HomeMy WebLinkAbout037 - T12 SITE LIGHTING PLAN1T.12SITE LIGHTING PLAN2215 WHEAT DRIVEBOZEMAN, MT 59715ECHO SUITESPROJECT NARRATIVE
continued...
SITE LIGHTING PLAN
1" = 40'-0"
INTENSITY FALLS OFF TO <.3 FC BY 60' FROM BUILDING
-WELL BEFORE EXTENT OF LOT
BLDG. ENTRANCEBLDG. ENTRANCE
BLDG.
ENTRANCE
BLDG.
ENTRANCE
ADJACENT NON-CITY OF BOZEMAN
RESIDENTIAL / AG USAGE
ADJACENT TRAIL EASEMENTTable 38.570.040-1:
Security lighting standards.
38.570.040.A.T1 Parking Lot Lighting
Average 5.0 maintained
footcandles.
38.570.040.B Bldg. Ent. Lighting
38.570.040.B
38.570.040.B
040.G.2. Lighting fixtures
are shielded such that no
light is emitted above a
horizontal plan passing
through the lowest point of
the light emitting element.
040.G.4. Glare control is
achieved through the use of
full cutoff fixtures. See: Site
Lighting Specs
060.A.1-4. Site lighting is in
compliance.
38.570.040.G.2-4 Cutoff Lighting
Footcandles at the property
line do not exceed 0.3 to
adjacent properties.
38.570.040.G.5 Property Line
38.570.060.A.1-4
PERIMETER SITE / PARKING LIGHTING, TYP.
-WALL MOUNTED FIXTURES
-REF: SITE LIGHTING SPECS
23100 North Park Wyndham SP Review (003)
Thu Jan 11, 2024