL 3, SHEET 9
24" Ø PVC SEWER
MAIN, PROTECT IN
PLACE, TYP.
12" Ø DUCTILE IRON WATER
LINE, PROTECT IN PLACE, TYP.
UNDERGROUND ELECTRICAL SERVICE
LINE, ROUTING SHOWS SCHEMATIC
LAYOUT, COORDINATE WITH
ELECTRICAL PLANS
UNDERGROUND TELEPHONE LINE,
SEE ELECTRICAL SHEETS
WATER VALVE, 8' FROM
TIE IN TO WATER MAIN
GENERAL NOTES
1.CONTRACTOR TO VERIFY EXISTING
CONDITIONS PRIOR TO COMMENCEMENT
OF CIVIL-RELATED WORK.
2.UTILITIES SHOWN ON THE PLANS ARE
APPROXIMATE. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO VERIFY
LOCATIONS OF ALL UTILITIES WITHIN THE
PROJECT LIMITS.
3.SEE LANDSCAPING SHEET FOR IRRIGATION
LINES.
4.SEE ELECTRICAL SHEETS FOR SITE
LIGHTING.
5.CONTRACTOR TO ENSURE ADEQUATE
SLOPE FOR SEWER SERVICE LINE.
6.DRY UTILITY LINE LAYOUTS SHOWN FOR
SCHEMATIC PURPOSES.
CONNECT TO EXISTING 24" PVC SANITARY SEWER MAIN AT APPROX.
4666.33, CONTRACTOR TO VERIFY. PER CITY OF BOZEMAN, A STUB
EXISTS AT THE MANHOLE THAT CAN BE TIED TO.
SEWER MANHOLE
RIM ELEVATION: 4666.33
NNWE TRANSFORMER WITH ELECTRICAL
METER ATTACHED ON TOP 6.5' X 7.5'
CONCRETE PAD, SEE ELECTRICAL SHEETS
FIRE HYDRANT PER CITY OF
BOZEMAN STANDARDS
6" Ø FIRE HYDRANT ASSEMBLY PER
CITY OF BOZEMAN STANDARDS
SEE ARCHITECT PLANS FOR UTILITY TIE IN
ELEVATIONS TO BUILDING
SEWER SERVICE LINE AT APPROX. 4666,
CONTRACTOR TO VERIFY
SANITARY TEE NEEDED TO TIE IN
RESTROOM SERVICE LINE
12" Ø HDPE CORRUGATED
STORMWATER PIPE TO FLOW
AND DAYLIGHT AT DRAINAGE
POND
DOWNSPOUTS TO BE PIPED UNDERGROUND WITH 3" Ø HDPE
PIPE TO TIE INTO MAIN 12" Ø PIPE AND DRAIN TO POND. 3" Ø
HDPE PIPE WILL SLOPE A MINIMUM OF 4% TYING INTO THE
12" Ø PIPE WHICH WILL SLOPE AT A MINIMUM 1%.
PROPERTY LINE, TYP.
DRAINAGE POND
TRASH/RODENT RACK
REQ'D AT PIPE OUTLET
Utility Report
Tidal Wave Auto Spa
6
Appendix B– Sewer and Water Demand Calculations
Wastewater Daily Flow Analysis
Tidal Wave Auto Spa Car Wash
Average Daily Flow
Daily Water Usage (Applicant provided)10,000 gpd
Estimated Vehicle/Day 200 vehicles
Est. Water Usage/Vehicle 50 gallons/vehicle
% of Loss due to drive-off/evaporation 15%See Note #1 below
Est. Wastewater Discharge/Vehicle 42.5 gallons/vehicle
Estimated Daily Wastewater Discharge 8,500 gallons/day
Conversion to Residential Population 65 gallons/person/day
Equivalent Population 131 people
=Q(max)= 18 + P
0.50 P = Population/thousands = 131/1000 = ####
Q(ave)4 + P
0.50
Peaking Factor =
Peak Hour Sewer Demand
Average Daily Flow 8,500 gpd
1,063 gph 8-hour period
17.7 gpm
Peaking Factor 4.21
Peak Hour Sewer Demand 4,473 gph
74.5 gpm
597.95 cfh
9.97 cfm
0.166 cfs
Notes:
1. Data provide from a report prepared by International
Carwash Association
8/25/2021
4.21
Peaking
Factor
Estimated Water Demand Analysis
Tidal Wave Auto Spa Car Wash
Average Daily Flow
Daily Water Usage (applicant provided)10,000 gpd
Estimated Vehicle/Day 200 vehicles
Estimated Water Usage/Vehicle 50 gallons/vehicle
Estimated Daily Water Usage 10,000 gallons/day
Conversion to Residential Population 65 gallons/person/day
Equivalent Population 154 people
=Q(max)= 18 + P
0.50 P = Population/thousands = 154/1000 = ####
Q(ave)4 + P 0.50
Peaking Factor =
Peak Hour Water Demand
Average Daily Demand 10,000 gpd
1,250 gph 8-hour period
20.8 gpm
Peaking Factor 4.19
Peak Hour Water Demand 5,234 gph
87.2 gpm
699.77 cfh
11.66 cfm
0.194 cfs
8/25/2021
4.19
Peaking
Factor
WATER SOURCE INFORMATION:Estimated Average Demand =20.8 GPM
FLOW AVAILABLE:Custom Max Flow =45.15 GPM
Flow Available =45.15 GPM
PRESSURE AVAILABLE:Static Pressure at POC =50 PSI
Pressure Available =50 PSI
DESIGN ANALYSIS:Maximum Station Flow =30 GPM
Flow Available at POC =45.15 GPM
Residual Flow Available =15.15 GPM
CRITICAL STATION (12):Design Pressure =40 PSI
Friction Loss =3.02 PSI
Fittings Loss =0.3 PSI
Elevation Loss =0 PSI
Loss through Valve =1.5 PSI
Pressure Req. at Critical Station =44.8 PSI
Loss for Fittings =0.35 PSI
Loss for Main Line =3.51 PSI
Loss for POC to Valve Elevation =0 PSI
Loss for Back Flow =0 PSI
Critical Station Pressure at POC =48.7 PSI
Pressure Available =50 PSI
NOTE:
1. Generated 2023-08-07
Landscape Irrigation Demand
Tidal Wave Auto Spa