recognize the sender and know the content is safe.
May 30, 2024; 9:45am
To: Mayor Terry Cunningham, Commissioner Douglas Fischer, and Director of
Transportation and Engineering Nick Ross
Subject: Fowler Ave Connection (FAC); a complete FAC 30% design walk-through isneeded
I am writing to thank the City for offering an FAC 30% design walk-through for Oak St to
Durston Rd on June 12. That said, I am also writing to say the public deserves theopportunity for an FAC 30% design walk-through for Durston Rd to Huffine Ln before the
June 18 City Commission meeting—the meeting at which the City is scheduled to presentthe FAC 60% design to the public.
If there is not time before June 18 for the City to hold a Durston Rd to Huffine Ln walk-
through, then I ask the City to postpone presenting the FAC 60% design until such time asthe public has had the opportunity to do an FAC 30% design walk-through of the entire
length of the FAC from Oak St to Huffine Ln. Thank you.
Sincerely,
Daniel Carty213 N. Third Ave
Bozeman, MT 59715
dgc12@hotmail.com406-548-2810
cc: comments@bozeman.net for the public record
From:Nicholas Ross
To:Daniel Carty
Cc:Bozeman Public Comment; Takami Clark; Terry Cunningham; Douglas Fischer; Chuck Winn
Subject:RE: [EXTERNAL]Fowler Ave Connection: Complete 30% design walk-through needed for Oak to Huffine
Date:Thursday, May 30, 2024 9:49:54 AM
Good morning, Mr. Carty.
We very much agree on timing.
Yesterday the city announced our invitation for the walking tour, to be held the evening of June 12th:
https://engage.bozeman.net/fowler/news_feed/fowler-walking-tour.
We’re always looking to improve our ability to reach people, so would you mind contacting me
directly if you have not received notice of this meeting by end of the week?
We’ll also be confined to public property for our tour, but I’m happy to lead those interested as far
up and down the corridor as they’d like.
-Nick
Nicholas Ross, P.E.
Director | Transportation and Engineering
City of Bozeman
From: Daniel Carty <dgc12@hotmail.com>
Sent: Thursday, May 30, 2024 9:44 AM
To: Terry Cunningham <TCunningham@BOZEMAN.NET>; Douglas Fischer
<dfischer@BOZEMAN.NET>; Nicholas Ross <nross@BOZEMAN.NET>
Cc: Bozeman Public Comment <comments@BOZEMAN.NET>
Subject: [EXTERNAL]Fowler Ave Connection: Complete 30% design walk-through needed for Oak to
Huffine
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
May 30, 2024; 9:45am
To: Mayor Terry Cunningham, Commissioner Douglas Fischer, and Director of
Transportation and Engineering Nick Ross
Subject: Fowler Ave Connection (FAC); a complete FAC 30% design walk-through is
needed
I am writing to thank the City for offering an FAC 30% design walk-through for Oak St to
Durston Rd on June 12. That said, I am also writing to say the public deserves the
opportunity for an FAC 30% design walk-through for Durston Rd to Huffine Ln before the
June 18 City Commission meeting—the meeting at which the City is scheduled to present
the FAC 60% design to the public.
If there is not time before June 18 for the City to hold a Durston Rd to Huffine Ln walk-through, then I ask the City to postpone presenting the FAC 60% design until such time as
the public has had the opportunity to do an FAC 30% design walk-through of the entirelength of the FAC from Oak St to Huffine Ln. Thank you.
Sincerely,
Daniel Carty
213 N. Third AveBozeman, MT 59715
dgc12@hotmail.com
406-548-2810
cc: comments@bozeman.net for the public record