Loading...
HomeMy WebLinkAboutCivil_007_091421 Landscape Plan Sheet L1.1 ---------- IN PLANT SCHEDULE QIY BOTANICAL/COMMON NAME CI]F i,y,' IN 9 All tataricum 'Hat Wings'/Hot Wings Tatarian Maple* 2"Caliper 11 Gledhill triacanthos 'Imperial'/Imperial Hon ylocust 2"Caliper 2 Molus x'ProidAW/PraWfire Crab Apple 2"Caliper Scale.1"=30' }J 3 Picea glauca 'Densata'/Black Hills Spruce• 8'Min. Ht. 4 Ouercus robur'Fastigiate'/Pyramidal English Oak 2"Caliper Landscape Data o-W I 5�� N sttaues Qj,Y BOTANICAL/COMMON NAME SI]F Zone:B2(Community Business) Z 1 _d I I I T y Y' z"""- --=-` - =-_ J Y I O 21 £uonymus olotus 'Compoctus' Compact Burning Bush 5 gal W + W street Tree N Site Area =103,430 sf. (2.37 ac.) -- (Tip•) '6 " WS"Wiri'e Pedestrian -J 2 „"I IiI N 21 Junipers honzontolis 'Bar Harbor'/ear Harbor Creeping Juniper• 5 gal Landscape Area Provided=26,867 sf. (26%) o /rtwa 10'Ill Plant Alarell Shall Provided 75%Plant Coverage Trash Enclosure with _ O .'t{ , Wr/kel I 29 Junipen/s scopubrum 'Skyrocket'/Skyrocket Juniper• 15 got Plant Screening-see 6'Toii was see ® I Usable Commercial Open Space Required=1,646 s.f. Arch.Plans f Details Arch.Pons a 5 Ph oca us u ulf Plus 'Summer Wine' Summer Wine Ninebark 5 gal YS /P P / ------ /se sae Dock J Z)�® Parking Landscape Required=1,040 sf, o / --------------- -------------- ll 29 Pinus mugo 'Showmound'/Mugo Pine 5 9al Parking Landscape Provided=1,052 s.f.5'Wide Foundation 4 21 Potentnla faticasa 'Gold6nger'/Gold6nger Potentilk,* 5 gal Street Frontage=481 If. (I Tree per 50 ill Designed by.•BW Planting Sinp with j : IiI 11 Iu Drafted by:NE Intermittent✓s icoi / N O Street Tree Required=10 Trees(10 Provided) Planting to Soften Walls / 8 Ip 27 Prunus x cistena/Purple Leo(Sand Cherry' S gal q Client Nome: 3'Wide Rased / I O CCA Acquisl \ / Landscaping 10(Typ.) I 12 Rhus aramatico 'Gro-Low•/Gro-Low Fragrant Sumac• 2 got / M See Architecture/Plans for Site Amenities to be 21_097/a \ B P \ / Smart 12 1� IiI Z 12 Ribes alpinum 'Green Mound'/Green Mound opine currant• 5 gal Included is Usable Open Space(2%of the Land Ares) \\ �j Smart Foods I O. II �I IA O 8 Spireea beta/if lie Tar/Birchleaf Spi ea 5 gal Landscape Notes: W \\ (r v I I�j�l / 1. See Sheet LJ I for Planting Details. F. j 22,022 S.F. N M ORNAMENTAL GRASSES Y BOTANICAL COMMON NAME S� Q \ .,1 1WII �'I IN 2. Al/Landscape Material shall be Fully/mgoted by an Automatic ImIgotion U \ 2w�1 p 35 Co/amagrostis x acutif/oro 'Karl Foerster'/Karl Forester Gross• 2 gat System. The Controller Shall be a Weather Based Controller with a FF=4810.75 .II IiI I^ Rafn/Freeze Sensor.Point Source Drip/rrfgoUw for Shrub Areas and 0 \ y Water Elh'chint Rotary Spmyheods for Lon Areol See Sheet L21 for to \ I +W ICI M 16 Panicum vfrgatum 'Shenandoah'/Burgundy Switch Gross* 2 got krrfgrt,-Layout See Sheet LJ 1 for Irrigation Details. 0) I�\ Sleet Tnee J. Adjust P/ant Material as Needed to Accommodate New and Existinga PERENNIALS im BOTANICAL/COMMON NAME SIZE Utilities. off 3'Wide Raised \ Landscaping IiI 4 8 Hemeraci llia x 'Red Hot Returns'/Red Hot Returns Doodle• 1 gal 4. Al/Existing Trees Shall be Removed. Z;2, a 5'Wide Raised Strip t W \ 5'Wid o C% e O IiI I 5. Prior to/nstail Stone-Al an ATn/oneon of Pre-ememenl bkak de. J \ Planter Po i`" a Wibe I 15 Nepeto x f ii'Dropmarl/Catmint• 1 gat = rr,`( i> IiI Pedestrian 6. Benches and Tob/es/Choirs Shall/be Spschnd by the Architect See Q connection Architecture/Pons for More Detail. $ /" ENTRY j Ell l I I to Sheet / ,%/ Walkway L Qn-' BOTANICAL/COMMON NAME a j�E Z N 16,443 s! Poo protensh,/Kentucky Bluegrass Blend sod Landscape Keynotes T y ® ° Ol /pats//Lan W -Drought Tolaront Plants lPed blan 3 3 I�of 5 1 I D /tall Decorative Steel Edging Z / Crossing O 4'Wide T WOJ' O Install 7rce in I-Grote-See Materia/ Q Pedestrian (TYR) o I Schedule for M Derail ` crossing I MATERIAL SCHEDULE saw storage Area-see / ��� \ 2 1 Ste Plan far More Detail Deconatim Stone-1-toll a Four(4)inch Depth Over DewYt Pro5 Weed Bonier,Stone Shall be O B'ke Rock(6+Parking Stall.)-See Arch.Pions / Used in SpeaYed Shrub Areas and Washed Prior to/nsta/ration;Stone Shall be 2-3'Diameter Detoi/.•4113.! _ m' Cobble with Earth Tone Colors and to Match Ad' Plato//Bockf/ow Preventer-See Irrigation y Adjacent Stone Used in MCOonola's Londvcape O Plan �r \ - Londscope,Boulder-Boulders Shall be 2-3'Diameter,A u/ar,Earth Tone Color and Shall Existing DIMh with Notice G rs Match rofive Stone;All Boulders Shall be Recessed 1 hes into Ground and�gsh¢d Upon Detail.•5/L3.1 O7 Completion;(5 q(y) 4"x 6'Landscape Concrete Curbing-theta//Flush to a//Concrete Edges Between Lon and B Usable Open Space Area(1,741 e.l.)per City eirement ., I Shrub Areas,•Curbing Shall be Continuous.Adjust Alignment as Needed to Amid New and Detail,4/L3.! Ci Rqu lb IiI I E'sang U1i%ties and/mgohon Boxes gO Existing Offsite Candsc pie C�(- r 1 " Y 4'x 4'Decorative Cost Iron Trod GMte-Tree Grote shall be Installed in the Walkwo Adjacent __J - "-F li III q to store with Specified T and o Four(4)Inch Depth of Deconahm Stone Over Weed Barrier, 10 6'Long Decorative Bench(2 qty)-S m Grates Shotl be Monufocturcd by/ron5mith;Strrburst Tree Grote Style/4Bf4-l: 16'Opening, Arch.Plans f Al Detail I III Keynote,f3 Det h.. 12/L3.1 /- - 26.0' 1&0, 1&0, F Finish:Bronze Colo, No Light Welft Contact IMJ-744-O48d,Coordinate with Genera/ Table and Chairs-See Arch.Plans for /�l� --I--- 26.0' 1B.0' .O 1&0' 26.0' 1&5' w 1l I I N^ x Contractor for Sidewalk Cutout Areas and Cost in Place F rues(4800F)f I Grates; O Detail -�---1 Z� - ICI Landscaper sho///natal/Tree Grates;Instal/par Monulact sal Spectr-t ns,•(4 Otv) 1 12 C 12 /toll Decorative Pots with Mom t (4 qty) � DecoretNe Pot-Install in Shrub Areas Where Shown on Plan(4 gty.J;Pots Shell be 30'(T)x O S Material Schedule for Moro Detail -I III 4'High Ip 36"Diameter From a Local Source;Architect and Owner Shall Determine the Color and Material,- Instal/Lawn Detention Pond,See Gmain I a'Wide Continuous II ® Pot of Pot Shall have a Drain Hole;Bottom of Pot Shall Have Clean Drain Grove/and a Sol/ None 13 g -- IInn Pedestrian Shrub Hedge Ip N age Plan for More Pond Info. -I -- _10 W to Walkwo to Screen �I Media Wrapped in Fitter Fabric;Annual Flowers Sha//be Planted in Pots and Determined by y 4 1 I P_. Lot Ipn Owner,Pots Shall be Irrigated by a Onp System-See lmigation Plan f More Detail \ h I- � _____�1 Cannot` _ Cart I;I FromnEde ing N Q� �r __ ]i Corral + Residential p ry�-- ---- Ili General Landscape Notes 'Z y o � �Tree I re 1. Plant material quantities one provided for bidding purposes only.It is the 12 The contractor shot/take a//necessary scheduling and other precautions to 24.A//deciduous trees shot/be double staked per tree staking details. Tree v XX�� contractorsresponsibility to verify o//quantibes listed-the plans and the amid winter,climatic, wildlife, or other damage to plants. The contractor stakes shall be wood and ties shall be lT.Ci-he lies,/cT32.It I.the Olb amilabilty of a//plant materials and their specified sizes prior to submitting shall install the appropriate plants of the appropriate time to guarantee life contractors re ponsibllty to remove tree staking after,one year. N III a bid. The contractor must rally the Landscape Architect prior to submitting of plants. O12 a bid Y the control catermfxs a quantity Cf ieney or amf/abilYy Problem 25.Instal/landscape concrete curbing between lawn and planting areas. Curbing IM with specified material. fie contractor shall pronde sufficient quantities of 13.The contractor shall instal/o//landscape material per plan,notes and details. to be installed/eve/and unff and shall match top Fnish grades of r--- _- Prang Lot N I IiI II Plants equal to the symbol count or to fill/the area shown on the plan using concrete walks and curbs.See landscape concrete curbing detail. ------ Londscapirq-- 2 I^ the sp-Mied spacing. Plans take precedence over plant schedule quantities. 14.Al/existing and rc/ocoted trees sho//be properly protected T s damaged J ^ � ,) I I I p during construction shall be replaced at rro cost to the owner. 26.Bury 2 inches of boulder height into soil,keeping best visual side above IIT ^ 2. Contractor shall call Montono811 before excamtion for plant material. ground Use core to minimize marring and scratching. 15 Plant names arc obbrewated on the drawings,see plant schedule for nbols, -- -I--- ---I--- -- II IiI 3 Pnor to construction, the contractor shall be responsible for locating all abbrewallons,botanical,common names,sizes, estimated quantities and 27.PmWde a 4 inch depth of imported tpeofl in a//town amos, I underground utilities and shall amid damage to al/utilities during the course remarks. 1 ---- -- I ICI of the work.Itsho//be the responsibility of the contractor to protect a// 2&Sod must be premium quokty, evenly cut, established,healthy, weed and utility Ines during the construction period,and repair any and a//damage to 16.No grading or sal placement all be undertaken when soils are wet or disease J,and from an approved source. 9 I utitttles,structures,site appurtenances,etc. which occurs as r result of the frozen. landscape construction. 29.A//lawn areas to have uniform grades by Awt raking.Prior to laying sod, 0 -- -- -- I T 17.premium t %dark/sa used for al/roof ra a areas. The topsoil must be a F-- Typ. III Importedapse p opso apply a starter with no,g of a rote recommended carefully the more pared to Sod -- ---I--- _---_- -- I 10'Wide 4. fie landscape contractor shall examine the site contracto under which the premium quality dark sc-br loom,free errocks, sot roots,the mart must be Parer with no gaps between pieces on o carefully prepared topsoil IiI Existing I ark is to be performed and notify the genera/contractor in writing of mother. The/andseape coot star sho//perform a soil test on the imported layer. Sod to be slightly below Apish grade and concrete walks and curbing. I- ---I-- I Walk y upset factory cand'tions Do not proceed until candYbns hove been topsoil and amend per soli test recommendations. The soil test shall be done fie laid sod must be fmmedateky watered alter installation.Any burned areas corrected. by a carthied soft testing agency. will require replacement Adjust sprinkler system to assure healthy green 5. The contractor shall proWae all materials,labor and equipment required for 18.Prior to placement of topsoil in at landscaping areas, o//subgrode areas sur Aml of the sod without water waste. the proper completion of a//landscape work as specYrd and shown an the shall be loosened by scarifying the sal to a depth of 6 inches in order to M.The contractor shall comply with all worrontes and guarantees set forth by ------I ---I--- -- I I .IiI drawings. create a transit,-him,between existing and new soils.Remove all the Owner,and An no case shall that period be/am than one year following construction debris and foreign material the date of completion and final acceptancill fie warranty shall ine/uds plant See civil and architectural drawings for 0 structures,hardscape,grading, and material and Installation of plant motel drainage information. 19.Provide-eight(8)inch depth of imported topsoil in a//sbmb areas and twelve(12)inches in parking isalnds. I ---- -- I 7. Contractor safety and cleanup must meet OSHA standards at all times. All contractors must hove adequate%od'6ty,personnel injury and property damage 20.Al/plant material holes shall be dug twice the diameter of the roatbe//and 6 nsurance, Clean-up must be performed dory,and al/hardscope areas must inches deeper. Excavated material shall be nemoved from plant and tree pit be washed free of dirt and mud on Anal cleanup. Construction must occur and replaced with plant backrr//mixture. The tap of the root balls,shall be ---I--- -- -- I I III in a timely manner. panted flush with the finish grade. 8 All new plant material shall conform to the minimum guidelines established by 21.Plant backrill mix shall be of 3 its topsoil to 1 part sal Posed Pa apse/ Pa pop, the American Standard for Nursery Stank Published by the American and shall be mixed at the planting hole.Deep water al/plant material -=---� _-L_- --- I I Association of Nurseryman,Inc. In addition,all new plant material shall be fmmediatiy after planting. bockAll mixture to depressions as needed - ---__-__-- -- - -- of specimen qualify. 11 `� 22 N/new plants shall be balled and burlapped ar container grown, unless 9. fie Owner/Londecops Architect has the right to reject any and all plant otherwise noted on plant schedule. Container grown frees shall hove the nirefa not conforming to the plans and specifications. container cut and removed. T fin ball and burlap shall have the strings, _ - II burlap or plastic cut and pulled away from the tank exposing 1/3 of the IS Sep, 2021 I I Ipp 10.Any proposed substitutions of plant species shall be made with plants of mot ball.For trees in wire baskets,cut and remove the wire basket ---- II III culture nt overall loan,height branching hobo !load,leaf,colas,Tait and e 1 SHEET culture only os approved by the Landscape Architect 23.and completion of recaing operations,on lands areas wth tree,shales, I it./t a the contractors responsibility to furnish a//plant materials free of pests Stan�all perennials even Wood d-.caref/y Prepared g reee oys,Dewitt P-5 Qe f weeds. s I III or plant mote s. /t is the obligation ty, The topslightly g contractors b/' fro to maintain and warren of stone ahu� be/ow knish rode and concrete area � in o//plant materials.