HomeMy WebLinkAbout009-A000 Building Proposed elevationtLEVEL 1
100'-0"
21
T.O. COLUMNS
122'-0"
3
MEZZANINE
112'-3"
126'-0"
T.O WALL
MATERIAL TO MATCH EXISTING
DOOR TO BE ADDED
RETAINING WALL
150'-0"
60'-0"
CONC 1
LOADING DOCK
LEVEL 1
100'-0"
A B
T.O. COLUMNS
122'-0"
C D E F G H J K L
MEZZANINE
112'-3"
126'-0"T.O WALL MATERIAL TO MATCH EXISTING EXISTING MATERIALS
45'-0"
LOADING DOCK
FACADE
TBD
CMU
MATERIALS
CONCRETE
PERMIT SETA
1
1 2 3 4
C O R P O R A T I O NLYNN S. WOODBURY AND ASSOCIATES, ARCHITECTS2733 EAST PARLEYS WAY, SUITE 300SALT LAKE CITY, UTAH 84109 (801) 485-77705
2 3 4 5BCDC:\Users\dawson.robb-wilcox\Documents\ASG Bozeman_dawson.robb-wilcox.rvt6/20/2023 4:05:27 PMASG REAL ESTATEA200
PROJ. #: 9521.3000
DATE: 06/20/2023
DRAWN BY: ---
SCALE: As indicated3011 MAX AVEBOZEMAN, MT 59718PROPOSED
ELEVATIONSASG BOZEMAN1/8" = 1'-0"A200
C1 WEST ELEVATION
3/32" = 1'-0"A200
A1 SOUTH ELEVATION
A200
C4 PERSPECTIVE
#REVISION DESCRIPTIONDATE