HomeMy WebLinkAbout029 - Civil Details&
ENGINEERS
PLANNERS
SURVEYORS
DESIGNER
DRAWN
CHECKED
PROJ. NO.
DATE
SURVEYED
DESCRIPTIONDATEREVISION SHEET
OF
1/10/24 13:02 KYLE.DRUYVESTEIN F:\7348 NORTH PARK WYNDHAM HOTEL SITE PLAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\09 - CIVIL CONSTRUCTION DETAILS.DWG;2216
---
DJ&A, P.C.
01/16/2024
7348
MR
BZ
BZ
ADS STORMTECH CHAMBER SYSTEM DESIGN
CIVIL CONSTRUCTION DETAILS
BOZEMAN, MT
PROJECT ECHO
NORTH PARK WYNDHAM HOTEL
1.ADS CHAMBER INLET INVERT EL
= 4714.26
2.OVEREXCAVATE TO
WELL-GRADED GRAVEL
STRATUM, ESTIMATED
ELEVATION 4714.14'. FILL WITH
DRAIN ROCK TO ADS CHAMBER
SYSTEM, MIN DRAINAGE
INTERFACE AREA OF 500SF.
1.
2.