Loading...
HomeMy WebLinkAboutCivil_004_091421 Grading plan ----------- - fJ611N l�' 3psor7ou.AaNx, 1 rncE)tll t*A, " O.00I 9IVMHS b0 0� I R za, eGa I r 5 Ifl � I p Scale:1 is30f �)`�_ 3D" 0 3D' 60" I Yp8jJa0 e° -_ '\ ib:1� I.i 09i �_ /��-yI Illw I lie a 1p� 48 $5_''''�p;oo j III �0` p lil eGJO III ,(/t�rl lTlj i lil '�a�t1• 0 ..�I @ ��y� II - 480611 ---- ------ If -------- -- , ` 4 j ,P, III 6'( �; vyp I �'� 0• �OryO �'��'� 4Tgye. P1 1• " General Gradiae Note 1. Al/grading rho//be in accordance with the project geotechnico/study.o 2 Cut slopes steal/be no steeper than 3 horizontal to 1 vertical. Ory yob ^ �ytl I'I 1 3° ��.I IryII 3. Fill slopes shall be no steeper than 3 horizontal to 1 vertical. �t� NE log II `v i/;' III 4. Pills shall be compacted per the recommendations of the geotechniro Client ent Name: T" ,lo ,\ p report prepared for the project and shall be certhied by a Geotechnkal dye e1 L�.,'Ip e o't1 it Engineee CCA Acquisition 5 Areas to receive fill steal/beprepeNy Prepared and approved by o to 27-097 r Geotechnico/Engineer prior to placing fill. 6. Fills shall be benched into competent material as per spacrcabons and �� I Oy4 B 1h�.I}�40� geoteehniea/repot. Smart Fodo�s M'`Oy� If.�`\'`,lil iN 7 Engneerh bockfi//sho//be tested and cerFYied by o Geotechnico/ W I ^p 8. A techn-1 engineer shall dorm nod'c inspections and submit a Q 22,a22 S. v" I: �I III complete report and map upon completion o!the rough grading. U \ I 9. FF=4870P 5 1?sr, II. II 9. me final compaction Pod and aedraation r m a GeotechnAvI O o L•, .If Ip Engineer shall contain the type of field testing performed.Each test shall be identified with the method of obtaining the in-place density, OLD 1 whether sand cone or dive ring and shall be-noted far each test. Q \ f0 I r i 0F� Sufficient maximum density determinot/ons shall be performed to mHfy o, k8 I ;rI the accuracy of the maximum dens;ty curves used by the field otf a1` J 09 Ip t-hr..n. r Q \ ,1 Z tl .` ,.,�9 Y I. Al d /a Dust shall be conrl/ed by watering. J 48 0 ' ,lo@ �� I I 11.The location and protection of all uti/'Ues is the responsid'hYy of the = N Yee. Q --- T' PON ,q ENTRY/ /////W; 9` 9` / h yy' -- [xis// 01, Oy 12.Approved protective ec osums and temporary drainage provisions process. must N �0,�p aG 1I \ _. be used to protect adjoining properties during the grading precess. Z / 1I0 _ 0•p51A --'r+-_�y`"I �_a�0�'`.`- 13.Al/public roadways must be cleared da;y of a#dit,mud and debris O �� 1Q __1 g(P I I C,�O• TOO -ii"--rr I domled on them as o result o!Fhe grog operation. Cleaning is toCO El -L 9�- --- -- 0-- --o J I 5e li be done to the satisfaction of the 06,Engineer. W l(P�00'(P'.�F o oo I', 14.The site shall be cleared and grubbed of al/vegetation and deleterious in 9"870' 000 10' ,0� .$ $ I p�'rlyy� P�• I I matter poor to gang. Z / P 00 OO• L----- 15.The contractor shall vide shor n accordance with OSHA - ------- ---- - y •9 of-ono-- 0 1��5 0o rega;remenmrrrrcn°h g o wage. 16.Aggregate base shall be compacted per the geotechnico/report �/ � �� \ Q `99 9� 9•_�__e _ 9•_ _ A �'JA v I wQx' I prepared far the project 17.The recommendations in Use following Geotechnica/Engineering Report \ G \ \ PSQ ---1_- -L $ --� -�,�P P I 9•I I by arc included in the requirements of ng Parabon. fie Report is titled g� and 9iYB P proejec No.. Doted: 1B.A.port of the constroction documents,owner has provided contractor fpcE�,, Fv° -'•MS_' I ___ ,r ! j-'.1I yGJb I^ with o tpog phic su y performed by manual or credal means.Such `V e0: GJP@ I N r/�1 i r 00 I Y su y was prepared l project design purposes and is provided to the ___ _ �,1' q/ �t ,,I I� of occu n t existing, stygund condbons such survey _�--- ' � -i /I( I contractor os o��u�esy./t is��roP Ph rstood that I --- _ I I 19.if Contractor observes evidence of hazardous motenae or contaminated L,_'S @ �',t r I y soils he shall immed ate/y contact the project engineer to provide N J - y I III noth7cabon and obtain diection bet proceeding with Asturbonce,of coa4g ( --- i g5Sp0.4` �'I„ k✓• �`. lil I 2 said materials Or contaminated soil. O -1, o °a '',�o@�• IY-- o@ � - �• �'�y4G � °6 1 1� 1'A y� 9 j�-. -�I� I IX y lb -- P� lb pY ,'ycP h i I� Curb and Gutter Construction Notes: Vi o 1. Open face getter shall be conshucted where d inoge is directed away 1 A J �L P fP�P -- L�' Itl I curb. ) _ --- f I { O 2. Open face gutter locations err indicated by shading and notes on the dye, f '- - G --I --� / I grading 3. /t is the rcurb grade of the su s to adjust top of a. gzds to top of curb grades at the time of construction staking. II I 0404 4. Refer to the typical details for standard and open face curb and gutter y I I GJe I dimensions. �`� - I q4 1 ate O 5. T nsitions f open face to standard curb and gutter am to be l99','' IT-� ---I--- -- _ �I smooth.Hand form these areas if n--,,.. _\�`yl�i� I 6. Spot elevations are shown on this plan with text masking. Coordinate ---- -- 810 ' I II -G I and verify site information with project drawings. �'-- G SA -- -- @ Sidewalk Construction Notes: 1. Concrete sidewalk she//be constructed with o cross slope of 1.5X (2.0"Maxima)unless shown otherwise o np plan. 2. Running slope of sidewalks shall id built per grades shown on the plan. @c ry°GJ fpGf� - l�'Je01 1 where grader ore not provided,sidewalks shall be constructed with o maximum running slope of 4.5X �jl f 3. Refer to the SYe Plan for sidewalk dimensions. dj0 E-� °1p10°V 1 = J@0� s_BcurreJ foal 01. o0o ZSSep, 2021 o+ ooc �P i � e ; Ilr ' to \0 yGJAO fP , ep0 G Cr@ A0(P°el '� f c@, II � p rIII SHEET NO. o-o o�' e0 E0 CG @� ���� ,4810 ',.G@a���,� _ '_,'�`'-- �s '-•�T i'��-,1 .c4.�5`600 I�