Loading...
HomeMy WebLinkAboutRevised Site Plan & Phasing info267' - 10 5/16"234' - 5 3/4"UTILITY12' - 0"68' - 0"131' - 0" PHASE 2 OFFICE BUILDING PHASE 1 OFFICE BUILDING PHASE 1 STORAGE BUILDING BUS & TRAILER STORAGE AREA AND PHASE 1 CONSTRUCTION MATERIALS STAGING AREA BUS & TRAILER LOADING AREA FALLON STREET LARAMIE DRIVE BOZEMAN HIGH SCHOOL STUDENT PAINTED BUS ON THE ROOF.101' - 10 1/2"46' - 0"86' - 7 1/4"36' - 0"16' - 0"80' - 0"21' - 0"50' - 0"15' - 0"40' - 0"BLK FR.12' - 0"PLAZA PLAZA BIKE RACK GREEN SPACE GREEN SPACE GREEN SPACE GREEN SPACE GREEN SPACE 10' - 0" 16' - 10 5/16"15' - 0"PEDESTRIAN ACCESS TO FUTURE MAIN ENTRY. SECONDARY PEDESTRIAN ACCESS. PEDESTRIAN ACCESS TO MAIN ENTRY. 16' - 9 1/16"41' - 0"10 ' - 6"ORNAMENTAL LANDSCAPING & BOLLARD LIGHTING TO ACCENT PED. ACCESS. STORMWATER DETENTION AND SNOW STORAGE AREA TYP. SNOW STORAGE AREA TYP. SLOPE ALL CONCRETE AND ASPHALT SURFACES AT 2% GRADE AWAY FROM ALL BUILDINGS TOWARDS STORMWATER DETENTION AREA TYP. SLOPE ALL CONCRETE AND ASPHALT SURFACES AT 2% GRADE AWAY FROM ALL BUILDINGS TOWARDS STORMWATER DETENTION AREA TYP.PHASE 1 PHASE 2 PHASE 1 STORM DRAIN SANITARY SEWER WATER STORM DRAIN SANITARY SEWER WATER EXISTING STREET TREES IN GRAY TYP. EXISTING STREET TREES IN GRAY TYP. ELECTRICAL TRANSFORMERELECTRICAL6' - 0"36' - 0"9' - 0"90' - 0"4' - 0"5' - 0" COVERED TRASH ENCLOSURE PHASE 2 PHASE 1 50' x 50' STREET VISION TRIANGLE 10' x 15' STREET VISION TRIANGLES 10' x 15' STREET VISION TRIANGLES 10' x 15' STREET VISION TRIANGLES GREEN SPACE 2 STREET PARKING 6 STREET PARKING3 STREET PARKING2 STREET PARKING 4 STREET PARKING 64' - 0"24' - 0"18' - 0"7' - 0"20' - 0"9' - 0"7' - 0"1 2' - 0" PEDESTAL MAILBOXES SNOW STORAGEAREA TYP.ELECTRICAL TRANSFORMER PROPOSED E.V. CHARGING STATION 12' - 0"12' - 0"45.00°52' - 11 17/32"50' - 0"5' - 0"PROPOSED BUILDINGS PROPOSED FUTURE BUILDING2' - 6"7' - 6"10' - 0"28' - 2 1/2" BLOCK FRONTAGE FACADE GLAZING: TOTAL AREA BETWEEN 30" AND 10' A.F.F.: 28.2' X 7.5' = 211.5 S.F. GLAZING AREAS: (3.0'X6.66')+(3.0'X6.66')+(12.0X 6.66') = 128.67 S.F. 137.54 / 211.50 = 60.8% GLAZING IN REQUIRED AREA.6' - 8"12' - 0"3' - 8"3' - 8" BLOCK FRONTAGE FACADE GLAZING: TOTAL AREA BETWEEN 30" AND 10' A.F.F.: 38.2' X 7.5' = 286.5 S.F. GLAZING AREAS: (5.66'X6.66')+(5.66'X6.66')+(9.33X 6.66')+(5.66'X6.66') = 175.24 S.F. 175.24 / 286.50 = 61% GLAZING IN REQUIRED AREA.2' - 6"7' - 6"10' - 0"38' - 2 1/2" 5' - 8"6' - 8"5' - 8"6' - 8"9' - 4"6' - 8"5' - 8"6' - 8"HIP AND HUMBLE ARCHITECTURE, LLC COPYRIGHT 2019418 South 5th Avenue Bozeman, MT 59715 406.581.3832 Bob@hahaarchitect.com PROJECT #:REVDESCDATEPHASEPRESDDDCDDATE1234HIP AND HUMBLE ARCHITECTURE, LLC A2-1 01.18.24SITE PLAN & PHASEINFORMATIONCURRENT LANDING, LLCOUTDOOR REC. FACILITYLOT 2 - PARKWAY PLAZAMASTER SITE PLAN2021------------ 1" = 20'-0"A2-1 2 SITE PLAN / PHASING PLAN 1" = 80'-0"A2-1 1 VICINITY MAP PARKING INFORMATION: - PHASE 2 BUILDING MAIN FLOOR AREA = 3010 SF - PHASE 2 BUILDING SECOND FLOOR AREA = 1817 SF - PHASE 1 STORAGE BUILDING = 2000 SF - PHASE 1 BUILDING MAIN FLOOR AREA = 2300 SF - PHASE 1 BUILDING SECOND FLOOR AREA = 2300 SF OFFICE SPACE REQUIRES 1 SPACE PER 250 SF STORAGE REQUIRES 1 SPACE PER 1000 SF - TOTAL PROPOSED OFFICE AREA = 4827 SF PH. 2 BUILDING, 4600 SF PH. 1 BUILDING (4827 + 4600 = 9427 / 250) = 38 SPACES - TOTAL PH. 1 STORAGE AREA = 2000 / 1000 = 2 SPACES TOTAL PARKING REQUIRED = 40 SPACES (43 PROPOSED ON SITE) *PLUS THERE ARE 17 STREET PARKING SPACES AROUND THE PERIMETER OF THE PROPERTY. 1/4" = 1'-0"A2-1 3 NORTH ELEVATION - PHASE 1 OFFICE GLAZING 1/4" = 1'-0"A2-1 4 WEST ELEVATION - PHASE 2 OFFICE GLAZING PARKING IN MULTI-BUILDING DEVELOPMENTS TO BE 50% OF STREET FRONTAGE MAX. -TOTAL STREET FRONTAGE = 718'-1" -TOTAL PARKING FRONTAGE = 253'-0" -PARKING IS 35% OF STREET FRONTAGE