Loading...
HomeMy WebLinkAbout014 - Erosion Control PlanOHP OHP OHP OHP OHP OHP OHP OHP OHP OHT OHT OHT OHT OHT OHT OHT OHT OHT UGP UGP UGP UGP UGP FO OHTV OHTV FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO NG NG NG NG NG NG NG ASPHALTUGP ~ * * * * * * * * >>>>>>>>>>>>>>>>>>>> >> >>> >>>>>>>>>>>>>>>>>>> >> >>>>>>>>>>>>>>>>>TSEMEMEEMHSEWWVWVWVWVDYHEEEWVWVTGWMGRAVEL47234724472547264727 47274726 472547 2 5 4725 47 2 5 472 4 4723 4722 472447264727 47274728472847284726472747264727SW 12''S W 1 2 ' 'SWSWSWSWSW 12''SW 12''SW 12'' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 47244726 472647254724 >>>>>>>>>>>>>>>& ENGINEERS PLANNERS SURVEYORS DESIGNER DRAWN CHECKED PROJ. NO. DATE SURVEYED DESCRIPTIONDATEREVISION SHEET OF 2/26/24 12:17 BRYANA.ZUIDERWEG F:\7348 NORTH PARK WYNDHAM HOTEL SITE PLAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\08 - EROSION CONTROL PLAN.DWG;228 --- DJ&A, P.C. 01/16/2024 7348 MR BZ BZ CONSTRUCTION MANAGEMENT PLAN EROSION CONTROL AND BOZEMAN, MT PROJECT ECHO NORTH PARK WYNDHAM HOTEL NSCALE IN FEET 0 20 40 EROSION CONTROL AND CONSTRUCTION MGMT NOTES 1. AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ONSITE EROSION DUE TO WIND AND RUNOFF. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING EROSION CONTROL FACILITIES SHOWN. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING DRAINAGE AND EROSION CONTROL FACILITIES AS REQUIRED. STREETS SHALL BE KEPT CLEAN OF DEBRIS FROM SITE TRAFFIC. 3. EROSION CONTROL STRUCTURES BELOW SODDED AREAS MAY BE REMOVED ONCE SOD AND FINAL LANDSCAPING IS IN PLACE. EROSION CONTROL STRUCTURES BELOW SEEDED AREAS MUST REMAIN IN PLACE UNTIL THE ENTIRE AREA HAS ESTABLISHED A MATURE COVERING OF HEALTHY VEGETATION (70% MIN.). EROSION CONTROL STRUCTURES IN PAVED AREAS SHALL REMAIN IN PLACE UNTIL PAVING IS COMPLETE, & LANDSCAPE DRAINING ON TO PAVEMENT IS COMPLETE. 4. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO UNFORESEEN PROBLEMS OR IF THE PLAN DOES NOT FUNCTION AS INTENDED. A REPRESENTATIVE OF THE CITY OR COUNTY PUBLIC WORKS DEPARTMENT MAY REQUIRE ADDITIONAL CONTROL DEVICES UPON INSPECTION OF PROPOSED FACILITIES. 5. CONTRACTOR SHALL USE VEHICLE TRACKING CONTROL AT ALL LOCATIONS WHERE VEHICLES WILL ENTER/ EXIT THE SITE. CONTROL FACILITIES WILL BE MAINTAINED WHILE CONSTRUCTION IS IN PROGRESS, MOVED WHEN NECESSARY, AND REMOVED WHEN THE WORK IS COMPLETED. 6. THE DEVELOPER MUST OBTAIN A MONTANA POLLUTANT DISCHARGE ELIMINATION SYSTEM (MPDES) OR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR THE OVERALL DEVELOPMENT SITE. CONTRACTOR MUST OBTAIN A COPY OF THE PERMIT AND COMPLY WITH ALL REQUIREMENTS SPECIFIC TO THE SUBJECT PROPERTY CONSTRUCTION AREA, INCLUDING ALL NECESSARY INSPECTIONS AND MAINTENANCE ACTIVITIES. 7. IF UTILITY TRENCH DEWATERING IS NEEDED, CONTRACTOR MUST OBTAIN PERMITS. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL SWPPP SYSTEMS. CITY INSPECTOR MUST APPROVE THE REMOVAL OF ALL SWPPP DEVICES. 9. ALL SWPPP DRAINAGE SYSTEMS USING A GEOTECHNICAL FABRIC FOR INLET GRATE PROTECTION MUST HAVE FABRIC REGULARLY CLEANED (14 DAY INTERVAL MAX, MORE FREQUENTLY IF NEEDED) TO INSURE THAT SILT DOES NOT FORM IMPERMEABLE BARRIER OVER INLET. 10.THE CONTRACTOR IS TO PROVIDE NOI, AS WELL AS COMPLETED SWPPP APPLICATION PER STATE OF MONTANA DEQ TEMPLATE, AS WELL AS ALL OTHER NECESSARY PERMITS PRIOR TO CONSTRUCTION. 11.LOCATION OF SOLID WASTE DUMPSTER, PORTABLE RESTROOM AND CONCRETE WASHOUT AREA MAY CHANGE FROM THE POTENTIAL LOCATIONS SHOWN ON THIS PLAN. 12.SPOILS STORAGE IS NOT PROPOSED ON-SITE. 13.THE MANDEVILLE LANE AND HOTEL SITE CONSTRUCTION WILL BOTH USE THE HOTEL SITE CONSTRUCTION FACILITIES AND TRUCK ACCESS ROUTE SHOWN ON THIS PLAN. CONCRETE WASHOUT AREA (MUST BE AT LEAST 50 FT FROM NEAREST INLET) STABILIZED CONSTRUCTION ENTRANCE STABILIZED CONSTRUCTION ENTRANCE PROJECT ASSUMES THIS TO BE THE POINT OF ACCESS FOR CONSTRUCTION AND IS THE ROUTE HEAVY EQUIPMENT AND MATERIALS WILL COME ON AND OFF SITE FROM MANDEVILLE LANE VIA 7TH AVE. CONCRETE WASHOUT AREA (MUST BE AT LEAST 50 FT FROM NEAREST INLET) PORTABLE RESTROOM AREA (MOVED AS NEEDED PER CONSTRUCTION ACTIVITY. MUST BE AT LEAST 50 FT FROM NEAREST INLET) POTENTIAL MATERIAL STORAGE AREA POTENTIAL MATERIAL STORAGE AND STAGING AREA WHEAT DRIVE PROPOSED BUILDING FOOTPRINT PROPOSED CONTOUR, TYP. EXISTING CONTOUR, TYP. SILT FENCING, TYP. SEE DETAIL INLET PROTECTION, TYP ALL. CONTRACTOR TO PROVIDE INLET PROTECTION FOR NEAREST STORM DRAIN INLET NORTH OF SITE N NPSSROFE OI NOM AT A AL E EEN G INRMICHAEL T. RUSSELL No. 59647PE 40 YARD ROLL OFF SOLID/CONSTRUCTION WASTE DUMPSTER CONSTRUCTION ACCESS ROUTE CONTRACTOR TO FOLLOW CITY STANDARDS FOR SIDEWALK CLOSURE - PED CONTROL SIGNAGE CONTRACTOR TO FOLLOW CITY STANDARDS FOR SIDEWALK CLOSURE - PED CONTROL SIGNAGE