Loading...
HomeMy WebLinkAboutCONCEPT - Mixed Use master site plan FOR FEEDBACK ONLY267' - 10 5/16"234' - 5 3/4"UTILITY12' - 0"3 STORY 8-PLEX PHASE 1 OFFICE BUILDING PHASE 1 STORAGE BUILDING BUS & TRAILER STORAGE AREA AND PHASE 1 CONSTRUCTION MATERIALS STAGING AREA BUS & TRAILER LOADING AREA FALLON STREET LARAMIE DRIVE 23 PARKING SPACES SHOWN ON THISPLAN FOR PHASE 2 RES. BUILDINGS. PLUS CAN COUNT STREET PARKING FOR RESIDENTIAL.234' - 5 3/4"36' - 0"16' - 0"80' - 0"21' - 0"50' - 0"15' - 0"40' - 0"BLK FR.12' - 0"PLAZA BIKE RACKS GREEN SPACE GREEN SPACE GREEN SPACE GREEN SPACE GREEN SPACE 10' - 0" PEDESTRIAN ACCESS TO MAINENTRY.41' - 0"1 0' - 6 "ORNAMENTAL LANDSCAPING & BOLLARD LIGHTING TOACCENT PED. ACCESS. STORMWATER DETENTION ANDSNOW STORAGE AREA TYP. SNOW STORAGE AREA TYP. SLOPE ALL CONCRETE AND ASPHALT SURFACES AT 2% GRADE AWAY FROM ALL BUILDINGS TOWARDSSTORMWATER DETENTIONAREA TYP.PHASE 1 PHASE 1 STORM DRAIN SANITARY SEWER WATER STORM DRAIN SANITARY SEWER WATER EXISTING STREETTREES IN GRAY TYP. EXISTING STREET TREES IN GRAY TYP. ELECTRICALTRANSFORMERELECTRICALCOVERED TRASHENCLOSURE FUTURE PHASES PHASE 1 50' x 50'STREET VISION TRIANGLE 10' x 15' STREET VISION TRIANGLES 10' x 15' STREET VISION TRIANGLES 10' x 15' STREET VISION TRIANGLES GREEN SPACE 2 STREET PARKING 6 STREET PARKING3 STREET PARKING2 STREETPARKING 4 STREETPARKING 18' - 0"7' - 0" 12' - 0" PEDESTALMAILBOXES SNOW STORAGEAREA TYP.ELECTRICAL TRANSFORMER PROPOSED E.V. CHARGINGSTATION 1 2' - 0"1 2' - 0 "45.00° 52' - 11 17/32" 5 0' - 0 "3 STORY 8-PLEX 15' - 0"2 STORY 4-PLEX GREEN SPACE PROPOSEDBUILDINGS PROPOSED FUTURERESIDENTIALBUILDINGS2' - 6"7' - 6"10' - 0"28' - 2 1/2" BLOCK FRONTAGE FACADE GLAZING:TOTAL AREA BETWEEN 30" AND 10' A.F.F.: 28.2' X 7.5' = 211.5 S.F.GLAZING AREAS: (3.0'X6.66')+(3.0'X6.66')+(12.0X 6.66') = 128.67 S.F. 137.54 / 211.50 = 60.8% GLAZING IN REQUIRED AREA.6' - 8"12' - 0"3' - 8"3' - 8"HIP AND HUMBLE ARCHITECTURE, LLC COPYRIGHT 2019418 South 5th AvenueBozeman, MT 59715 406.581.3832 Bob@hahaarchitect.com PROJECT #:REVDESCDATEPHASEPRESDDDCDDATE1234HIP AND HUMBLE ARCHITECTURE, LLC A2-1 04.10.24SITE PLAN & PHASEINFORMATIONCURRENT LANDING, LLCOUTDOOR REC. FACILITYLOT 2 - PARKWAY PLAZAMIXED-USE MASTER SITE PLAN2024------------ 1" = 20'-0"A2-1 2 SITE PLAN / PHASING PLAN 1" = 80'-0"A2-1 1 VICINITY MAP PARKING INFORMATION: - PHASE 2 BUILDING MAIN FLOOR AREA = 3010 SF - PHASE 2 BUILDING SECOND FLOOR AREA = 1817 SF - PHASE 1 STORAGE BUILDING = 2000 SF - PHASE 1 BUILDING MAIN FLOOR AREA = 2300 SF - PHASE 1 BUILDING SECOND FLOOR AREA = 2300 SF OFFICE SPACE REQUIRES 1 SPACE PER 250 SF STORAGE REQUIRES 1 SPACE PER 1000 SF - TOTAL PROPOSED OFFICE AREA = 4827 SF PH. 2 BUILDING, 4600 SF PH. 1 BUILDING (4827 + 4600 = 9427 / 250) = 38 SPACES - TOTAL PH. 1 STORAGE AREA = 2000 / 1000 = 2 SPACES TOTAL PARKING REQUIRED = 40 SPACES (43 PROPOSED ON SITE) *PLUS THERE ARE 17 STREET PARKING SPACES AROUND THE PERIMETER OF THE PROPERTY. 1/4" = 1'-0"A2-1 3 NORTH ELEVATION - PHASE 1 OFFICE GLAZING PARKING IN MULTI-BUILDING DEVELOPMENTS TO BE 50% OF STREET FRONTAGE MAX. -TOTAL STREET FRONTAGE = 718'-1" -TOTAL PARKING FRONTAGE = 253'-0" -PARKING IS 35% OF STREET FRONTAGE I WILL NEED TO REVISED ALL OF THESE CALCULATIONS IF YOU WANT TO MOVE IN THIS DIRECTION.