Josh and Sue, as requested we have completed the preliminary due diligence with the City of Bozeman. I spoke with
Griffin Nielson this morning and he was indicating that the sewer flows that we provided did not trigger the need for a
new sewer line. He wanted us to document the sewer flows and also make sure that the Cafe Rio water bill was from a
very similar size as the new Cafe Rio in the shopping center.
The City is quite difficult to deal with and it is difficult to get direct answers. What we have however found that Griffin
Nielson to be one of the more reasonable people at the city. He will be dealing with the sewer capacity and the traffic
study.
The following issues have been researched during our preliminary due diligence:
1. sewer flows for Homegoods and Cafe Rio will not trigger construction of the offsite sewer.
2. a traffic study needs to be completed to determined if offsite mitigation is required with the proposed new building.
The city has a level of service "C"That has to be achieved or mitigation may be required. Our research indicates that the
city is requiring upgrades to intersections where needed but only within the existing right of way. Many of the adjacent
intersections in question are mostly fully improved within the existing right of way. Thus the city would not normally
require any improvements even if the level of service is exceeded. We would recommend doing the traffic study as our
next step.
3. Impact fees for the two proposed new uses will total $55,647 for Cafe Rio and $252,888 for Homegoods.
4. the driveway on 15 North ave. will need to be relocated to 150'from the roundabout for a right in/right out or 330'
for a full access driveway.
5. storm water regulations will need to be planned for including a new detention basin at the northeast corner of the
property.
6. the ditch is not to be used for any storm water conveyance system. The ditch easement requirement is not know at
this time, however it should not have an impact on development.
7. the special improvement district projects that they are asking you to waive your objection to the formation of the
district, this is an old antiquated funding for city improvements. The city is not using them very often and is mostly
doing projects through general fund monies. This does not preclude the opportunity to protest the participation
percentage that they would like you to participate if one is formed. They are used most often now for street light
projects. If one is setup the city normally participates in the funding otherwise the residents will come out of the
woodwork in protest of the project.
8. Roundabout is not currently moving to construction. The roundabout layout is attached for reference.
9. the water rights in lieu of cash fees are estimated to be $13,774 for the Homegoods retail store.
Please review and let's plan a time to discuss. Thanks
Bret Wahlen, PE
President
Anderson Wahlen &Associates
2010 N. Redwood Road
1
Salt Lake City, UT 84116
D: 801.410.8502 1 C: 801.243.6000
0: 801.521.8529
www.awaengineering.net
-----Original Message-----
From: Griffin Nielsen<GNielsen@BOZEMAN.NET>
Sent: Thursday,January 17, 2019 5:19 PM
To: Bret Wahlen <bretw@awaeng.com>
Cc: Sue Jagodzinski <SueJ@kornwasser.net>;Joshua Binkley<JoshuaB@kornwasser.net>; Steven Usdan
<StevenU@kornwasser.net>; Ben Brown <bbrown@mtnwest.com>
Subject: RE: CCA Bozeman Shopping Center
Bret,
I've ran the model with the estimates provide and it does not appear that is a capacity issue. However, I have some
comments on the estimates that would be worth discussing before a formal submittal. I'll try and give you a call directly
to discuss.
Regards,
City of Bozeman MT
Griffin Nielsen, EITI Engineering Department
406.582.2280
gnielsen@bozeman.net
-----Original Message-----
From: Bret Wahlen <bretw@awaeng.com>
Sent:Thursday,January 17, 2019 9:56 AM
To:Griffin Nielsen<GNielsen@BOZEMAN.NET>
Cc:Sue Jagodzinski<SueJ@kornwasser.net>;Joshua Binkley<JoshuaB@kornwasser.net>; Steven Usdan
<StevenU@kornwasser.net>; Ben Brown <bbrown@mtnwest.com>
Subject: RE: CCA Bozeman Shopping Center
Griffin, I left you a voicemail message this morning regarding checking back with you on your verification that your
existing sewer system can handle our additional sewer flows. Please let me know what the results are to your analysis.
Thanks we really appreciate your help.
Bret Wahlen, PE
President
Anderson Wahlen &Associates
2010 N. Redwood Road
Salt Lake City, UT 84116
D: 801.410.8502 1 C: 801.243.6000
O: 801.521.8529
http://secure-web.cisco.com/lICCOgNPCNUPm_2SbWA4tCbE3zUsdothB78YkmWrky9G12xXbYLULjQgfj-
QzjFfwW EyCml_fFlwK4btagM-
QeesVxEbUcrijz_MTBjzBiZiouaCdb_4SkQasmpUokezrls2SR3MmKPDFCe9XBKxvUrOtHbG3WRQmJD8OzZEOUQTq-
G4_SMAuS72zPrBoLjp7pFmZRDWGby5NsH22z3QULRbin7gSGQcjKsk9gDNduBfmlJZnppHrN6ZTevngj F-jzdeHFTGEnTKN-
2
Bret Wahlen
From: Bret Wahlen
Sent: Thursday, January 7, 2021 12:56 PM
To: Griffin Nielsen
Cc: Sue Jagodzinski; StevenU; Ben Brown; Chad Moore
Subject: shopping center at 15th avenue and Main street
Griffin, a couple of years ago the shopping center referenced above requested that you run your sewer model for the
expansion of a Cafe Rio and Homegoods. (see email below) We had provided some water consumption numbers from
other existing facilities to run the model. At that time, you indicated that the existing offsite sewer in question had
capacity to handle the new growth without constructing a new sewer line. The shopping center has some new uses
including a 20,000 sf retail store. These uses will not exceed the consumption numbers we previously used. Would you
be able to confirm that the existing sewer main is still has the same remaining capacity, or if the system has had new
facilities that have maxed out the sewer line? Thanks for your assistance.
Bret G.Wahlen, PE
President
A'N 4XI
ANDERSON WAHLEN&ASSOCIATES
Anderson Wahlen&Associates
2010 N.Redwood Road
Salt Lake City,UT 84116
C:801-243-6000
D:801.410.8502
O:801.521.8529
troyw@awaens.com
www.awaengineering.net
From:Griffin Nielsen<GNielsen@BOZEMAN.NET>
Sent:Wednesday, December 19, 2018 4:33 PM
To: Bret Wahlen<bretw@awaeng.com>
Cc:Joshua Binkley<JoshuaB@kornwasser.net>; Sue Jagodzinski<SueJ@kornwasser.net>
Subject: RE: [External] Water Usage Data - Homegoods
Bret,
I would ask that you provide the peak-hour estimate for the proposed project (Cafe Rio) with the supporting
calculations. I can then use the PH estimate to verify capacity. Let me know if you have any additional questions.
Regards,
City of Bozeman MT
Griffin Nielsen, EITI Engineering Department
406.582.2280
g nielsen(ab-bozeman.net
1
303 S. Feder;;, --y
I �ff Boise, Idaho 83705
4MF Phone(208)376-9820
Engineering Consultants Incorporated www.eciboise.com
PROJECT—V -S �-0 0,� S U-'- t-') -,�(- 0 V PROJECT NO.
SUBJECT 'S I T- o L, SHEET NO.
PREPARED BY CHECKED BY DATE S-k 6 A