Loading...
HomeMy WebLinkAbout034 - LANDSCAPE DETAILS& ENGINEERS PLANNERS SURVEYORS DESIGNER DRAWN CHECKED PROJ. NO. DATE SURVEYED DESCRIPTIONDATEREVISION SHEET OF 1/9/24 13:22 BEN.SMAIL F:\7348 NORTH PARK WYNDHAM HOTEL SITE PLAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\L01 - LANDSCAPE PLAN.DWG;2221 --- DJ&A, P.C. 01/16/2024 7348 CB AH AH LANDSCAPE DETAILS BOZEMAN, MT PROJECT ECHO NORTH PARK WYNDHAM HOTEL B 21 SCALE NTS SHRUB PLANTING NOTES: 1.REMOVE BURLAP, TWINE, ROPE AND BASKET FROM TOP AND SIDES OF ROOT BALL OR CAREFULLY REMOVE CONTAINER. 2.IMPORTANT : ROOT FLARE ZONE MAY BE BELOW TOP OF BURLAPPED ROOT BALL. REMOVE ROOT BALL SOIL DOWN TO ROOT FLARE ZONE. SET ROOT FLARE ZONE AT FINISH GRADE BACKFILL WITH APPROVED TOPSOIL/PLANTING MEDIUM, (REMOVE ALL DEBRIS) 3" HIGH TOPSOIL SAUCER FOR INDIVIDUAL PLANTS REFER TO PLANS FOR FINISH GRADE SLOPE & SCARIFY SIDES OF PLANTING HOLE SET ROOT BALL ON UNDISTURBED SOIL "CONE" AT BOTTOM OF PIT12"MIN6"ROOT BALL, PROTECT DURING PLANTING WIDTH OF PIT TO BE TWO TIMES ROOT BALL DIA. FOR SHRUB LOCATION, SEE PLANTING PLAN PROVIDE A 2-3" GRADE A CYPRESS MULCH RING AROUND THE BASE OF THE SHRUB 12" MIN. PLANTING TOPSOIL MIX BREAK 6" SUB-SOIL UNDISTURBED SOIL 1-3" ROCK MULCH MULCH 1" FROM TOP OF CURB 60° TIE NYLON STRAPPING AROUND TRUNK AS SHOWN. SECURE TO POSTS WITH 1/2" WIDE NYLON STRAPPING. TREE STAKES (2 PER TREE) 2i"Ø X 7' TREATED POSTS OR 7' STEEL STUDDED 'T' POSTS. AVOID DAMAGING THE ROOTBALL. PRUNE BRANCHES, IF BROKEN OR DAMAGED PLANT TREES AT THE SAME GROUND LEVEL THAT THEY WERE GROWN IN THE NURSERY (GRAFT LOCATED HERE FOR ROOTSTOCK) 3" DEEP GRADE A CYPRESS MULCH, INSTALL TO 6" OF TRUNK. REMOVE TOP 1/3 OF BURLAP AND ALL TWINE, ROPE AND BASKET FROM ROOTBALL. FINISH GRADE BACKFILL WITH APPROVED TOPSOIL, (REMOVE ALL DEBRIS) SLOPE & SCARIFY SIDES OF PLANTING HOLE BREAK 6" SUB-SOIL PLANTING PIT SHALL BE 2X WIDTH OF ROOTBALL MIN. NOTE: 1.REMOVE ANY GUY WIRE AFTER ONE YEAR SET ROOT BALL ON UNDISTURBED SOIL "CONE" AT BOTTOM OF PITROOTBALL + 3"WATER RETAINING BERM INSTALL AT EDGE OF PLANTING PIT. A 21 SCALE NTS DECIDUOUS TREE PLANTING D 21 SCALE NTS EVERGREEN TREE PLANTING NOTES: 1.WIRE BASKETS WILL BE REMOVED COMPLETELY PRIOR TO COMPLETION OF BACKFILLING. 2.CUT AND REMOVE BURLAP FROM ROOTBALL. REMOVE ALL TWINE AND PLASTIC. IF TREE IS IN FIBER POT, REMOVE PRIOR TO PLANTING. 3.ANY BROKEN OR CRUMBLING ROOTBALLS WILL BE REJECTED. REMOVING THE WIRE WILL NOT BE AN EXCUSE FOR DAMAGED ROOTBALLS. 4.STAKE ALL TREES. 5.DO NOT CUT OR DAMAGE LEADER. PRUNE DAMAGED WOOD IMMEDIATELY PRIOR TO PLANTING. REMOVE GUY WIRE AFTER ONE GROWING SEASON. PROTECTION CAPS ON ALL POSTS. 12 GAUGE GALVANIZED WIRE. DOUBLE STRAND, TWISTED WITH FLAGGING. 6' STEEL T-POST 4' EXPOSED, MIN. 3 PER TREE SET ROOTBALL 1" HIGHER THAN FINISH GRADE. APPLY GRADE-A CYPRESS MULCH 3" DEEP FINISH GRADE STAKE TO EXTEND 24" INTO UNDISTURBED SOIL UNDISTURBED SUBGRADE BACKFILL WITH APPROVED TOPSOIL/PLANTING MEDIUM, (REMOVE ALL DEBRIS) HOLE SHOULD HAVE ROUGHENED SIDES E ----SCALE NTS LANDSCAPE EDGING DETAIL C ----SCALE NTS LANDSCAPE BOULDER TYPICAL DETAIL BOULDER NOTES: 1.CARE SHOULD BE TAKEN NOT TO DAMAGE EXPOSED SURFACES OF BOULDERS. 3.BOULDERS SHALL BE FIRMLY ANCHORED IN PLANTING BED, LEVEL, AND FREE OF SHARP EDGES. 4.REFER TO PLANS FOR BOULDER LOCATIONS. 5.FINAL BOULDER PLACEMENT LOCATIONS MAY BE ADJUSTED IN THE FIELD BY THE OWNER. BOULDER 2'-4' DIA. PLAN SECTION SURE-LOC ALUMINUM EDGING (3/16" X 6") OR APPROVED EQUAL FLAT STEEL STAKE, 15" LENGTH AT 4' O.C. MINIMUM SPACING FINISH GRADE FOR LANDSCAPE AREAS 1" MIN. BELOW TOP OF EDGING 3"4' O.C.MIN 12" OVERLAP WITH LANDSCAPE FABRIC PROVIDE MIN. 3" DEEP RIVER ROCK IN PLANTING BEDS FINISH GRADE FOR TURF AREAS 1" BELOW TOP OF EDGING BURY BOTTOM1/3 OF BOULDERNYLON STRAPS WOVEN GEO-TEXTILE LANDSCAPE FABRIC SAND UNDER FABRIC