Loading...
HomeMy WebLinkAbout028 - Civil Details& ENGINEERS PLANNERS SURVEYORS DESIGNER DRAWN CHECKED PROJ. NO. DATE SURVEYED DESCRIPTIONDATEREVISION SHEET OF 1/10/24 13:02 KYLE.DRUYVESTEIN F:\7348 NORTH PARK WYNDHAM HOTEL SITE PLAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\09 - CIVIL CONSTRUCTION DETAILS.DWG;2215 --- DJ&A, P.C. 01/16/2024 7348 MR BZ BZ CIVIL CONSTRUCTION DETAILS BOZEMAN, MT PROJECT ECHO NORTH PARK WYNDHAM HOTEL N NPSSROF E OI NOM AT A AL E EEN G INRMICHAEL T. RUSSELL No. 59647PE8"13"3"CLR.SLAB REINF. #4 @ 12" OC. EACH WAY PROVIDE 15" STAGGERED SPLICE #4 BARS NOTE: REINFORCE AND PLACE JOINTS PER SPECIFICATION & JOINT DETAIL CONTRACTOR TO REVIEW AND FOLLOW GEOTECH REPORT.6"3"ASPHALT CONCRETE PAVEMENT CRUSHED BASE COURSE, 6" COMPACTED DEPTH, COMPACTED TO 95% PROCTOR DENSITY, REFER TO GEOTECH REPORT 12"CRUSHED SUB-BASE, 12" COMPACTED DEPTH, COMPACTED TO 95% PROCTOR DENSITY, REFER TO GEOTECH REPORT WOVEN GEOTEXTILE SEPARATION FABRIC (MIRAFI HP570 OR EQUIVALENT) A 15 CONCRETE PAVEMENT SECTION N.T.S. B 15 ASPHALT PAVEMENT SECTION N.T.S. C 15 STORM SEWER MANHOLE DETAIL N.T.S. WOVEN GEOTEXTILE SEPARATION FABRIC (MIRAFI HP570 OR EQUIVALENT) CONCRETE PAVEMENT BASE COURSE AGGREGATE, 13" MIN. COMPACTED DEPTH 8" MIN. COMPACTED SUBGRADE 29 34"18 12"25 34"1" 6"22 78"18"42 12" 40" 46 12" 35 18" NEENAH FOUNDRY R-3382 CONCAVE INLET & FRAME OR APPROVED EQUAL D 15 VALLEY GUTTER MANHOLE LID DETAIL N.T.S. NOTE: WHERE PLAN DICTATES A STORM MANHOLE WITHIN A VALLEY GUTTER, USE THE VALLEY GUTTER INLET LID DETAIL RATHER THAN A ROUND LID.