Loading...
HomeMy WebLinkAbout012 - Utility PlanFSFS FS FS FS FS FSFS GM E E E EE E E E EDYHSW 12''S W 1 2 ' 'SWSWSWGS GS GS GS GS GS GS EEEEEEEEEEEEE E EE E E E EEEEEEEEEE E E ESW W 4'' SW 12''SW 12''SW 12'' 8'-81 8" 10' UTILITY EASEMENT 10' UTILITY EASEMENT 13'-03 4">>>>>>>>>>>>>>>OHP OHP OHP OHP OHP OHP OHP OHP OHP OHT OHT OHT OHT OHT OHT OHT OHT OHT ES ES ES ES ES ES ES ES ES ES ES ES ES EW EW EW EW EW EW EW UGP UGP UGP UGP UGP FO OHTV OHTV OHTV FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO NG NG NG NG NG NG NG EW EW EW EW EW 12 "WATER MAIN EW UGP ES ES ES ~ * * * * * * * * ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ >>>>>>>>>>>>>>>>>>>> >> >>> >>>>>>>>>>>>>>>>>>> >> >>> >>>>> >>>>>>>>>>>>>>TSEMEMEEMHSDYH WVEWWVWVWVWVDYH EEEWVWVETTGWMEW EW EW EW EW 20' WIDE RIGHT-OF-WAY EASEMENT PER DOC. #2131522 25' WIDE TRAIL EASEMENT 20' DRAINAGE EASEMENT10' UTILITY EASEMENT& ENGINEERS PLANNERS SURVEYORS DESIGNER DRAWN CHECKED PROJ. NO. DATE SURVEYED DESCRIPTIONDATEREVISION SHEET OF 2/29/24 13:43 BRYANA.ZUIDERWEG F:\7348 NORTH PARK WYNDHAM HOTEL SITE PLAN\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\06 - UTILITY PLAN.DWG;226 --- DJ&A, P.C. 01/16/2024 7348 MR BZ BZ UTILITY PLAN BOZEMAN, MT PROJECT ECHO NORTH PARK WYNDHAM HOTEL NSCALE IN FEET 0 20 40 GENERAL NOTES 1.CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF CIVIL-RELATED WORK. 2.UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES WITHIN THE PROJECT LIMITS. 3.CONTRACTOR TO VERIFY LOCATION, SIZE, MATERIAL, AND ELEVATIONS AT CONNECTIONS WITH EXISTING WATER AND SEWER MAINS. 4.SEE LANDSCAPING SHEETS FOR IRRIGATION LINES. 5.ELECTRICAL IS SHOWN FOR SCHEMATIC PURPOSES ONLY. SEE ELECTRICAL SHEETS. 6.SEE GRADING AND DRAINAGE SHEET FOR STORMWATER DESIGN. 7.COORDINATE WATER AND SEWER CONNECTIONS TO BUILDING WITH PLUMBING SHEETS. PROPERTY LINE, TYP. UNKNOWN UTILITY, CONTRACTOR TO VERIFY PRIOR TO DEMOLITION, CONTRACTOR TO PROCEED BASED OWNER DIRECTION EXISTING 8" PVC SEWER LATERAL EXISTING 8" DI WATER MAIN EXTENSION EXISTING 10" PVC SEWER MAIN EXISTING 12" DI WATER MAIN KEY NOTES 4" WATER SERVICE CONNECTION (SEE CIVIL DETAILS) 4" FIRE SUPPRESSION CONNECTION FIRE HYDRANT ASSEMBLY (SEE CIVIL DETAILS). CONNECT AND REDUCE EX. 8" STUB TO 6" FIRE HYDRANT LATERAL CONNECT 8" SANITARY SEWER LATERAL TO EXISTING 8" STUB ~241' 4" ZINC-COATED DUCTILE IRON WATER SERVICE LINE ~250' of 4" ZINC-COATED DUCTILE IRON FIRE SUPPRESSION MAIN ~85' of 8" PVC SDR 35 SANITARY SEWER LATERAL @ 3.5% SLOPE EXISTING FIRE HYDRANT (PROTECT IN PLACE) EXISTING POWER POLE AND APPURTENANCES TO BE RELOCATED DURING MANDEVILLE LANE IMPROVEMENTS EMERGENCY POWER OFF SWITCH (SEE ELECTRICAL PLAN) FDC LOCATION NWE TRANSFORMER UNDERGROUND POWER, TYP. (SEE ELECTRICAL PLAN) PARKING LOT LIGHTING, TYP. (SEE ELECTRICAL PLAN) TYPICAL US-ORIENTED CLEANOUT (SEE CIVIL DETAILS) TYPICAL DS-ORIENTED CLEANOUT (SEE CIVIL DETAILS) 1 2 3 4 5 6 7 8 9 10 11 12 2 5 6 7 8 9 4 12 16 GAS SERVICE CONNECTION TO BE COORDINATED WITH NWE GAS SERVICE METER (SEE MEP PLANS) ELECTRICAL ROOM MECHANICAL ROOM N NPSSROF E OI NOM AT A AL E EEN GINRMICHAEL T. RUSSELL No. 59647PE 3 13 UNDERGROUND POWER CONNECTION 3 1 13 10 14 14 14 14 14 14 13 FUTURE EV CHARGERS (SEE ELECTRICAL PLAN) 14 11 15 16 15 WELL, CONTRACTOR TO VERIFY PRIOR TO DEMOLITION, CONTRACTOR TO PROCEED BASED OWNER DIRECTION EXISTING PULLBOX. CONTRACTOR TO ADJUST TO GRADE AND ENSURE PULLBOX IS TRAFFIC-RATED. 20-FT PUBLIC DRAINAGE EASEMENT PUBLIC UTILITY EASEMENT 10 FT FRONT SETBACK/FUTURE UTILITY EASEMENT, TYP.