Loading...
HomeMy WebLinkAboutCivil_002_091421 C0.1 exist conditions --------\-- - °�, I oo I �` f ��a ip owANn P e rrce)1i�I Y ox .50) �ory u '",�7pA' 9 info �4tj0 0�^� 1 soI li FMD.0� ��� IF ..✓=';;;j / OHi�% � / i lid t1` "5 ao P�,�c 7� $'oHry yR Scale:P=30' II�, I b: ,I qq 30' 0 30" 60" I Existing Tiail ro Remain �a�` /.. ,� w'G Etry miry u er °,z gip. I• ;-48o6 g Remain l° +\��;: � / /�psP I�r - ��6�%® I I� General Demolition Notes: �,°'� Existing Asphalt t be d I �yst�,1I Hwy 1. DemohYion and site clearing for this contract are to include all areas # Existing Telephone f1 I / n9 shown within demolition limits b t H Removed within DeFpb%tion Line to Remain I ^ to R n or y note. Limits On/y p.' I / O ' 2 Refer to site improvement plans for more details on limits of removal 3. A//curbs,gutters, walks,slabs, walls,fences light rk asphalt, KiH�/ fiPSPJF 1 196ur I I wotedines and���ers,gas lines,sewer lines,light poles tinned cables _ I I i I storm d in and structures to be cleared from site unless Ekisting tree to I otherwise shown. o I I vacs Designed b 1 -'4810--____ I Pyop� be Removed I 113� �I ;I II 4. All utilities,sewer, water,gas, telephone and electrical services to be Y tl P`p y� III ,,y��II disconnected and capped according to cXy,county and utility company Drafted by.NE P`0 1\ � PHr p� I ` 19� h I. �shed`�ryI requiremenrs, unless otherwise shown. Cbent Name: o pp5 I es tl �4 I{I 5. Excavated areas to be backR/lad with clean granular material compacted CCA Acquisition ,l� irl�f E I� to 95[of maximum lab density determined b ASTU D 1557-78. Existing Underground I o o I pe ty roe y Power Line to Remain�I _ 1 h,acp (Tess results to be given to owner)Excavated areas shank/be backhr/ed per the geotechnirn/report Prepared for the project 27-097dm F fisting Asphalt to be IpI \ \ I �I 4, I II 6. Clear and grub trees shzbs,and vegerotion within cronstrvction limits, Removed Rhin Demolition / ICI li 1'I, 1p�' dispose/to be off-site except where noted otherwise. \ Limits Ono 7 DO NOT intermpt any services or disrupt the operation of any \ J 9pz I Ir Y I busmesses shown outside the demolition limits. W \ I \ Existing Asphalt to be Removed within Demolition III ,'I �il I 8.. Remove debris,rubbish,and other materials resulting from the Q Limits Only a 1 III demolition and site clearing operations hum the site and depose of in V `I I II/ I In a legal manner. 0 9. The location and/elevation of existing utilities as shown on these plans is based on records of the various utility companies and, where III possible,measurements token in the field. The information is not to be Q \ I � i p gk �I relied upon as being exact or complete Contractor shall contact 0., m \ \ I h8 I II II I n�oK I „p authorities having junsdarion for field rotations. Contractor shall be a responsible for an tection of in place and relocated utilities during z 3 yy construction. Z a Existing Concrete Pod ;. N� p o II �I 9 W to be R ved \ I p o° e° I W.Stockpiles sho//be graded to maintain slopes not greater than 3 J a, \l�n � ,l°' p �,Fisting Onvewy to I horizontal to 1 vertical.Provide erosion control as needed to prevent&Is = toring be Remonrd '� '� be Ralo ted and Revised, I %� sediment transport to adiacent d inage w vs. Q T �.w! I �� Refer to S'te Prof' 1 I o ,,p` pzP I 11.Contractor shall be responsible for disposal of o//waste motena/ 0 N Exi;(Ing Light Pate sPl d" I' Removed oar /, +,P--}- I Di /shall 6e at on moved site for such material.Burning onsite Z ° I is not permltted. O co E 12 Contractor shall verify with city any street removal, curb cut,and any % �_ Ps I ROHp i restoration required for util?y lice removal W lavfno I Fistng Striping 6°Ps __ i'- 1��.•- � __� II I HtiC W o I to be Remo l° j F II rE%' 13 Install t ffic warning devices as needed in accordance with loco/ Z N _ sting 19 I standards. Z Exsting Striping ---.I 'yy'��8_ to be RemovedEd, 9 I B�I .5 p�`1 I 14.Contractor shall obtain a//permit necessary for demolition hum City, a GutCu beanda� �00 County,State or Federal Agencies as required. �J ayop - lj Removed 11 �' 15.Demolish existing buildings and clear t m site (lnc/udog removal of al/ { \\ \ ���� r —, II 1 I footings and foundations.) v I 16.R ASBESTOS;s found n existing contractor the Asbestos must be removed in o legal manner by o contractor licensed to handle asbestos 1 Iry �-j IJ Erieting Tmnslomrf `L.III I morerials. (Not o port o!contract) to be Re/ocoted 11A, d I; 17.R Contractor observes evidence of hazardous materials or contaminated __ I I0 soils he shall immediate/ contact the ect en ineer to rovide e - - E ° 1 - -- - 9 p —�� 9 said mote and obtain minted before proceeding with disturbance of H"� ° off - _ I ed Po. / y� ° _j Fistin Asphalt ExisOn-F2e to p. I said material or contaminated soil. \ e J� to be Removed be Removed II 170' p A-- g _ within Demo/ltion / A 4:I°yodi' Ip 18.Limits of demolit/on/distu2ed areas shown on the plans may not 6e on Limit On/� ��-�Jaetint Memain o-,� imit of da o R is the cent ctar's responsibility to determine the to era for -- ads of ow ed. 7he /—� . Remain / � ('I I IN shall detemrinetthe area hof construction true boil F t he reantrac or contractor O I responsible restore a// patted areas and al/restoration shall be , _ I___��� h �/�/ �pI part the to bid�m O Fisting Storm Oroln �11 - @4', impact t tine to Remo �I-1-- -o °9" s ERR, --I--- 1� / 60R� Remain G Sidewa/i; CAUT7ON: \ (``-w�+ J?l �I Fisting Underground 1 I j\ The location and/or elevation of existing y V sex_- Power Lin. in to Remain fl tit'%Nes as shown on these plans is based on Vi tE records of the various utility companies and, o RE LLB - where possible,measurement token in the O m —�--- _ II hl Parr, 6� ° ---I--- — —_ �✓, tee me information is not m berelied o o le°��+ �° _--I_— ---I IN as being exact or complete. xo 1 dye- --- - F,'sting AsphoR to'b`P. Q0�' lu O� s ` vR ' v 1 — ova thin Derho%lion .e� fB '` °oA A°4 °EPA el p\ 55�d°�, _--- _ - Limit Ontv —�—['—{—�G—_—�I,pI�,�-gyp �`� _ � i_--____� e6 6�9 P Existing SrnpZgh to be redone to moFE I ��II- III oyl I rya --I--- I -- ion vementA;See site �a�_ � 9EGQH�R 9eyI!-I!l I -\ rl---I— I'�IIVII` rl I R, ----_---� 9 --I--- °5H Ifs ti° �� PO �--rye' o ° of�o gy. `Md�RORE`� — (0'otOGUR � __,GJJeIi saBcuwB) " - '��p�l f oo�RR �o� ° � I ly�y° II 15 Sep 2021 coep, cHopC ee fPc o fPCRI I :�co III SHEET NO. oR° eR_� �J° °°o c lI .R -4g1 D'