Project Name:Block 14 Minor Subdivision
Project Type(s):Subdivision - Pre-application PA
Street Address:Lot 1, Block 14, Blackwood Groves Subdivision Phase 2. South of Victoria
Street, west of Winterthur Ave, north of Blackwood Road, east of Canter Ave.
Legal Description:
Lot 1, Block 14, Blackwood Groves Subdivision Phase 2, Sec. 24, T. 2 S., R.
5 E. of P.M.M., City of Bozeman, Gallatin County, Montana.
Description of Project:
Minor subdivision to split Lot 1, Block 14 into two parcels that coincide with
the approved site plans on the Block.
Current Zoning:REMU Residential Emphasis Mixed-use District
Existing Use:Undeveloped
Proposed Use:Residential
Gross Lot Area:199809
Number of Buildings:0
Type and Number of Dwellings:0
Building Size (SF):0
Non-Residential Building Size (SF):0
Building Height (ft):
Affordable Housing (Y/N):Yes
Departure/Deviation Request (Y/N):No
Zoning Verification Expedited (Y/N):No
PROPERTY OWNER
Company Name:Blackwood Land Fund LLC
Name:Grant Syth
Full Address:115 W. Kagy Blvd, Suite L, Bozeman, MT 59715
Email:grant@bridgerlandgroup.com
Phone:(406) 539-6015
APPLICANT
Company Name:Bridger Land Group
Name:Matt Hausauer
Full Address:115 W. Kagy Blvd, Suite L , Bozeman, Montana 59715
Email:matt@bridgerlandgroup.com
Phone:(406) 599-9124
REPRESENTATIVE
Company Name:Bridger Land Group
Name:Matt Hausauer
Full Address:115 W. Kagy Blvd, Suite L , Bozeman, Montana 59715
Email:matt@bridgerlandgroup.com
Phone:(406) 599-9124
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal. This application PDF must also be
signed by the property owner(s) for all application types before the submittal will be accepted. The only exception
to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property
owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the
above information is true and correct to the best of my (our) knowledge.
Certification of Completion and Compliance - I understand that conditions of approval may be applied to the
application and that I will comply with any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in
compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance.
Property Owner Signature:
Printed Name:Grant Syth
CONTACT US
Alfred M. Stiff Professional Building phone 406-582-2260
20 East Olive Street fax 406-582-2263
Bozemn, MT 59715 planning@bozeman.net
www.bozeman.net/planning
PA
SUBDIVISION PRE-APP PLAT REQUIREMENTS
This handout provides details for application requirements outlined in the project checklists. The purpose of the pre-application
plan is to familiarize yourself with standards, goals, and objectives of the subdivision procedure. These requirements are
mandatory per BMC 38.220.030.
Subdivision Pre-Application Checklist Page 1 of 2 Revision Date: December 2021
SUBDIVISION STATISTICS
Subdivision Type:
First Minor Subdivision from a Tract of Record
First Minor Subdivision from a Tract of Record with Variance
Second or Subsequent Minor Subdivision from a Tract of Record
First Major Subdivision
Total Number of Lots:
Lots by Proposed Uses:
Residential, single household Industrial
Residential, multi-household Common Open Space
Townhouse/Rowhouse Planned Unit Development Open Space
Condominium Unit City Park
Manufactured Home Space Restricted Development
Commercial Other (i.e. Recreational Vehicle Space):
SUBDIVISION PRE-APPLICATION
PLAN CHECKLIST
DIGITAL SUBMITTALS & NAMING PROTOCOL
1. Create and submit a Planning application using the ProjectDox portal;
a. After completing your Development Review Application, you will receive a Notification Letter (example)
via email. Please download this document and obtain owner’s signature. Upload as a PDF to the “Documents” folder
in ProjectDox.
2. The digital copies must be separated into two categories: Documents and Drawings.
a. The Documents folder should include items such as application forms, narrative, response to City comments,
supplemental documents, technical reports, easements, legal documents, etc.
b. The Drawings folder should include items such as site plans, civil plans, landscape plans, photometric plans,
elevations, etc. All drawing files must be drawn and formatted for a 24” x 36” sheet file or 11” x 17” sheet file. Plan
pages shall be properly oriented in landscape mode. Refer to our Quick Guide for additional information;
3. Naming protocol. All files should be numbered and named according to their order listed on your provided Submittal Checklist.
File names should start with a numeric value followed by the document name. The numeric value at the beginning of the file
name ensures the order in which they are displayed. Refer to our Quick Guide for additional information;
APPLICATION SET
1. Sketch Map.
a. Names of adjoining subdivisions and numbers of adjoining certificates of survey, adjacent lot and tract lines;
b. Location, name, width, and owner of existing or proposed streets, roads, and easements within proposed subdivision;
Existing streets, roads, and easements within adjacent subdivisions and tracts; name of street or road providing
access from nearest public street or road to proposed subdivision;
c. Location of all existing structures, including buildings, railroads, power lines towers, and improvements within 100 ft.;
d. Zoning proposed for subdivision, if a change is contemplated and if an adjacent PUD is in place or proposed;
2. Topographic features. Topographic features of the proposed subdivision and adjacent subdivisions and tracts including embankments, watercourses, drainage channels, areas of seasonal water ponding, areas within designated flood-way, marsh areas, wetlands, rock outcrops, wooded areas, noxious weeds and areas of active faults.
SUBDIVISION PRE-APPLICATION
PLAN CHECKLIST
Subdivision Pre-Application Checklist Page 2 of 2 Revision Date: December 2021
REQUIRED FORMS
PA
Include copies of any permits listed in section 38.220.020 obtained for project;
3. Utilities. Existing and proposed utilities located on and adjacent to proposed subdivision:
a. Location, size, and depth of sanitary and storm sewers, water mains, and gas lines;
b. Location of fire hydrants, electric lines, telephone lines, sewage and water treatment, and storage facilities;
4. Subdivision layout.
a. Subdivision block, tract, and lot boundary lines, with numbers, dimensions, and areas for each block, tract, and lot;
b. Street location, right-of-way width, and name;
c. Easement location, width , and purpose;
d. Sites to be dedicated or reserved as park, common open space, or other public areas. Include boundaries, dimensions,
and areas;
e. Sites for commercial centers, churches, schools, industrial areas, multi-household units, manufactured housing community and uses other than single-household residences;
5. Development Plan. Development plan indicating future development of the remainder of the tract if phased development;
6. Name and Location. Title block with proposed name and legal description;
7. Notations. Conventional scale (i.e. 1:20 or 1/4:1), north arrow, name and addresses of owners and developers, and date of
preparation. Plan/Drawings must not contain disclaimers such as “Not to Scale” or “Preliminary” and “Not for Construction”;
8. Variances. A list of variance requests which will be submitted with the Preliminary Plat Application;
9. Waivers. List of waivers requested from the requirements of section 38.220.060. This list must be submitted with the pre-
application and an explanation of why such information is not relevant or was not previously provided;
10. Parks and Recreation Facilities. Information must be provided for all land proposed to meet parkland dedication requirements
a. Park concept plan; must include site plan for entire property, zoning and ownership for adjacent properties, location of
any critical lands, general description of land, and description of trails or other recreational features proposed to connect
the proposed park area;
b. If applicant intends to request approval for cash-in-lieu, a response to the cash-in-lieu review factors established by resolution of the City Commission;
11. Affordable Housing. Describe any intended use of 38.380 for creation of affordable housing within the subdivision;
12. Wildlife. Describe key wildlife habitat issues associated with proposed subdivision, consideration of fish and wildlife resources, and early planning suggestions (Designated species of concern, potential impacts on wildlife and wildlife habitat) from local FWP field biologists;
13. Waivers of right to protest. Include copies of or recorded document numbers of all existing waivers of right to protest;
14. Water Rights. Describe how proposed subdivision intends to satisfy section 38.410.130 and provide documentation of all water rights appurtenant;
15. Agricultural water user facilities. Identify location of all agricultural water user facilities and contact information for
representative per 38.360.280.
APPLICATION FEE
For most current application fee, see Schedule of Community Development fees. Fees are typically adjusted in January.
CONTACT US
Alfred M. Stiff Professional Building
20 East Olive Street
PO Box 1230
Bozeman, MT 59715
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net/planning
Pre-Application
Subsequent Minor Subdivision
Lot 1, Block 14, Phase 2
BLACKWOOD GROVES
Block 14 Minor Subdivision
June 2023
Page 2 of 4
I. INTRODUCTION
This application proposes to subdivide Lot 1, Block 14, Blackwood Groves Subdivision, Phase 2 into 2
parcels. This application is a subsequent minor subdivision as the proposal only creates one new parcel.
The north lot (Lot 1A) will contain the Block 14 cottages (site plan approved - #22324) and the south lot
(Lot 1B) will contain the Block 14 Arbor Houses (site plan approved - #23043). The property is currently
undeveloped but building permits for several of the cottages have been obtained and construction for
the cottages on the north half of the block is anticipated to commence in June 2023. The proposed lot
line will run down the center of the private alley that separates the two projects.
II. UTILITILES
The existing utilities are included on the Pre-Application Plat Map submitted with this application. The
water and sanitary sewer mains and services have been stubbed into the property. The water and
sanitary sewer main extensions proposed within the private drive aisle are located within an existing
BLACKWOOD GROVES
Block 14 Minor Subdivision
June 2023
Page 3 of 4
30-ft public utility easement. Stormwater runoff conveys to the Subdivision’s stormwater
system/facilities.
III. DEVELOPMENT PLAN
Construction of the cottages on the north half of the Block is commencing in June 2023. The building
permit applications for the Arbor Houses (Lot 1B – southern portion) will be submitted in early July
2023 with construction anticipated to commence in the fall of 2023.
IV. VARIANCES
No variances are proposed with this subdivision.
V. WAIVER REQUESTS
The following waivers from the requirements of BMC section 38.220.060 are requested:
1. Surface Water. The subdivision area does not contain any natural or artificial water systems.
2. Floodplains. The subdivision area does not contain any natural or artificial water systems and
their associated floodplains.
3. Groundwater. The groundwater depths were reviewed as part of the overall subdivision
permitting of the Blackwood Groves Subdivision. These groundwater depths are known and
are accounted for in the project design.
4. Geology; soils; slopes. There are no geologic hazards or unusual features located within the
proposed subdivision. The site slopes gradually to the north/northwest – the existing
contours are included on the pre-application plat map. The geotechnical report for the overall
Blackwood Groves Subdivision was reviewed as part of the subdivision permitting process.
Recommendations from the geotechnical report will be followed within this development.
5. Vegetation. There are no known critical plant communities within or adjacent to the
subdivision area. The perimeter of the parcel has been disturbed by the Phase 2
infrastructure construction. The subdivision area was previously cultivated for wheat and
alfalfa so no native vegetation was found within the proposed subdivision area. Noxious weed
management is ongoing in accordance with the approved Memorandum of Understanding for
the overall Subdivision with the Gallatin County Weed Department.
6. Wildlife. There are no known endangered species or species of concern which use the area
affected by this subdivision. The proposed subdivision is surrounded by City streets and is
urban in nature. There are no known critical areas located within the subdivision area.
7. Agriculture. There are no current agricultural uses within or adjacent to the subdivision area.
8. Agricultural Water User Facilities. There are no agricultural water user facilities on or adjacent
to the subdivision area.
9. Water and Sewer. The water and sanitary sewer design reports were previously approved for
all proposed dwelling units during the site plan review for the Cottages (#22324) and the
Arbor Houses (#23043). This subdivision does not propose any additional dwelling units or
uses beyond those that have been previously approved.
10. Stormwater management. The stormwater management design reports were previously
approved for the proposed development during the site plan review for the Cottages
(#22324) and the Arbor Houses (#23043). No changes to these stormwater management
plans are proposed.
11. Streets, Roads, and Alleys. There are no new public streets, roads, or alleys proposed with this
subdivision. This subdivision does not include any additional dwelling units or traffic impacts.
BLACKWOOD GROVES
Block 14 Minor Subdivision
June 2023
Page 4 of 4
The public streets surrounding the subdivision have all been installed and dedicated to the
City. There is a private drive aisle that runs through the south end of the property which has a
shared-access easement attached to it as it provides access to both Lot 1A and Lot 1B.
12. Non-Municipal Utilities. The non-municipal utilities have already been installed around the
perimeter of the proposed subdivision and connection is readily available for the projects
proposed within this subdivision.
13. Land Use. The land uses within the proposed subdivision are fully known with the approved
site plan applications for the Cottages (#22324) and Arbor Houses (#23043).
14. Parks and Recreation Facilities. This subdivision does not propose any new dwelling units. The
parkland requirements have been satisfied by the Blackwood Groves Subdivision as reviewed
and approved by the review of the site plan applications for the Cottages (#22324) and Arbor
Houses (#23043).
15. Neighborhood Center Plan. The subdivision does not include a neighborhood center plan. The
neighborhood centers for the overall Blackwood Groves Subdivision were reviewed and
approved by the Master Site Plan/Preliminary Plat review of the Subdivision.
16. Lighting Plan. No additional public or private lighting is proposed with this subdivision.
17. Miscellaneous. There are no other special considerations for this subdivision – the proposal
does not effect public access to public lands, there are no known health or safety hazards on
or adjacent to the subdivision, and the property is not located within the wildlands-urban
interface.
18. Affordable Housing. The subdivision does not propose any new dwelling units and is not
subject to any affordable housing requirements.
19. Adopted Growth Policy Plan. The subdivision does not have a measurable impact on the
Growth Policy Plan as it does not include any additional dwelling units or uses beyond those
approved with the underlying Master Site Plan/Preliminary Plat and the site plan applications
for the Cottages (#22324) and the Arbor Houses (#23043).
VI. WAIVERS OF RIGHT TO PROTEST
Waivers of right to protest were filed with the underlying Blackwood Groves Subdivision.
VII. WATER RIGHTS
Cash-in-lieu of water rights (CILWR) were paid for the Block 14 Cottages (#22324) and the value of the
CILWR for the Block 14 Arbor House (#23043) is known and will be paid prior to securing building
permits for the buildings.
EXHIBIT "B"
WAIVER OF RIGHT TO PROTEST
CREATION OF SPECIAL IMPROVEMENT DISTRICTS
BLACKWOOD GROVES ANNEXATION
The undersignedowner of therealpropertysituatedinthe County of Gallatin,Stateof Montana,
and more particularlydescribedas follows:
The S ½,SW ¼of Section24,and the N ½,N ½,NW ¼of Section25,Township 2 South,
Range 5 East,P.M.M.,GallatinCounty,MT,except thatpartconveyed to the Stateof Montana
forhighway right-of-waypurposes forSouth 19th Avenue,StateProjectS 243(1),by bargain
and saledeed,recordedin Book 144 of Deeds,Page 148.
Also,a portionoftheadjacentrightof way of South 19*Avenue,StateProjectS 243 (1).Said
propertyisalldescribedas follows:
Beginning atthecenter-southone-sixteenthcornerof saidSection24;thence southerly
181°24'39",assumed azimuth from north,1316.63 feetalong the eastlineof the Southwest
Quarter of saidSection24;thence southerly181°44'45"azimuth,666.45 feetalong the east
lineof the Northwest Quarter of saidSection25;thence westerly269°57'02"azimuth,2599.67
feetalong the south lineof theNorth Half of the Northwest Quarterof saidSection25,tothe
eastrightof way lineof South 19*Avenue,StateProjectS 243(1);thence continuingwesterly
269°57'02"azimuth,100.00 feetto the west rightof way lineof saidSouth 19thAvenue;
thence northerly001°09'12"azimuth,665.32 feetalong thewest rightofway lineof saidSouth
19thAvenue;thence easterly090°54'40"azimuth,50.00 feetalong the south lineof the
Southeast Quarter of Section23,Township 2 South,Range 5 East to the southeastcornerof
saidSection23;thence easterly089°50'46"azimuth,50.00 feetalong thesouthwest cornerof
saidSection24;thence northerly000°02'23"azimuth,1331.71 feetalong the eastrightof way
lineof saidSouth 19thAvenue;thence easterly090°15'00"azimuth,1300.25 feetalong the
northlineof the South Half ofthe Southwest Quarter of saidSection24;thence easterly
090°15'03"azimuth,1337.87 feetalong saidnorth linetothe pointofbeginning.
Area =5,270,255 square feetor 120.9877 Acres or 489,615.85 square meters.Subjectto
existingeasements.
IN CONSIDERATION of receivingapproval for annexation of the subjectpropertyfrom the
City of Bozeman,along with accompanying rights and privilegesand for other and valuable
consideration,the receiptofwhich ishereby acknowledged,and inrecognitionof theimpactstoa)South
19*Avenue,b)South 11*Avenue,and c)Blackwood Road and signalizationor othertrafficcontrol
improvements forthefollowingintersections:d)Blackwood Road and South 19*Avenue,e)Blackwood
BLACKWOOD GROVES Annexation Agreement 19
Road and South lithAvenue,f)Blackwood Road and South 3rdAvenue,g)GoldensteinLane and South
3rdAvenue,and h)GoldensteinLane and South 19thAvenue which willbe caused by the development
of the above-describedproperty,the owner has waived and does hereby waive for itself,itssuccessors
and assignsforeverthe rightto protestthecreationof one or more specialimprovement districtsforthe
design and engineering,constructionand maintenance of following improvements:lighting,paving
and subgrade material,fiberopticconduit,curb/gutter,sidewalk and shared use paths,and storm
drainage facilitiesfor a)South 19thAvenue,b)South lithAvenue,and c)Blackwood Road and
signalizationor other trafficcontrol improvements for the following intersections:d)Blackwood
Road and South 19thAvenue,e)Blackwood Road and South lithAvenue,f)Blackwood Road and
South 3rd Avenue,g)Goldenstein Lane and South 3rdAvenue,and h)Goldenstein Lane and South
19thAvenue.
Landowner agrees the City has the sole rightto controlthe design and constructionof such
improvements and may include any of the above components and othersnecessary to ensure such
improvements comply with all adopted City infrastructureplans and requirements.Further,the
Landowner waives itsrightor to make any writtenprotestagainstthe sizeor area or creationof the
districtbe assessedin response to a duly passed resolutionof intentionto createone or more special
improvement districtswhich would includetheabove-describedproperty.
In theevent a SID isnot utilizedforthecompletion of theseimprovements,the developer agrees
to participatein an alternatefinancingmethod forthe completion of saidimprovements on a fairshare,
proportionatebasisas determined by the City on the basisof the square footage of property,taxable
valuationof the property,trafficcontributionfrom thedevelopment or a combination thereof.
This waiver ismade forthe benefitof thepropertydescribedhereinshallbe a covenant running
with the land.
BLACKWOOD GROVES Annexation Agreement 20