Loading...
HomeMy WebLinkAbout32 Comment 25 and 32 Response Letter HBP 20 North Tracy Avenue Bozeman,Montana 59715 HomeBasePartners.com HOMEBASE;'ARTNERS 406,404.1788 1/31/2024 Sarah Rosenburg, AICP Associate Planner I Historic Preservation Officer City of Bozeman LGBTQ+ Liaison RE: The Guthrie—Project#23354 SP/DEM/CCOA Comments#25 and#32 Dear Sarah, In response to your review comments#25 and #32 on The Guthrie SP/DEM/CCOA application we'd like to offer the following summary and financial analysis. I've included the comments below for reference along with our responses. Comment#25 The existing structure is contributing historic structure in a very intact Postwar phase of Bozeman's development that could be eligible to become a Historic District. Based on the historic inventory survey of the B-2M zone district, North 5th and 6th between Peach and Beall could be designated a Historic District. This structure is a prominent architectural feature of the Postwar era in the Violet and Karp subdivisions. Reconsider doing an adaptive reuse development for this, especially since the renovation study shows that there could be a number of units accommodated. Another consideration would be to do this as a PDZ and use Affordable Housing and Historic Structures as outlined in 38.430.050. Relaxations and waivers can be requested. As you maybe aware when we purchased this building we fully intended on doing an adaptive reuse development project. We spent close to a year working with our design team as well as City of Bozeman Community Development, Building and Fire Departments in an attempt to make a renovation work. Unfortunately, at every turn we ran into roadblocks related to significant upgrades to the structure, MEP and life safety systems required to comply with current code. During our evaluation/design process we engaged Arco Murray as a General Contractor to provide cost information and suggest creative solutions to make the project economically viable. After a thorough attempt to make the numbers work we eventually had to pivot and pursue a different solution. We maintained our commitment to providing a lower cost housing option for the community and are now able to offer 111 units in the new build project opposed to only 42 in the renovation project. HBP 20 North Tracy Avenue Bozeman,Montana 59715 HomeBasePartners.com HOMEBASE PARTNERS 406.404,1788 Comment#32 38.340.090.C. Provide how the structure has no viable economic life remaining. We need to see that bringing the structure to a habitable condition exceeds the cost of demolition and redevelopment to minimum standards. This should be some sort of document that shows numbers and dollar amount. We have included budgets, proformas, and financial analyses which provide clear evidence of why pursuing a renovation of the existing building is not feasible. In the renovation analysis you can see that based on the construction and operational costs the project would not even be able to cover debt service. Neither we, nor any bank, would undertake a project with these projections. In addition, the renovated option does not solve the challenge of providing functional housing, including areas with less than 7' ceilings, awkward bathroom conditions and grade changes within the building due to the phasing and age of each portion as it was constructed over the years. Please feel free to reach out with any questions or comments. Sincerely, Andy Holloran