HomeMy WebLinkAbout012-Geotechnical Addendum Letter for Bob Wards Addition May 2023Civil Engineering ● Geotechnical Engineering ● Land Surveying ● Construction Services ALLIED ENGINEERING
32 Discovery Dr. Bozeman, MT 59718 Ph: (406) 582-0221
www.alliedengineering.com
May 9, 2023
Woodbury Corporation
2733 East Parleys Way, Suite 300
Salt Lake City, UT 84109-1662
Attention: Davin McNeil
Email: d_mcNeil@woodburycorp.com
RE: Geotechnical Addendum Letter - Proposed Addition to Bob Wards
Bozeman, Montana
To Whom It May Concern:
Per our signed contract dated April 27, 2023, this letter is our addendum to the Geotechnical Report for
Gallatin Center (which Bob Wards is part of) dated October 10, 1999. The original geotechnical report is
attached to this letter. Where needed, we have provided additional thoughts/recommendations and
modifications to the original report within this letter.
We understand the intent is to construct an addition to the west side of Bob Wards. The addition will
measure just under 5,000 square feet. We anticipate a slab-on-grade construction with perimeter frost
walls/footings and interior spread footings directly under the slab. The structural connection to the
existing store is unknown. However, we anticipate the continuation of the existing east-west running
perimeter walls/footings. We are unsure if an additional wall/footing is proposed running north-south
directly adjacent to the west wall of the existing building. Some thoughts regarding the connection points
are provided below.
Previous Geotechnical Work
The nearest geotechnical exploration to the addition completed back in 1999 (TP-3) encountered about
two feet of random fill overlying silty clay topsoil and medium stiff, brown clay. Native dense alluvial
gravel suitable for foundation bearing was found at about 4.5 feet. The test pit was dry to the bottom of
the exploration at 5.5 feet.
Note that we found groundwater in several other explorations completed in 1999 with the shallowest at
about 5 to 6 feet. These levels may reach 3 to 4 feet during the run-off in the spring/early summer.
Depending on the time of year, some groundwater dewatering may be required to install the structural
fill under the addition (discussed below) and/or the installation of the re-routed water, sewer, and storm
sewer facilities.
Geotechnical Addendum Letter - Proposed Addition to Bob Wards
Bozeman, Montana Project Number: 23-050
May 9, 2023
Bozeman Office: 32 Discovery Drive. Bozeman, Montana 59718. ● Ph: (406) 582-0221 ● Fax: (406) 582-5770
Page 2
Additional Foundation Recommendations
In our original geotechnical report, we had recommended the removal of all overlying random fill, topsoil,
and clay under footings. Suitable foundation bearing was either directly in the native gravels or structural
fill bearing on the native gravels.
While we were not involved in the construction inspection of the original Bob Wards building, we
understand the adjacent Target was mass over-excavated within the footprint of the store down to the
native gravels and backfilled with compacted granular structural fill. In addition, the nearby Ross store
(which we did inspect) was mass excavated to the native gravels and backfilled with granular structural
fill. While we do not have any specific information regarding Bob Wards, we suspect this building was
also mass excavated to the native gravels. At a minimum, the existing footings should sit either directly
in the native gravels or on compacted structural fill bearing on the native gravels.
Given the small size of the addition and the likelihood of interior spread footings directly under the slab,
we recommend the mass excavation of all random fill, old wall backfill (from the original construction)
topsoil, and lean clay down to the native gravels. The excavation should be backfilled in thin lifts back up
to footing grade with granular structural fill compacted to 98 percent of its Standard Proctor density based
on ASTM D-698. Note in the 1999 report, we had recommended compaction to 97 percent of the
Standard Proctor density. Design foundation bearing pressures provided in the original report are still
suitable. The excavation should extend a minimum of three feet outside the outside edge of perimeter
footings.
The connection to the existing footings is perhaps the most complex portion of the design/construction
of the addition. Based on our nearby exploration (TP-3), we anticipate the native gravels are found below
the elevation of the existing footings and structural fill was used in the original construction to bring the
subgrade up from the native gravels to the design level of the footings. Therefore, if the addition is mass-
excavated, we may risk undermining the existing footings along the west wall of the store. This may be
especially problematic if an additional footing line will be run north-south directly adjacent the existing
west wall/footing.
Generally, we suggest maintaining a 1H:1V excavation line from the edge of existing footings down to the
native gravels to limit the potential for undermining. Structural connections may be made to the existing
foundation via thickened walls and grade beams designed to span this gap. If the new footings lines are
to be constructed within this excavation zone, we suggest underpinning of the existing west wall footing
to limit the potential for undermining. This may be done via closely properly designed helical piles,
grouted micropiles, etc. Note that the underpinning should be close enough to limit soil spillage from
between the underpinned locations. Any soil loss from under existing footings between underpinned
locations runs the risk of impacting the performance of the interior slab of the existing store. Further, we
suggest spacing the underpinning locations sufficiently close to one another so that the existing footings
can span between them even if there is a loss of soil support from under the foundation.
Granular Structural Fill
One modification from the original report are the granular structural fill types that may be used. Two
available options include:
Geotechnical Addendum Letter - Proposed Addition to Bob Wards
Bozeman, Montana Project Number: 23-050
May 9, 2023
Bozeman Office: 32 Discovery Drive. Bozeman, Montana 59718. ● Ph: (406) 582-0221 ● Fax: (406) 582-5770
Page 3
• Sandy (Pitrun) Gravel - Sandy (pitrun) gravel is a granular structural fill option for placement
under and/or behind footings, slabs, and walls. This material shall be a non-plastic, well-graded
mixture of clean sand and gravel with 100 percent of its fragments passing a 4-inch screen and
less than 10 percent of its particles (by weight) finer than the No. 200 sieve. In addition to these
material and gradation recommendations, it should meet all other applicable specifications as
presented in Section 02234 of the Montana Public Works Standard Specifications (MPWSS) for
uncrushed sub-base course gravel.
• Crushed (Road Mix) Gravel - Crushed (road mix) gravel is another granular structural fill option
for placement under and/or behind footings, slabs, and walls. This material shall be a non-plastic,
well-graded mixture of clean sand and gravel that is processed (crushed) such that 100 percent of
its fragments pass a 1-1/2-inch screen and less than 10 percent of its particles (by weight) are
finer than the No. 200 sieve. It should also meet all other specifications as presented in Section
02235 of the MPWSS for crushed base course gravel.
Seismic Design Factors
Based on our on-site explorations and knowledge of the area’s geology, the project site class is Site Class
D as found in the 2021 IBC. Note that this is not the Default Site Class D.
To obtain site-specific seismic loading and response spectrum parameters, a web-based application from
the USGS Earthquake Hazards Program can be used. The link to their web page is as follows:
https://earthquake.usgs.gov/hazards/designmaps/. This web page has links to three third-party interfaces
that can be used to obtain seismic information. The user needs to enter the design code reference
document, site soil classification, risk category, and site latitude and longitude.
Subsurface Drainage
Assuming the interior slab elevation is higher than the final exterior grade at all locations, and a slab-on-
grade foundation with perimeters walls and footings is designed, subsurface drains may be eliminated.
Pavement Section Recommendations
Two modifications for the design pavement section are provided below depending on the application.
Note that these options differ slightly from the options provided in the original report.
Table 1: Pavement Section 1 - Light-Duty Streets and Parking Areas
MATERIAL COMPACTED THICKNESS (IN)
Asphalt 3 (placed in 1 lift)
Base Course Gravel 6
Sub-Base Course Gravel 15
TOTAL SECTION DESIGN THICKNESS 24
Geotechnical Addendum Letter - Proposed Addition to Bob Wards
Bozeman, Montana Project Number: 23-050
May 9, 2023
Bozeman Office: 32 Discovery Drive. Bozeman, Montana 59718. ● Ph: (406) 582-0221 ● Fax: (406) 582-5770
Page 4
Table 2: Pavement Section 2 - Heavy Truck Traffic Areas
MATERIAL COMPACTED THICKNESS (IN)
Asphalt 4 (placed in 2 lifts)
Base Course Gravel 6
Sub-Base Course Gravel 18
TOTAL SECTION DESIGN THICKNESS 28
The sub-base and base course materials that comprise the granular parts of the pavement section shall
consist of 4-inch minus uncrushed sandy (pit run) gravel and 1-1/2-inch minus crushed (road mix) gravel,
respectively. Both gravel courses shall meet the material and gradation specifications presented in
MPWSS, Sections 02234 and 02235. Under normal circumstances, the gravel products should be placed
in lifts not exceeding 10 inches in thickness (depending on the size of the compactor) and compacted to
at least 95 percent of the maximum dry density as defined in ASTM D-698.
If widespread unstable subgrade conditions are encountered, we ask that we be retained to view the
subgrade. At that point, we may consider increasing the subbase section or adding a woven geotextile
fabric (Mirafi 600X or equivalent) for subgrade stabilization. If highly unstable subgrade conditions are
encountered, we may consider adding a geogrid (Tensar TX-190L) for subgrade improvement. Both
pavement sections listed above assume that the subgrade is stable and shows no signs of rutting or
deflection prior to placing the subbase gravel.
AESI FUTURE INVOLVEMENT
We suggest that we be retained during the design and construction of the addition to Bob Wards to assure
that the recommendations provided herein are followed properly. We further suggest that we be allowed
to view the foundation excavation to ensure that the appropriate target bearing materials have been
reached prior to the placement of structural fill.
LIMITATIONS
This report provides our geotechnical recommendations for the proposed addition to Bob Wards located
in Bozeman, Montana. These recommendations are based on our previous observation and evaluation of
the site’s surface and subsurface conditions back in 1999, our review and interpretation of available
geologic information, and our previous geotechnical engineering experience in the project area. If during
earthwork construction, soil and groundwater conditions are found to be inconsistent with those
described in the original report or this addendum, we should be advised immediately such that we can
analyze the situation and modify our recommendations if need be. Please be advised that the original
report and addendum are only applicable for the above-referenced project and shall not be used for any
other nearby sites. Since geotechnical-related conditions can change in a short distance, we recommend
that all properties be evaluated on a site-specific basis.
All individuals associated with this project should consult this report during the planning, design, and
construction of the site improvements. It should be made available to other parties for information on
factual data only and not as a warranty of actual subsurface conditions such as those interpreted herein.
Geotechnical Addendum Letter - Proposed Addition to Bob Wards
Bozeman, Montana Project Number: 23-050
May 9, 2023
Bozeman Office: 32 Discovery Drive. Bozeman, Montana 59718. ● Ph: (406) 582-0221 ● Fax: (406) 582-5770 Page 5
We appreciate the opportunity to perform our geotechnical services. Please call if you have questions.
Sincerely,
Allied Engineering Services, Inc.
Craig R. Madson, PE
President / Principal Geotechnical Engineer
enc: 1999 Geotechnical Report for Gallatin Center
Limitations of Your Geotechnical Report
qa/qc: ES
P:\2023\23-050 Bob Wards Addition\05 Design\Geotech\Geotechnical Addendum Letter for Bob Wards Addition May 2023.docx
LIMITATIONS OF YOUR GEOTECHNICAL REPORT
GEOTECHNICAL REPORTS ARE PROJECT AND CLIENT SPECIFIC
Geotechnical investigations, analyses, and recommendations are project and client specific. Each project
and each client have individual criterion for risk, purpose, and cost of evaluation that are considered in
the development of scope of geotechnical investigations, analyses and recommendations. For example,
slight changes to building types or use may alter the applicability of a particular foundation type, as can a
particular client’s aversion or acceptance of risk. Also, additional risk is often created by scope‐of service
limitations imposed by the client and a report prepared for a particular client (say a construction
contractor) may not be applicable or adequate for another client (say an architect, owner, or developer
for example), and vice‐versa. No one should apply a geotechnical report for any purpose other than that
originally contemplated without first conferring with the consulting geotechnical engineer. Geotechnical
reports should be made available to contractors and professionals for information on factual data only
and not as a warranty of subsurface conditions, such as those interpreted in the exploration logs and
discussed in the report.
GEOTECHNICAL CONDITIONS CAN CHANGE
Geotechnical conditions may be affected as a result of natural processes or human activity. Geotechnical
reports are based on conditions that existed at the time of subsurface exploration. Construction
operations such as cuts, fills, or drains in the vicinity of the site and natural events such as floods,
earthquakes, or groundwater fluctuations may affect subsurface conditions and, thus, the continuing
adequacy of a geotechnical report.
GEOTECHNICAL ENGINEERING IS NOT AN EXACT SCIENCE
The site exploration and sampling process interprets subsurface conditions using drill action, soil sampling,
resistance to excavation, and other subjective observations at discrete points on the surface and in the
subsurface. The data is then interpreted by the engineer, who applies professional judgment to render
an opinion about over‐all subsurface conditions. Actual conditions in areas not sampled or observed may
differ from those predicted in your report. Retaining your consultant to advise you during the design
process, review plans and specifications, and then to observe subsurface construction operations can
minimize the risks associated with the uncertainties associated with such interpretations. The conclusions
described in your geotechnical report are preliminary because they must be based on the assumption that
conditions revealed through selective exploration and sampling are indicative of actual
Allied Engineering Services, Inc. ● 32 Discovery Drive. Bozeman, Montana 59718 ● Ph: (406) 582‐0221 Page 2
conditions throughout a site. A more complete view of subsurface conditions is often revealed during
earthwork; therefore, you should retain your consultant to observe earthwork to confirm conditions
and/or to provide revised recommendations if necessary. Allied Engineering cannot assume responsibility
or liability for the adequacy of the report’s recommendations if another party is retained to observe
construction.
EXPLORATIONS LOGS SHOULD NOT BE SEPARATED FROM THE REPORT
Final explorations logs developed by the consultant are based upon interpretation of field logs (assembled
by site personnel), field test results, and laboratory and/or office evaluation of field samples and data.
Only final exploration logs and data are customarily included in geotechnical reports. These final logs
should not be redrawn for inclusion in Architectural or other design drawings, because drafters may
commit errors or omissions in the transfer process.
To reduce the likelihood of exploration log misinterpretation, contractors should be given ready access to
the complete geotechnical report and should be advised of its limitations and purpose. While a contractor
may gain important knowledge from a report prepared for another party, the contractor should discuss
the report with Allied Engineering and perform the additional or alternative work believed necessary to
obtain the data specifically appropriate for construction cost estimating purposes.
OWNERSHIP OF RISK AND STANDARD OF CARE
Because geotechnical engineering is much less exact than other design disciplines, there is more risk
associated with geotechnical parameters than with most other design issues. Given the hidden and
variable character of natural soils and geologic hazards, this risk is impossible to eliminate with any
amount of study and exploration. Appropriate geotechnical exploration, analysis, and recommendations
can identify and reduce these risks. However, assuming an appropriate geotechnical evaluation, the
remaining risk of unknown soil conditions and other geo‐hazards typically belongs to the owner of a
project unless specifically transferred to another party such as a contractor, insurance company, or
engineer. The geotechnical engineer’s duty is to provide professional services in accordance with their
stated scope and consistent with the standard of practice at the present time and in the subject geographic
area. It is not to provide insurance against geo‐hazards or unanticipated soil conditions.
The conclusions and recommendations expressed in this report are opinions based our professional
judgment and the project parameters as relayed by the client. The conclusions and recommendations
assume that site conditions are not substantially different than those exposed by the explorations. If
during construction, subsurface conditions different from those encountered in the explorations are
observed or appear to be present, Allied Engineering should be advised at once such that we may review
those conditions and reconsider our recommendations where necessary.
RETENTION OF SOIL SAMPLES
Allied Engineering will typically retain soil samples for one month after issuing the geotechnical report. If
you would like to hold the samples for a longer period of time, you should make specific arrangements to
have the samples held longer or arrange to take charge of the samples yourself.