Loading...
HomeMy WebLinkAbout035 - T10 TRANSPARENCY STUDYEAST ELEVATION: FACADE AREA -11,484 ft^2 TRANSPARENT/GLAZED AREA -1,728 ft^2 NON-TRANSPARENT AREA -9,756 ft^2 TRANSPARENT PERCENTAGE -15.01% SOUTH ELEVATION: FACADE AREA -2,343 ft^2 TRANSPARENT/GLAZED AREA -267 ft^2 NON-TRANSPARENT AREA -2,077 ft^2 TRANSPARENT PERCENTAGE -12.86% 61 COB SP #23100 WINDOWS ADDED WEST ELEVATION: FACADE AREA -10,888 ft^2 TRANSPARENT/GLAZED AREA -1,364 ft^2 NON-TRANSPARENT AREA -9,264 ft^2 TRANSPARENT PERCENTAGE -12.5% NORTH ELEVATION: FACADE AREA -2,404 ft^2 TRANSPARENT/GLAZED AREA -140 ft^2 NON-TRANSPARENT AREA -2,251 ft^2 TRANSPARENT PERCENTAGE -5.8% 61 COB SP #23100 WINDOWS ADDED 1T.10FACADE TRANSPARENCYSTUDY2215 WHEAT DR.BOZEMAN, MT 59715PROJECT ECHO1" = 30'-0" ELEV. - EAST - FRONT - WHEAT DRIVE 1" = 30'-0" EXT. ELEV. - SOUTH - MANDEVILLE 1" = 30'-0" EXT. ELEV. - WEST - REAR 1" = 30'-0" EXT. ELEV. - NORTH - TRAIL PROJECT NARRATIVE continued... TOTAL GLAZING PERCENTAGES: TOTAL FACADE AREA -26,858 ft^2 TOTAL TRANSPARENT/GLAZED AREA -3,499 ft^2 TOTAL NON-TRANSPARENT AREA -23,359 ft^2 TRANSPARENT PERCENTAGE -13.02% 1T.10FACADE TRANSPARENCYSTUDY2215 WHEAT DR.BOZEMAN, MT 59715PROJECT ECHOFacade Glazing 23100 North Park Wyndham SP Review (003) Thu Jan 11, 2024