HomeMy WebLinkAboutCivil_003_070121 Site Plan Site Data
Site Area a 103,430 sf. (2.37 ac.)
j / I� III 11 f IA Landscape Area Provided=26,867 sf. (26%)
Impervious Area Provided=56,541 sf. (55%)
Building Area =22,022 sf(19%)
Parking Required= 73 Stalls (1/300 sf) Scale.I"=30'
I�
Grocery Store Parking Provided= 77 Stalls (3.49/1,000) 3o so
/ /// I III I li lil II
21
, c _ --A--- Poradr-- 1 d �I;� fIlIl
6 3 �.�.. O 3 __- /6___� • Site LOIIStr[ctiOII Notes
24 Curb&Gutter
oa I 6I lu Hatch Legend 2� c net.asphalt Paving
o
I 1 /lo f` IN
Existing Asphalt
L'onat.Cone.S'dewa/k
/ O Existing Asphalt Poring to Remain ti
Const.Accessible Stn n
/ 1 / 20 Proposed Asphalt P/9 Per MUTCD&/CC/ANSI
0
/ O A (Latest Edition)
II .III I (See(See Accessible:Details and Notes)
Cons4 Proposed Concrete O (Late Accessible Ramp per/CC/ANS/Afte)
(Latest Edition)(See Grading Getai/Sheets)
7 Const.Lands Planters Gesyned b:BW
AL11 Stdp'n !k/!ng Areo O Y
i1, SnuF,P vide S h C/n Edge Grafted by.NE
12 JO' I' X�X O Contractor shall Cent Mme:
V 4 I lii p Snow Removal Arso y Coast. 4' mil Paint Stripe(T, CCA A uisibon
1 I 5.0' I provide 15 mils min.thickness M
Emiianmenta/,•No Excavation 10 Const.Conc.Paving 21-097s
'12 Smart FoodsP0111,
295 II ICI III ® or Construction Area O Shopping Cart Retum Sta//
„e
/ 6 j �ItI I:N 12 Ou meter Enc/asure(see Arch.Plans)
\/ 1 14 22,022 S.F. j ,1:?;. •:. ,- "?`pl Ill^ 1J Const.B'ke Rock per city stds. (Capacity 8 Bkes) W
22 �� FF=4310.75 ;��{ I� 14 Const. 6•Raised Sidewalk Q
1 1 _III 15 Conn.&Match Existing improvements V o
Coast.J'Landers,-Strip %undatlon Planting' � V
O I 17 Const. 8'Screen Wo// v
City Required Street Lighting Q
V 1s d _kl li z
V 1 16 11., p� �pp6 19 Const Concrete Wheel Stop a
q ® Usable Commercial Space encompassing 1,646 s.f. W v'
5.gam
5• I See Arch.and Landscaping plans =
II`I I 21 Snow Storage Area Q
\ - 6 1 13 i1 .ICI I' Q Environmental Area;No Excavation or Construction ?� °
1 IL 15
Z
41.0
, \,/ 10 \ O .78 14 6 •'7 Ir___�_, r>•10.0' Q
15 o O r-4.G 1 5 p 2
\ =Jo' 1 I A'
8 c -3.0' -10.0• I General Site Notes.
� \ r-1s• li 1
\ are
-JO' 1.- _ J I Al/dimensiorns to bock of cut unless otherwise✓'� � � �-` -r— _— I — I � I noted.
a 5 5 ' I I
// �✓ b, I I�I p
\ / 15 8 2. Fire lane markings and signs to be installed as
directed by the Fire Marsha%
J. Aisle markings,at directional y aawe andstop he will
„„N be painted at cart driven h on theplans.
1D 1/ 2 it I 4. Const. curb transition at al/points where curb abuts
21 I p sidewalk,see det.1
/�\ --�--- 26.0' 180' 18.0' 26.0' 180' 18.0, 26.0- I li. IMI 5. Contractor shall place asphalt paving in the direction ill II 18.5' 4. I A•
20 22 of vehicle travel where possible. W
p
9 1 I.. •lil III 6. Limits of demoh'tion/d'sturbed areas shown on the
19 O
I� co contractor's responsibility to determine the means and
---I---I / ethods of how the work w1/be completed. The
p
_ _�- / it tl contractor shall determine the area of construction t U1 I�
1 11 11 11 4- I X
- - / III impacted areas andto#restoration shall be tport of the
-- a --- -- / 'w
^ contract bid.
-J.0, 1 / L lil p TV 0
..0'
-- I 1 lil ICY fi.0II8truCllOII Survey Hotel ;w O N
_ 4t
me
Construction Srvey Layout for this project will be O m
provided by Anderson Wahlen&Associates. fie L y.ut
6 -I--- - 3.0' IO Proposal and Profess/ono/Services Agreement will be provided O
r--- -- Lease Line 15 \ 8 15 I L.:._ .III I to the General Contractor(s)for i'lueion in base bids. me
8
I ---I--- I II Survey Layout proposal has been broken out into Building
Costs and Site Costs for use in the Site Work Bid F
Survey Contra/Note:
L_� ----- -- I �6�I I The contractor ar surveyor shall be responsible for
C-_n rl - --- I :il I following,the Notional S rely of Professional Su�(NSPS) 'w
mode/standards for any surveying or construction layout to be
_ I ompleted using Anderson Wah/en and Associates ALM Su ys
---I---I -- __ I- or Anderson Wahlen and Associates construction improvement
plans. Pnor to proceeding wth construction stoking, the
surnble far ven6ing,
l carlml
from the
shall monuments and for ven ing ay additional
-1 ---I- ®Qcontrol points hown oneon ALTA survey,mprovrn-t plan,or
on electronic dots provided by Anderson Wahlen and
-I---I —I—_ ��6®4 a�pd" I II I� Associates. fie is yor shall el use the benchmarks as
- I -- ® shown on the plan,and verI&them against no less than three
_ ��" {{ I� I. existing hard improvement elevations included on these plans
I- -- -- iI®- or on electronic data provided by Anderson Wah/en and
Associates.K any discrepona-ore encountered, the surveyor
I I shall immediately notify the engineer and resort the
discrepancies before proceeding with any construction staking.
I ---I---I ---I--- -- I II it
—I-- I
PRNATE ENGINEERS N0710E TO CONTRACTORS
fie Contractor agrees that he sho//assume sole and
complete respa-bil ty for job site conditions during the
course of construction of this project,including safety of a//
IpI. I persons and property:that this requirement I shall apply continuouslyand not be limited to n-1 working h'- 25 May, 2021
If I� and that the contractor shall defend,indemnify, and hold the
II.... L owner and the engineer harmless from any and a//liability,
II II.I rea/or alleged in connection with the performonce of work SHEET NO.
on this project excepting for liability arising from the sole
negligence of the owner or the engineer