Loading...
HomeMy WebLinkAbout06-04-24 Correspondence - MT Dept. of Transportation - I-90 Construction Update Construction Update VISION ZERO 1-90 Bozeman East Pavement Preservation PO Box 201001 Helena,MT 59620-1001 - - -— -- a �`] l —twgwo MDT and Knife River are continuing to rehabilitate 1-90 between the Rouse Avenue overpass and the Fort Ellis overpass in Bozeman. Milling and paving of the ramps of the Main Street Interchange (Exit 309) is complete. 1*4 Planned improvements: • Removing and replacing the asphalt pavement. KNIFE Cyndy Andrus • Rehabilitating bridges including bridge deck repairs, RIVER Mayor bridge deck sealing, and replacing expansion joints. • Adding new shoulder rumble strips, signage, and upgraded guardrail. City of Bozeman 30 • Applying a seal and cover(chip seal)and final pavement markings. Bo BOXzeman, M, MT 59771 • Repaving the on-and off-ramps at the Main Street Interchange(Complete) Bo See reverse for more Alternative accessible formats of this document will be provided on request. Persons who need an alternative format should contact the Office of Civil Rights, Montana Department of Transportation,2701 Prospect Avenue,PO Box 201001, Helena,MT 59620.Telephone 406-444-5416 or Montana Relay Service at 711. This document is printed at state expense.Informa1ipn_oo,tbe_co4tcfproducing ijj,j;ii,;i�jjjj,iijj�j i,j,jj„�Ij��j>>jjj�Fjjjij�j�j(jjjjjy-H this publication may be obtained by contacting the Depar#rreMt�ol�r7iinistration. lop Atj1:#k1J N 9 RVAT1 &FIC NT PRESE PpVEME TrtA nt of Transpo�ation (MD BEI.GRADE The Montana De'Pa'tme �mate� E a rox y r arerehabih�a�ing �p andVCMeRwe Main street 3 miles of interstate 90 I-90 in eozemanbe�w2en Interchange the Rouse Avenue overpass and the Fort Ellis zQ o a EXIT 309 Road overpass. Traffic will be crossed over in a z PROJECT two-lane configuration and both eastbound and Main Street AREA westbound traffic will travel on the same side of ♦ the interstate for approximately two N Frontage Road months, weather and other unforeseen Map not to scale. BOZEI"H factors permitting. STAY INFORMED, Motorists can expect: Visit the websit&-.Tmft.Mt.gov/ 0 Crossover traffic patterns on 1-90. pubinvolve/i90bozemaneast/ S Both east and westbound traffic TEXT/SMS UPDATES:text(toll-free)' � Bozeman traveling on the same side of 1-90. BZEAST to 866-434-0866 LL Trail Road Traffic reduced to one lane in EMAIL UPDATES:Brandon@rbci.net Bear each direction. 406-333-7461 Canyon Road Reduced speed limits. Texting alerts are not managed by MDT and may have EXIT 313 • Wide loads restrictions at different privacy and security policies.For more times. Visit 511mt.net for the information read the SimpleTexting Privacy Policy by visiting https; simpletextigg.com/privacy-policy/... ,. LIVINGSTON most up-to-date information.