HomeMy WebLinkAbout001-C001 Cover SheetTEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL
E E E E E E E
TELTEL EEEEEEEEEE
WWWWWWWWWWWWWWWWWW
EEE
EEE
E
E
GGGGG
G
GGG
TEL
TELTELTELTEL
TEL
TEL
TEL
TEL
TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL
WW
W
WW
WWW
W
WW
W
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
GGGGGGGGGGGGGGGGGG
G
G
GF
FFF
F
FF
F EEEEEEEEEEEEEE
TEL TEL TEL TEL
EE
ETEL EEE
E E
E
E
G
G
G
TELTELTEL
TEL
TEL AL'S SPORTING GOODSLOCATED IN THE NORTHEAST ONE-QUARTER OF SECTION 35,TOWNSHIP 1 SOUTH, RANGE 5 EAST, PRINCIPLEMERIDAN MONTANA, CITY OF BOZEMAN, GALLATIN COUNTY,STATE OF MONTANALANDSCAPE ARCHITECT DEVELOPER/OWNER WOODBURY CORPORATION2733 EAST PARLEYS WAY, STE. 300SALT LAKE CITY, UTAH 84109CONTACT: JASON WEDLICKOFFICE: (801) 485-7770 CIVIL ENGINEER WOODBURY CORPORATION2733 EAST PARLEYS WAY, STE. 300SALT LAKE CITY, UTAH 84109CONTACT: LEEANN D. MILLER, P.E.OFFICE: (801) 482-7443CELL: (385) 299-6262WOODBURY CORPORATION2733 EAST PARLEYS WAY, STE. 300SALT LAKE CITY, UTAH 84109CONTACT: CODY BRAZELLOFFICE: (801) 485-7770MAX AVE. VICINITY MAP NOT TO SCALEPROJECTLOCATIONARCHITECTWOODBURY CORPORATION2733 EAST PARLEYS WAY, STE. 300SALT LAKE CITY, UTAH 84109CONTACT: JARED HUMPHRIESOFFICE: (801) 485-7770#REVISION DESCRIPTION DATE
2733 EAST PARLEYS WAY, SUITE 300
C O R P O R A T I O N
(801) 485-7770SALT LAKE CITY, UTAH 84109PROJECT #:DATE:DRAWN BY:SCALE:A B C D E F G 1234567891012345678910COVER SHEET
BOZEMAN, MONTANAC0013011 MAX AVENUE
AL'S SPORTING GOODS
9521-30006/20/2023H.C.NONECOVER SHEET6/20/2023 4:18 PMP:\ASG REAL ESTATE LLC (MONTANA) - 9521\3000 - BOZEMAN\3000 - CIVIL\Z DESIGN DRAWINGS\30X42\C001 COVER SHEET 9521-3000.DWG GENERAL CONSTRUCTION NOTES: 1.SPECIFICATIONS: ALL WORK SHALL BE DONE IN ACCORDANCE WITH BOZEMAN CITYDESIGN AND CONSTRUCTION STANDARDS. FOR AREAS NOT COVERED BY PUBLISHEDPROJECT SPECIFICATIONS OR THE BOZEMAN CITY STANDARDS AND SPECIFICATIONS,CONSTRUCTION MUST COMPLY WITH A.P.W.A. STANDARDS AND SPECIFICATIONS. THEWORK SHALL ALSO COMPLY WITH THE PROJECT PLANS, PROJECT SPECIFICATIONS, ANDPROJECT GEOTECHNICAL ENGINEERING REPORT, WHICHEVER IS THE MOST STRINGENT.2.ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE OWNERAND MONTANA CITY DIVISION. THE OWNER AND THE CITY RESERVE THE RIGHT TOACCEPT OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT DOES NOTCONFORM TO ITS STANDARDS AND SPECIFICATIONS.3.THE CONTRACTOR SHALL NOTIFY BOZEMAN CITY ENGINEERING DIVISION INSPECTIONSECTION, A MINIMUM OF 48 HOURS AND A MAXIMUM OF 96 HOURS PRIOR TO STARTINGCONSTRUCTION.4.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATIONOF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON THE RECORDS OF THEVARIOUS UTILITY COMPANIES AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THEFIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THECONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES WHETHERSHOWN OR NOT SHOWN ON THE PLANS. THIS UTILITY WORK SHALL BE INCLUDED AS PARTOF BASIC BID, FIELD RESEARCH SHALL BE DONE PRIOR TO COMPLETING A BID.5.EXISTING WATER, SANITARY, AND STORM SEWER LINES ARE SHOWN BASED ON BESTAVAILABLE INFORMATION. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFYPERTINENT LOCATIONS AND ELEVATIONS SPECIFICALLY AT CONNECTION POINTS AND ATPOTENTIAL POINTS OF CONFLICT.6.CONTRACTOR SHALL BE RESPONSIBLE FOR:6.A.OBTAINING ALL PERMITS AND LICENSES.6.B. CONTRACTOR SHALL COORDINATE TRAFFIC REROUTING REQUIRED BY THE WORK WITHMALL MANAGEMENT.6.C.COORDINATING WITH ALL UTILITY COMPANIES INVOLVED WITH REGARD TORELOCATION'S OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION TOASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH NODISRUPTION OF SERVICE.6.D.ALL PROJECT SAFETY INCLUDING BUT NOT LIMITED TO, TRENCH EXCAVATION ANDSHORING, TRAFFIC CONTROL, AND SECURITY.6.E.OBTAINING TEMPORARY POWER AND WATER TO THE SITE.6.F.PAYING ALL FEES EXCLUDING CONNECTION FEES AND SYSTEM DEVELOPMENT FEES.6.G.OBTAINING NECESSARY PERMISSION FROM OREM CITY AND UDOT (IF NEEDED) FORALL WORK IN AND ADJACENT TO THE PUBLIC RIGHT OF WAY.6.H.SETTING ALL MANHOLE COVERS, INLET GRATES, WATER VALVES, CLEAN OUTS, FIREHYDRANTS AND OTHER ACCESS COVERS TO FINISHED PAVEMENT SURFACE ORFINISHED GRADE.6.I.RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THECONSTRUCTION SITE AND SUBMITTED TO OWNER FOLLOWING CONSTRUCTION.6.J.REFER TO AND MEET THE REQUIREMENTS OF THE GEOTECHNICAL REPORT6.K.KEEPING ADJACENT STREETS FREE AND CLEAN OF ALL DEBRIS AND DIRT FROM THEJOB SITE. CONTRACTOR MUST SWEEP STREETS AS NEEDED AND UPON OWNER / CITYREQUEST.6.L.REFER TO ARCHITECTURAL PLANS FOR THE EXACT LOCATION, AND DIMENSIONS OFBUILDING EXITS, RAMPS, TRUCK DOORS, AND UTILITIES ENTRANCE LOCATIONS.6.M.VERIFYING ELEVATION AND HORIZONTAL LOCATION OF ALL UTILITY POINTS OFCONNECTION PRIOR TO ANY UTILITY INSTALLATION.6.N.OBTAINING U.P.D.E.S. PERMITS AND MONITORING ALL OF THE STORM WATERPOLLUTION PREVENTION DEVICES.6.O.STEEL PLATING OVER THOSE PORTIONS OF THE CONSTRUCTION TRENCHESREQUIRED TO MAINTAIN FUNCTIONAL TRUCK ACCESS TO THE MACY'S TRUCK DOCK,AND PEDESTRIAN ACCESS TO THE MACY'S WEST ENTRANCE, MACY'S NORTHENTRANCE, THE NORTH MALL ENTRANCE, AND ENTRANCES TO H&M AND FOREVERXXI DURING MALL OPERATING HOURS.7.CONTRACTOR SHALL INSTALL A CONSTRUCTION BARRIER AROUND & ALONG ENTIRECONSTRUCTION LIMIT LINE & SHALL DESIGNATE ONE CONSTRUCTION ENTRANCE.PROVIDE ADDITIONAL BARRIERS & CONES TO ENSURE SAFETY NEAR & AROUND ALLCUTS, TRENCHES, HOLES & PITS.8.ENSURE PROPER SIGNS INFORM VEHICULAR & PEDESTRIAN TRAFFIC OF DETOURS &HAZARDS.9.EXISTING STRUCTURES AND DEBRIS WITHIN CONSTRUCTION LIMITS ARE TOBE ABANDONED, REMOVED OR RELOCATED AS NECESSARY.9.EXISTING STRUCTURES AND DEBRIS WITH CONSTRUCTION LIMITS ARE TO BEABANDONED, REMOVED OR RELOCATED AS NECESSARY.10.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATION'S, INCLUDING BUT NOTLIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES,LANDSCAPE MATERIALS & IRRIGATION COMPONENTS ETC. AS REQUIRED. ALL WORKSHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALLBE APPROVED BY SUCH.11.ALL EXISTING LANDSCAPE DAMAGED DURING DEMOLITION SHALL BE PROMPTLYREPAIRED OR REPLACED. CONTRACTOR SHALL MANUALLY WATER ALL AREAS WHEREEXISTING IRRIGATION IS NOT FUNCTIONAL.12.IF DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICHINDICATE AN UNIDENTIFIED SITUATION IS PRESENT, THE CONTRACTOR SHALL CONTACTTHE OWNER AND ENGINEER IMMEDIATELY.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANYDRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN CONTACT THE ENGINEER FORCLARIFICATION.14.IN GENERAL, THE LIMITS OF CONSTRUCTION INCLUDE ALL FACILITIES SHOWN ASPROPOSED ON THE BUILDING AND SITE PLANS. IN ADDITION, ALL ADJACENT PUBLICIMPROVEMENTS AND PRIVATE IMPROVEMENTS MUST BE REPAIRED, RESTORED, ORCOMPLETED TO A FINAL CONDITION. THE CONTRACTOR IS RESPONSIBLE FORIDENTIFYING PRIOR TO BID ANY ITEMS ON THE SITE, AND CONNECTING PARCELS, THATWILL REQUIRE REPAIR, REMOVAL, RESTORATION, OR WORK OF ANY KIND TO COMPLETETHE PROPOSED CONSTRUCTION. THESE ITEMS SHALL BE INCLUDED IN THECONTRACTOR'S BASIC BID.15.SEE CONSTRUCTION DOCUMENTS & CONSULT DESIGN ENGINEER FOR THE EXACTLOCATIONS OF ALL PROPOSED SAW CUTS REQ'D. SOME FIELD ADJUSTMENTS MAY BEREQUIRED TO ENSURE PROPER DRAINAGE AT ASPHALT JUNCTIONS.16.ALL UTILITY INTERRUPTIONS REQUIRED TO MAKE CONNECTIONS MUST OCCUR AFTERMALL HOURS OR ON SUNDAY. MALL MANAGEMENT SHALL BE GIVEN 48 HOURS NOTICEOF ANY SHUT DOWN TO GIVE THEM TIME TO NOTIFY AFFECTED TENANTS.06/20/2023ea)0"%fr*,