HomeMy WebLinkAbout702 E MAIN SEWER DEMAND CALCS702 EAST MAIN, BOZEMAN MT PLUMBING SANITARY SEWER CALCULATIONS February 5, 2024 Page 1 of 2 ____________________________________________________________________________________ Following is the drainage fixture unit count and sanitary sewer demand flow rate of the 702 East Main Project. Referenced codes are UPC 2021. Chapter 7 and Appendix C. Peak Demand Flow Rate: 24 GPM / 48 Total Drainage Fixture Units Calculations and Estimates certified by J. Brain Goveia, PE – License No. 59813
702 EAST MAIN, BOZEMAN MT PLUMBING SANITARY SEWER CALCULATIONS February 5, 2024 Page 2 of 2 Referenced codes are UPC 2021. Chapter 7 and Appendix C. Table 1: Drainage Fixture Count