Loading...
HomeMy WebLinkAbout009-A000 Building Proposed ElevationLEVEL 1 100'-0" 21 T.O. COLUMNS 122'-0" 3 MEZZANINE 112'-3" 126'-0" T.O WALL MATERIAL TO MATCH EXISTING DOOR TO BE ADDED RETAINING WALL 150'-0" 60'-0" CONC 1 LOADING DOCK RELOCATED EXISITNG LIGHT FIXTURES LEVEL 1 100'-0" A B T.O. COLUMNS 122'-0" C D E F G H J K L MEZZANINE 112'-3" 126'-0"T.O WALL MATERIAL TO MATCH EXISTING EXISTING MATERIALS 45'-0" LOADING DOCK FACADE TBDRELOCATED EXISITNG LIGHT FIXTURE CMU MATERIALS CONCRETE PERMIT SETA 1 1 2 3 4 C O R P O R A T I O NLYNN S. WOODBURY AND ASSOCIATES, ARCHITECTS2733 EAST PARLEYS WAY, SUITE 300SALT LAKE CITY, UTAH 84109 (801) 485-77705 2 3 4 5BC DC:\Users\dawson.robb-wilcox\Documents\ASG Bozeman_detached24_detached_dawson.robb-wilcox.rvt 12/12/2023 2:40:20 PMASG REAL ESTATEA200 PROJ. #: 9521.3000 DATE: 06/29/2023 DRAWN BY: --- SCALE: As indicated3011 MAX AVEBOZEMAN, MT 59718PROPOSED ELEVATIONSASG BOZEMAN1/8" = 1'-0"A200 C1 WEST ELEVATION 3/32" = 1'-0"A200 A1 SOUTH ELEVATION A200 C4 PERSPECTIVE # REVISION DESCRIPTION DATE EXISTING RELOCATED LIGHT FIXTURES